Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Saudi Arabia
Posted:
November 29, 2015

Contact this candidate

Resume:

ADEEL HASHIM

Project Engineer (E&I)

Al-Jubail Saudi Arabia - Cell: +966-568593316-0555316594

E-mail: acsmoe@r.postjobfree.com

Career Summary:

** **** ********** ** *** field of E& I : KSA EXP 05 YEARS

I have worked in Construction, Engineering, Maintenance and Projects in leading national / international companies. I have Additional Experience of managerial position. I have good understanding of Electrical Drawings, planning projects.

Key Skills:

Expertise in planning, designing, budget estimation and resource allocation

Proficiency in understanding and interpretation of applicable international codes and standards such as ANSI, IEEE, IEC, NEMA, NFPA, SABIC and ARAMCO standards

.

Personality traits:

Excellent communication and analytical skills

Motivated and goal oriented

Good team player

Professional Experience:

COLFAXFLUIDHANDLING through

Bezel Arabia Company Ltd. OCT 2015 TO DATE

Working as Project Engineer at regional head office COLFAXFLUID HANDING ( ARAMCO APPROVED VENDOR FOR API 614 SKIDS).

Job responsibilities as below:

To Review and finalize Project documents (E&I) part for ARAMCO approvals.

To Design / Prepare: P&I (E&I Part), Instrument Data Sheets, Instrument LIST / Schedule, Wiring diagram, Junction box.

To review ARAMCO STANDARDS 32-SAMSS-13, 34-SAMSS831, 34-SAMSS-821, SAES-P-104, SAES-P-101, 104, 111. SAES-J-902, 904,002,200,300,400 and related standards for motor, cable, control valves, etc if required.

To comply the ARAMCO comments on returned drawings documents after review of related standards and requirement of that Plant.

Finalizing the PIM (E&I part), procurement assistant (E&I ) part, Manufacturing of Skid ( E&I ) part.

SUB CONTRACTOR EXPERIENCE AS Bezel Arabia Employee for SADARA and SWCC AND SABIC Projects.

-Project Manager (E&I) Feb 2014 to Sep 2015

-Project Engineer (E&I) Dec 2011-Jan 2014

SADARA - POLYETHYLENE TRAIN 2 PROJECT:

Worked as Project Head ( E&I) at construction of Polyethylene Plant Train # 2 SADARA ( Joint venture of Dow chemicals and ARAMCO).

Working as sub-contractor to L&T ATCO to complete the construction activities Including:

1)LV Panel Installation

2)Battery and Battery racks installation

3)Cable Tray Installations

4)Cable Laying

5)Cable Gland & Termination

6)Instrumentation Calibration (Only Supervision No hands on Experience)

7)Instrumentation Installation

8)Conduit Installation

9)Junction box, MCS installation

10)Lighting pole, lighting fixture, lighting socket installation

11)Grounding cable and pads installation

SWCC Ras Al khair Power Plant

Successfully completed the project in SWCC Ras- Al-khair Power Plant, with EPC contractor SEPCO-3 Project under Arabian Etimaad (managing contractor)

Scope: Installation of fuel oil system equipment for six generating stations in 2400 MW power plant. Installation of LV Room equipment and panels of make Petro gas and Atlas Copco. Equipment installation consists of Installation of Motors, Batteries, PLC system related cable laying and terminations.

Responsibilities:

To execute the work as per plan - schedule and client requirement

To Manage available manpower, material and tools as per work front and schedule of work

To Monitor work progress and Invoicing issues

To carry out daily site meeting with the engineers / supervisors regarding the different issues of site.

To carry out daily meeting with client regarding the work executed, work front, quality, drawing issues, invoice problems, site obstacles and all other related site issues.

To carry out frequent meetings with company top management regarding the work progress and site issues.

AL Razi SABIC KSA Project.

Revamp 08 no of Low voltage Mitsubishi 1000A panels with new ones.

Revamp of 02 DC Distribution panels in SS#1 AL Razi Plant no 01

HOME COUNTRY PAKISTAN EXPERIENCE:

Dewan Cement Company Ltd.

DY Manager in Engineering &Maintenance Department Dec-2004 to Nov-2011

Responsibilities:

Preparing progress reports and monitoring project.

Prepare and review scope of work, materials, specifications and drawings

Preparing engineering studies, drawings and documents, after review of that

Study and Review material and equipment specifications.

Plan, supervise and execute plant yearly turnarounds within budget and planned time

Prepare, update and review job plans, work instructions and procedures for electrical maintenance

Ensure availability of spares and timely procurement of spares

Also, worked on projects having below scope:

Installation of Pack house Haver and Boecker Germany Vendor

Installation and commissioning of LV system –Siemens Pakistan

Installation and commissioning of MV switchgear – ALSTOM Pakistan

Installation and testing of PLC system –Siemens S 7 –PCS 7 System

Lucky Cement Company Ltd., Jan-2003 to Nov-2004

E&I Engineer

Worked as shift Engineer E&I in Raw Mill area.

Responsibilities:

Maintenance of LV Room (MCC)

Inspection of Motors (Vibration and motor bearing sound observations)

To log out fault report for general maintenance

Schedule routine maintenance of electrical equipment like motors, MCC (Circuit Breaker and contactors).

Inspection of motor greasing and lubrication requirements

Spare management of the electrical Equipment in the plant.

To control program, maintain, repair and modify the software and hardware of the control system (Siemens PLC), PLC ladder logic.

Worked on Foxboro DCS, Modicon, Allen bradely PLC systems.

Academic Qualifications:

Bachelor of Engineering in Electronics (4 years) 2002

PMP Project Management Training (35 PDU) 2014

Diploma in IT (1 year) 2002

Professional Affiliations:

Member of Pakistan Engineering Council Member Ship No: ELECTRO/7101



Contact this candidate