NAVEEN RAJKUMAR
Certified Lean Six Sigma Green Belt
**** **** ******, *** # ***, Detroit, MI 48201 act66i@r.postjobfree.com 971-***-****
SUMMARY
Masters Student in Industrial Engineering, specializing in Lean Operations Management
Knowledge of Operations in Natural Gas Utility Industry
Hands-on experience with continuous improvement programs including employment of Lean and/or Six Sigma (DMAIC) Tools and Methodologies
EDUCATION
Master of Science in Industrial Engineering Expected: May 2016
Wayne State University, Detroit, USA GPA: 3.59/4.0
Bachelor of Engineering, Production Engineering May 2014
Madras Institute of Technology, Anna University, India GPA: 8.71/10.0
TECHNICALSKILLS
Lean Tools (Value Stream Mapping, 5S, Key performance Indicators (KPI), Kaizen)
Corrective Action (8D Methodology, 5Why, Root Cause Analysis (RCA), Process Mapping)
Statistical Data Analysis, Total Quality Management, Ergonomic Analysis
SOFTWARE SKILLSET
Application: MS Office, SAP (Basic) Simulation tools: AutoCAD, ProE, SolidWorks
Statistical Software: Minitab, JMP Database Systems: SQL, ACCESS
Optimization Software: Llamasoft Supply Chain Guru, QM
WORK EXPERIENCE
Continuous Improvement Co-op, DTE Energy, Detroit, Michigan May 2015-Present
Conducted Vehicle Accident Statistical Correlation Analysis
Factor Identification
Pareto Analysis
Heat Map Generation
Root Cause Analysis
Cost Analysis
Bench-marking with other utility companies to identify Best Practices around Vehicle Safety
Assist Field Supervisors with implementing 5S technique in Field Service Vans and Trucks and conducted Productivity/Time Studies
Assisted in revising Hazard/ Risk Assessment worksheets for all DTE Gas Service Stations updating them with potential hazards and preventive measures
Coach Supervisors to utilize CI principles, tools to improve, and align the way work is performed and assist them in CI audits
Developed and generated weekly and monthly reports with the following Key Performance Indicators (KPIs) from the SAP database:
OSHA, DART and Serious Incident Injury Rate Calculations
Operational Safety Best Practices Tracking
Safety Training Compliance
Corrective Action Tracking
Created Standardized work procedures for generating weekly and monthly reports from the SAP database
Participated in accident investigations utilizing Human Performance Tools like: Twin Analysis, 5 Why and Root Cause Analysis to identify Causal Factors and recommend Corrective Actions to reduce the likelihood of accident recurrence
Focusing on the trend change in Performance Metrics for the service operation in the gas company such as Time commitment, First En-route,Productivity, Utilization and Leak Response
Updating Metrics on the PRT board for the weekly huddle meeting and suggesting areas of Improvement for a better Field Service Operation
Suggesting the plant manager on the crew size for the future year using forecast models utilizing the data on the number of service operations performed for the previous years
Student Assistant- Office of Environment Health & Safety, Wayne State University Oct 2014 – May 2015
Worked on a project to reduce Non-Value activity in shipping of dangerous goods by developing a new web based system to improve customer service and reduce the time consumed
Maintained records and documentation including training records and lab inspection reports
Completed Radiation Awareness training for proper handling of radioactive materials
Preparation of transfer orders and assistance in preparing the waste request orders for the research labs
Quality Intern-Rane TRW Steering Systems Ltd, Chennai, India May-Oct 2013
Assisted my supervisor in performing lean activities such as 5S, Value stream mapping (VSM) and Process mapping
Evaluated human work systems, using human factors engineering and ergonomic principles to optimize usability, quality and safety
Supported quality engineers in developing standard operating procedures in compliance with the ISO/TS 16949 Quality Management System
Assisted quality manager in facilitating Kaizen Events with cross-functional teams to continuously improve manufacturing operations by eliminating waste
Engineering Intern- IP Rings Ltd, Chennai, India Apr-Sep 2012
Worked on the resolution of customer complaints by performing 8D, 5 Why’s and Root cause analysis (RCA) and assisted in developing corrective actions as appropriate to eliminate the recurrence
Used Interviews, Time and Motion study to gather and analyze data, identifying opportunities for process improvement changes
Reviewed production schedules, operating parameters, engineering specifications, drawings to obtain knowledge of manufacturing methods and procedures
ACADEMIC PROJECTS
Reducing Non Value Added Activity in Operations through Kitting Apr-Aug 2015
Identified operator cycle time as a major waste through Pareto Analysis, 5 Why's and 8D techniques. Proposed Kitting technique as a solution to reduce the operator waste walk by incorporating 5S, 3M, Poka-Yoke and developed a value stream map to show the current and future state of the process
A Case Study on Defects Reduction by Applying Six Sigma and DMAIC Methodology Jan-May 2015
Studied the empirical application of Six Sigma Principles and DMAIC within a Rubber Gloves Manufacturing Process. Gained understanding to investigate defects, root causes and and provide a solution to reduce/eliminate these defects
Optimization of Profit by Flight Assignment using Deterministic Optimization tools Sep-Dec 2014
Considering six different airports with three different fleets of aircrafts, average demand & average revenue obtained over a period of time in the select routes, we developed a deterministic model using MS Excel to assign flights and schedule the routes in a way to maximize profit
Reduced Process Variations across two different plant laboratories in a chemical plant Sep-Dec 2014
Utilized Minitab’s Statistical Process Control tools such as ANOVA, Measurement System Analysis (MSA) and T test and reduced product impurity by 10%, Reported Quality metrics by producing SPC charts
Surface Texturing on Piston Rings for Improvement in Wear Behavior Jan-Apr 2014
Utilized laser based texturing to create three different dimples/patterns on the surface of the piston rings, in order to improve the quality of the piston ring and improve its efficiency by over 10%
Design and fabrication of a Snake like Robot Jul-Dec 2012
Designed and fabricated a snake like robot for assessing the quality of pipes and for gas leak detection in refineries, funded by Centre for Technology Development and Transfer, Anna University, Chennai, India
RELATED COURSEWORK
Deterministic Optimization
Lean Operations and Manufacturing
Applied Engineering Statistics
Project Management
Total Quality Management
Six Sigma
Process Engineering