Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Special Capital Region of Jakarta, Indonesia
Posted:
November 26, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAILS

Full Name : Zahirul Fadli

Place / Date of Birth : Padang / July 7th, 1982

Gender / Marital Status : Male / Married

Religion : Moslem

Permanent Address : Jl. Mede No. 20 Rawamangun

East Jakarta - Indonesia

Phone Number : 081*-****-**** (mobile)

Email : acslxa@r.postjobfree.com / acslxa@r.postjobfree.com Nationality : Indonesian

EDUCATION HISTORY

2000 - 2007 : Department of Mechanical Engineering, National Institute of Technology Bandung (ITENAS)

1997 - 2000 : SMUN 2 Padang, West Sumatra

1994 - 1997 : SMPN 2 Padang, West Sumatra

1988 - 1994 : SD Adabiah I Padang, West Sumatra

WORK EXPERIENCES

PT TRIPATRA ENGINEERING

Period : September 19th 2013 – Present

Position Held : Piping Construction Engineer

Project Name : Project Management Service (PMS) PHE - ONWJ

Project : Pipeline Repair & Replacement Project – Topside Modification Team Period : April 1st 2015 – Present

Location : Jakarta

Position : Piping Construction Engineer

Job Description :

Check Piping Detail Drawing (in-house PHE ONWJ) based on FEED data and Pre-construction survey

Prepare Material Take Off for Piping Bulk Material, Manual Valve, Specialty Item, and Pipe Support

Prepare document for execution, such as Work Package, Hot Work Approval, Isolation Plan, L1RA and L2RA, and Lifting Plan

Manage man power loading, tools, equipment and consumable loading during execution

As Company Representative during installation/ construction, commisioning, and start-up (Introduce Hydrocarbon)

To coordination with Operation Team, and Engineering Team regarding technical issue

Project : GG New Development Project – OPF Balongan Period : April 1st 2014 – February 28th 2015

Location : Balongan, Indramayu

Position : Pipeline Onshore/ Mechanical/ Piping Field Engineer Job Description :

Acting as Area Authority (hand over phase from project to operation)

Monitoring conctruction activities for Onshore Pipeline, Mechanical and Piping

Monitoring Progress based on Schedule L-4 and L-5

Supervise and problem solving for any technical problems at site

Daily Reporting to Company Authorized Representatif (CAR)

Review and approval documents at site, for example Lifting Plan, Task Risk Analysis adn Site Quary

Interface meeting with another discipline due to SIMOP activities

Check material receiving from Fabrication

Review material balance for excess material

Line checker and Punch list

Pre-Commissioning monitoring

Assist Commissioning Phase

Project : Pipeline Repair & Replacement Project – Topside Modification Team Period : October 19th 2013 – March 31st 2014

Location : Jakarta

Position : Piping Construction Engineer

Job Description :

Check Piping Detail Drawing (in-house PHE ONWJ) based on FEED data and Pre-construction survey

Prepare Material Take Off for Piping Bulk Material, Manual Valve, Specialty Item, and Pipe Support

Prepare Material Request and Material Handling (Move Order (MO), Purchase Order (PO), Purchase Requisition (PR))

Prepare document for execution, such as Work Package, Hot Work Approval, Isolation Plan, L1RA and L2RA, and Lifting Plan

Guide and provide solutions to supervisor piping installation and field in case of any technical problem

To coordination with Operation Team, Engineering Team and Quality Control Team

Monitoring Fabrication

Pre-Construction Survey

Project : MRA Project

Period : September 19th 2013 – October 19th 2013

Location : Jakarta

Position : Piping Construction Engineer

Job Description :

Check Piping Detail Drawing (Isometric Drawing and Piping Plan Drawing)

Prepare Material Take Off for Piping Bulk Material, Manual Valve, Specialty Item, and Pipe Support

Prepare document for execution, such as Work Package, Hot Work Approval, Isolation Plan, L1RA and L2RA, and Lifting Plan

Guide and provide solutions to supervisor piping installation and field in case of any technical problem

To coordination with Operation Team, Engineering Team and Quality Control Team

Monitoring Fabrication

PT DEPRIWANGGA ENGINEERING

Period : December 5th 2011 – August 10th 2013

Position Held : Piping Engineer

Project Name : Pertamina Hulu Energy – Offshore North West Java Project : - Feed KILO Reactivation Phase II Project

- KLB Platform Modification Project

- Post FEED MRA Project

- MMF Booster Pump Modification

- PRRP Project

Period : November 22nd 2012 – August 10th 2013

Location : Jakarta

Position : Piping Engineer

Job Description :

Responsible to Lead Engineer for Preparing and Making of all Piping Technical Document

Prepare Piping Specification (Addendum)

Prepare Piping Data Sheet

Prepare Material Take Off for Valve, Piping Bulk Material, Specialty Items, and Pipe Support

Check Piping Drawing

Piping Stress Analysis Calculation (Caesar II 5.1)

Prepare Request for Quotation (RFQ) Piping Bulk Material

Site Survey

Project Name : BP Tangguh Engineering Blanket Service Period : February 21st 2012 – November 21st 2012

Location : Jakarta - Papua

Position : Piping Engineer

Job Description :

Responsible to Lead Engineer for Preparing and Making of Engineering Package

Coordinate with Field Engineer for Engineering Package and Another Issued

Prepare and Making Tie-In Procedure

Prepare Piping Data Sheet

Prepare Piping Material Take Off

Check Piping Drawing (Piping Plan and Isometric) Existing and New Route

Piping Stress Analysis Calculation (Caesar II 5.1)

Prepare Request for Quotation (RFQ) Piping Bulk Material

Site Survey

Project Name : Pertamina Hulu Energy – Offshore North West Java Feed UL Development Project

Period : December 5th 2011 – February 21st 2012

Location : Jakarta

Position : Piping Engineer

Job Description :

Responsible to Lead Engineer for Preparing and Making of all Piping Technical Document

Prepare Piping Specification (Addendum)

Prepare Piping Data Sheet

Prepare Material Take Off for Valve, Piping Bulk Material, Specialty Items, and Pipe Support

Check Piping Drawing

Piping Stress Analysis Calculation (Caesar II 5.1)

Prepare Request for Quotation (RFQ) Piping Bulk Material

Site Survey

PT KRAKATAU ENGINEERING

Period : April 12th, 2011 – November 30th 2011

Position Held : Piping Engineer

Project : Meratus Jaya Iron & Steel (MJIS) 2 x 14 MB WHRB Power Plant Location : Batu Licin, South Kalimantan, Indonesia Job Description :

Responsible to Lead Engineer for Preparing and Making of all Piping Technical Document

Prepare and check data sheet, calculation, basic and specification design, PFD, PI&D, Plot Plan and Layout piping plan before issue to construction management for construction approval

Take Engineering Decision for Urgent Construction on Site

Review Engineering Drawing

Issued for Piping Isometric Drawing

Piping Material Take off

Prepare Engineering Requisition

Check Quotation from Vendor (engineering Scope)

Prepare Bill of Quantity for Piping Work, Pipe Support and Insulation Work

Prepare Delivery Material and Check Material on Site

Meeting about outstanding engineering and construction progress with construction management, owner and sub contractor

Prepare Specification and Procedure Document

PT INWHA INDONESIA

Period : Dec 6th, 2009 – March 15th, 2011

Position Held : Piping Engineer

Project Name : Jambi Merang Development Gas Production Facilities Location : Sungai Kenawang

Position : Piping Engineer & Project Control Assistant Job Description :

o As Piping engineer :

To make spool drawing

To check isometric drawing and spool drawing

To calculate bill of quantity of Dia-Inch and weight of pipe

To calculate weight of pipe support

Preparing test package

Line checker

To check punch list and punch kill

As built drawing

Monitoring test package status

Monitoring piping construction progress report

Material Final Check and Final Settlement

o As Project control assistant

To check schedule

Update progress piping works, support works and sand blasting / painting works (daily, weekly and monthly)

Coordination with engineer, quality control and construction section

Prepare Minute Of Meeting (MOM) for weekly meeting PT Mitsubishi Heavy Industry Jakarta

Period : April 2008 – April 2009

Position Held : Piping Field Engineer

Project Name : Muara Karang Gas Power Plant Project Job Description :

Re-Routing and Layout Existing Drawing Check

PFD and P&ID Check

Layout Detail Drawing Check

Isometric Drawing and Material Take Off Check

Survey Data Actual for Existing Condition (Piping, Mechanical, Electrical and Civil Work)

Preparing Drawing for Construction

Preparing Flushing & Blowing Procedure

Monitoring for Test Pressure

Line Checker and Punch List

PT Yasa Industri Nusantara Jakarta

Period : November 2007 – February 2008

Position Held : Piping Designer

Project Name : Development Train 1 & 2 Tangguh BP LNG Project in the Berau- Bintuni Bay region of Papua, Indonesia.

Job Description :

Revision Drawing (As Built and Field Change Sheets Drawing)

Preparation Test Package (Hydro test, Pneumatic test, Service test and Visual test)

Line Checker

Punch List (Construction of Piping)

Field Engineering (Problem solving construction of piping) TRAINING/COURSES

Piping Designer (382 hours), organized by Center for Material and Technical Product

(B4T) Bandung in cooperation with PT. Rekayasa Cakrawala Resources Subsidiary of PT. Rekayasa Industri. Certificate No. : 0807.3.40.040

Piping Stress Analysis Course (24 hours), organized by ApGreid Oil & Gas Design Course Jakarta, Indonesia.

Human Safety Environment (H.S.E), 40 Hours. Organized by KYPJO LNG Tangguh Project.

Group Discuss about Piping/Pipeline Reliability, organized by Mechanical Engineering Department at National Institute of Technology.

Basic Sea Survival Training organized by PT. Depriwangga Engineering and Barcoindo at KKO pool, Jakarta.

Control of Work Performing Authority (Non Process) (CoW PA) Training by PHE ONWJ at PHE Tower, Jakarta.

Confined Space Entry Training by PHE ONWJ (3rd party Solusi Training Solusindo

(STS))

Control of Work Area Authority (Non Process) (CoW AA) Training by PHE ONWJ at PHE Tower, Jakarta.

Basic Rigging Training by PHE ONWJ (by 3rd party Solusi Training Solusindo (STS)) ORGANIZATION EXPERIENCES

Chief of Coordinator at CNC Laboratory Mechanical Engineering Department, National Institute of Technology (ITENAS) (2005 - 2006)

Member of Himpunan Mahasiswa Mesin (HMM) ITENAS (2000 - Present)

Member of Unit Apresiasi Budaya Minang (UABM) ITENAS (2000 - Present)

Vice of Ikatan Alumni SMU 2 Padang In Bandung Region (2003 - 2004)

Vice of Unit Apresiasi Budaya Minang (UABM) ITENAS (2001-2003)

Coordinator of Public Relation In Pagelaran Budaya Minang “Paragiahan Denai”

(2001)

Member of Diklat Maba HMM ITENAS Security Division (2001 and 2002) TECHNICAL SKILLS

Computer : Microsoft Office (Word, Excel, PowerPoint, Visio), AutoCAD 2D and 3D, Caesar II Code (Engineering Software), Vantage 3D Review

Language : Indonesia, English (active)

HOBBIES

Reading, Sporting, Traveling, Automotive and Rafting REFERENCE

Dibyo Setianto (Project Manager at PT. Depriwangga Engineering)

Doddy Widyantoro (Engineering Manager at BP Tangguh)

Tegoeh Marhaendratno (Construction Lead at PHE ONWJ) SELF DESCRIPTION

I am kind of outgoing, and motivated person, able to work in a team and willing to learn. My pleasant and creative personality also makes me confidence to apply this position in your company.

I can learn and develop my ability in your company. My career objectives are to obtain a career as professional at my position through the use of my communication and educational skills.

I declare the details stated to be true and complete ZAHIRUL FADLI, ST



Contact this candidate