Post Job Free

Resume

Sign in

Electrical Engineer Maintenance

Location:
Kot Addu, Punjab, Pakistan
Posted:
November 29, 2015

Contact this candidate

Resume:

Muhammad Imran Akhter

SENIOR ENGINEER

ELECTRICAL DESIGN

MOBILE

+923*********

PHONE

+926********

EMAIL

acsmla@r.postjobfree.com

SKYPE: Imranakhter100

Passport: CE1343912

Http:

www.linkedin.com/ Muhammad imranakhter

ADDRESS

Ward No. 6, House No.365

KotAddu, MuzaffarGarh. Punjab. Pakistan

GENDER

Male

DATE OF BIRTH

15th August 1983

NATIONALITY

Pakistani

CAREER OBJECTIVE

To work for a reputed organization which fosters a competitive environment and where personal growth and career enhancement is encouraged.

QUALIFICATIONS

Degree in Electrical Engineering from University of Engineering and Technology Lahore

PEC Certified Professional Engineer

ACHIEVEMENTS

Design and Project Management

Successfully Designed Electrical system for following Projects:

DHDS, PARCO

Makori (MOL),

ADHI-III (PPL)

Demir Dagh(Oryx) in Iraq

BP Kirkuk Baba, BP in Iraq

Operation Eastern Reach, Coastal Energy in Thailand (Off Shore)

Completed technical evaluations of equipments:

Gas Turbines Generation

HV and LV Switchgear

UPS and Charger

Cables

Transformers

Power Management System

Supervised various projects including installation & commissioning of HV/LV switchgear panels, interlocking schemes, verification of Electrical schematic and control system drawings, Start/Stop and Trip interlocks, auxiliary systems etc.

Maintenance

Prepared FEED of 132KV Bay extension projects at 02 plants of PARCO.

Performed complete protection coordination study of electrical protection.

Prepared and implemented a well reliable earthing system for telecom sector

Prepared a 30 Years Business Plan for Siemens

Prepared an energy saving plan for PARCO stations of Shikarpur and Fazilpur.

Prepared a plan to store Optimized spares at proper locations for maintenance.

Prepared a PM plan which reduced CM of equipments.

Prepared, updated and reviewed SOP’s for electrical maintenance

Prepared and inventory of spare parts for Ware House.

ABILITIES

Detailed Design

Hands on Abilities of more than 5 years for Detailed Design, sizing, preparing data sheets, specifications RFQ’s and Tech. Evaluation of:

Power Generation Requirement.

Switchgear

Transformer

Cables

UPS

Motors

Hands on Abilities for preparation following deliverables:

Load List

Cable Schedule

Single Lind Diagram

Hazardous Area classification Drawing

Earthing, Cable and Lighting Layouts

Earthing, Lighting, Power and Bulk MTO

Schematics and Control Diagrams

Interconnection Diagrams

DB and JB Design and Layout Drawings for shop fabrication

Ability to review Bid documents to prepare technical Bid

Ability to perform ETAP Studies for Load Flow, Short Circuit, Relay coordination and Motor Starting studies for simulated results

Lighting Studies using Dialux

Maintenance

More than 4 years of experience as an Electrical Engineer in Maintenance of following equipments:

220KV and 132KV Grid Station equipments i.e. CVT, Isolators, CT’s, PT’s, SF6 breaker, Surge arrestor, Power Transformer

SF6 Circuit breakers

Power Transformers

HV and LV Switchgear and MCC

UPS and Charger

HV and LV motors

Deep understanding of preventive maintenance procedures and methods

Proven ability to work in difficult situations with Strong analytical and problem solving skills furnished with Extensive experience of project management

Hands on experience of using following equipments :

Transformer Oil Di-electric Strength Test Equipment,

Transformer Oil filter Machine,

Micro Ohm Meter,

Cable fault Locator,

Meggar etc.

PROFESSIONAL EXPERIENCE

DRAKKEN, April 2014- Present

www.drakken.co

Senior Engineer electrical Design

Being an Electrical design lead, I am involved in preparation of all documents related to basic and detailed engineering phases in domain of Electrical System Design.

1.Proposals

Successfully prepared and submitted following proposals:

Grey Owl, Newalta in Canada

Stubb Creek, Petrofac in Nigeria

Swara Tikka, Schlumberger in Iraq

Oil Serve Yadavaran, ENI Zubair in Iraq

Prepared MTOs for Lighting, Earthing and Power

Estimated Man-hours for Proposals.

Material Take OFF MTOs of Earthing, lighting, cables, bulk etc.

2.Projects

Successfully completed following projects in Detailed Engineering:

Demir Dagh, Oryx in Iraq

BP Kirkuk Baba, BP in Iraq

Operation Eastern Reach, Coastal Energy in Thailand (Off Shore)

Presson Descon International Pvt Limited PDIL, May 2012 –April 2014

www.pdil.com

Senior Engineer Electrical Design

Being an electrical design lead, had been involved in technical documents preparation for proposal, engineering activities of project and preparation / reviewing of engineering deliverable of electrical for Basic and detail engineering.

1.Proposals

Successfully prepared and submitted following proposals in Pakistan:

ADHI-III, PPL (Awarded as Project)

GAMBAT SOUTH, PPL (Awarded as Project)

SARA West Gas Field, OGDCL

MELA, OGDCL

Prepared BOQ’s/ MTO’s of lighting, power and earthing layouts.

Prepared Technical Evaluation of Vendor Quotes

Manpower Estimation of project

Prepared design Basis, data sheets for proposals

2.Projects

Successfully completed following projects in Detailed Engineering:

MAKORI, MOL project of Makori GPF EPCC Project with 20000 BPD Oil, 10000 BPD Condensate, 150 MMSCFD Gas, 450 MTon/day LPG Handling Capacity

ADHI-III, PPL project with handling capacity of 30MMSCFD LPG, and 5330 BPD Oil

Prepared Vendor Quotes evaluations of following:

Generator (Gas Turbines, Gas and Diesel Generator

Switchgear

Transformer

UPS

Cable

Prepared Specifications and Data sheets of equipments Gas and Diesels engines, MV or LV switchgear, UPS, transformers, cables etc.

Prepared Sizing Calculations for following:

Power Generation Source including Gas Turbine Driven and Engine Generation System

Diesel Generator

Power and Distribution Transformer

LV and MV Switchgear

AC and DC UPS

Coordinated project activities with other design disciplines, with client personnel and with vendors for vendor item Packages.

Pak Arab Refinery (PARCO), March 2008 – May 2012

www.parco.com.pk

Electrical Engineer

I had been working as in-charge of S&T Maintenance (Electrical) in PARCO and completed following tasks:

1.Maintenance

Successfully achieved Maintenance of following Electrical Equipments without LTA:

220 & 132KV Grid Stations (Isolators, CT’s, CVT’s, PT’s, SF6 breakers, SA, Power Transformers)

LV, MV and HV switchgears and Motors

UPS

Lighting

Carried out following Power/Distribution Transformer Tests:

TTR (Transformer Turn Ratio) Test

Megger

Winding Resistance Test

Short Circuit Test etc

Successfully performed relay testing using Secondary Current Injection Test Sets(SEVERKER, ISA, Model DRTS-6 ) of following relays:

Over Current Phase / Earth Fault Relay,

Differential Relay

Synchrocheck Relay,

Motor Protection Relay

Reverse Power Relay

Under / Over voltage Relay

Power factor Relay

Organized electrical maintenance activities to maximize plant availability.

Achieved minimum plant breakdown through

Proper planning and preventive maintenance of equipments.

Proposed an improvement plan for the electrical distribution system of existing facilities.

Prepared and managed Electrical Maintenance budget.

Prepared, updated and reviewed Job Plans, Work Instructions and SOP’s for electrical maintenance.

Prepared design package, Scope of work, BOQ, conceptual drawings and tender documents for electrical related plant modifications.

Prepared technical specifications for spare parts & evaluate the received offers.

Maintained ware house inventory of Electrical

Designed and implemented control and protection schemes for different feeders, substations and Grid stations.

2.Project Management

Planned, Designed and supervised the projects 132 KV Grid Stations

Successfully completed installation, testing and commissiong of LV/MV/EHV switchgear panels, Transformers, 132 KV grid station equipments, protection relays, energy meters etc for system improvement and redundancy.

Successfully issued following detailed engineering calculations and drawings for DHDS project

Single Line Diagrams

Lighting, earthing and Power layouts

Schematic Diagrams

Cable schedules

Identified and set short and long term plans for DHDS project.

Prepared FAT and SAT procedures of equipments.

ORASCOM Group of Companies, Jan 2007 –March 2008

www.otelecom.com

Electrical Engineer

Successfully performed Operation/ Maintenance of following without LTA:

Gensets (Alternator and Generator)

ATS Panel and Distribution Panel.

UPS and Rectifiers (Delta and Emerson).

Firefighting system and fire alarm system (Kilsen + Zeta).

Stulz Air Conditioners and Split Air Conditioning System.

Earth testing.

Electrical Power, air conditioning and environmental issues.

Troubleshooting of Circuit and Replacement of Electrical Components.

Siemens Pakistan Pvt Ltd, Feb 2006 –Jan 2007

www.siemens.com.pk

Trainee Electrical Engineer

Visited Sites on client’s request to diagnose and rectifying problems on the basis of inspection and then finally submission of detailed study report.

Completed short circuit study, harmonic analysis, and protection coordination studies for clients of textile sector.

Designed electrical system diagram for clients.

Prepared a business plan by collecting data of Siemens equipments like CB’s, CT’s, PT’s, etc. from all public and private clients and visiting their sites particularly substations.

EDUCATION

Bsc Electrical Engineering (Power), December 2005

University of Engineering and Technology, Lahore Pakistan

CERTIFICATIONS

Pakistan Engineering Council, June 2006

TRAININGS

1.Gas Plant Commissioning by HCMD PDIL

2.Introduction to Oil and Gas Processing by MDC DESCON

3.Moving Up The Ladder by HCMD PDIL

4.Maintenance Management by PIMS Karachi

Comprehensive training on Management of Plant Maintenance

5.Power System Protection by Siemens

Detailed Ideas of Power System Protection

6.Emergency Response Team by PARCO HSE

To help fire crews in case of any emergency in plant.

7.IEC & NFPA codes by PARCO HSE

For hazardous area classification.

8.ISO standards by PARCO HSE

Familiarized with ISO9000, ISO14001 & ISO18001.

9.Work permit procedures by PARCO HSE

Authorized by PARCO safety department as work permit issuer.

10.Evacuation & first aid by PARCO HSE

Familiarized with evacuation equipments like SCBA, half face mask, safety harness.

11.Work at height by PARCO HSE

Carried out by PARCO safety department.

12.Firefighting system by PARCO HSE

Prevention, detection, fighting & suppression by utilizing Deluge valve systems, fire alarm system, fire extinguishers, fire/flame detectors, FM200 fire suppression system, familiarized with fire fighting equipments including fire tenders.

COMPUTER SKILLS

Autocad

ETAP

Dialux

SAP

MAXIMO

ORACLE

Microsoft Office(MS Word, MS Excel, MS PowerPoint)

Engineering Software: MATLAB

LANGUAGES

Read

Write

Speak

English

Excellent

Excellent

Excellent

Urdu

Excellent

Excellent

Excellent

REFERENCES

Shaukat Ali chaudhri Saifullah Khan

Manager Chief Engineer

Presson Descon International Pvt Ltd Pak Arab Refinery

acsmla@r.postjobfree.com acsmla@r.postjobfree.com

+92-321- 4062604 +92-300- 6865200



Contact this candidate