Post Applied –General Manager –Civil &MEP services

I am truly a single point total solution provider for project

M.V Natarajan (Alias: Suri. M. V)

General Manager – High Rise building -MEP Services

Sion Mumbai (E) Maharashtra India -400022

Mobile no-989-***-****, 900-***-****, Email: acry4i@r.postjobfree.com, acry4i@r.postjobfree.com

Career Objectives:

Highly motivated and experienced manager with strong leadership skills and to utilize my skill set as a senior manager in a reputed organization and use my extensive experience to bring in positive results from the project’s and become a valuable company asset.

Career Summary:

25 yrs.’ experience from engineer to MEP General Manager working on different projects from a technical institute in India to a company in the UAE. I have extensive experience in managing Mechanical and Electrical projects from inception to completion. Worked on projects in various disciplines for the past years with reputable companies with experience in MEP system with, HVAC, Electrical, plumbing, firefighting, FA.PA system ELV system. Well acquainted with Government Authority of India & U.A.E towards document and material approval from DEWA / ADDC/BEST power & water, ADSSC for drainage, Civil defence for Fire alarm & fire fighting and LPG, Municipality for project completion certificate and Etisalat for telephone & services network, HVAC: Chiller Installed up to 2000 ton VRF, FCU AHU, Fresh Air, Exhaust System, Toilet Extract system, Stair case pressured system, lift room pressure system, cooling tower, Heat recovery. Designing issue:- 1. Cross check size of pipe /duct, 2. Cross check air & water balancing, 3. Extreme condition maximum load & high ambient temperature peak load – equipment to be selected. Note-High rise building – chiller were used in common area. VRF are used in the Apartment with water cooled one by cooling tower system – 55% power will saved. ELECTRICAL: HV- Incoming, L.V Distribution, P & D transformer, Bus bar – Trunking, maximum demand control, back up powers UPS, Generator sets with acoustic lighting external /internal,Earthing/ lightning protection, laisioning approval, commissioning & asset management – Note-calculation of sizing, bus bar, earthing, cabling, lighting protection, illumination, D.G set, battery & battery charging, co-ordination layout drawing for power control with schematic, design & engineering of LV/HV Electrical distribution system. Interfacing management with other services building services. FIRE FIGHTING: Fire plant room & fire Equipment’s, fire alarm and sprinkler & hydrant system & fire escape system. GARBAGE CHUTE: transporting garbage, store location & disposal - safety/hygienic to be considered. ELV SYSTEM: MATV, CCTV, P.A, fire alarm, system, structural cabling system – design and preparation layout data, voice, network barrier, AMF panel, lighting systems, security systems, water pump, firefighting panel & pumps, HVAC system are to be inter connected through BMS.

PHE: Fountain, Reflection pool, Swimming pool & Filtration Plant -Water and waste water - R.O. plants, Desalination plants, Sewage Treatment plants & ETP, Hot water system ( boiler/ solar,/heat recovery coil system), water pump – designed & Installation with booster pump system & gravity system with water hammering, OHT, UGT & flow system & installation with PRV, loft tank, bath tub, sinks, shower, hot & cold mixer, Drainage air vent, nanny trap ), Storm Water, Rain Harvesting, landscape systems, High rise building – plumbing shaft method of installation,noise proof, access for free maintenance, toilet & bath room & balcony area- water proofing. VERTICAL TRANSPORT SYSTEM: - elevators, conveyors and carousels, elevators, E.O.T crane, EQUIPMENT; kitchen, weighing machines, special types of doors etc. boilers, laundry system, vehicle scanner, boom barrier

CONSTRUCTION INDUSTRIES EQUIPMENT’S : tower crane batching plant trucks, vibrator, jcb, road roller, temporary power supply for construction ( D.G SETS), car,concrete pumps, mixers, jack hammer etc., maintenance & servicing, TOOL ROOM INDUSTRIES – Injection moldings, compression moldings, sheet metal, press shop-1000 ton press hydraulic, pneumatic & CNC control press Godrej,tool room machinery, quality control equipment’s, sparking machine, wire cutter, welding machine forge, heat treatment, gas welding, D.G set up to 1000kVA, air compressor up to 3000 TC, Pellet truck, battery driven high reach truck, dock level, shearing machine, CNC tool room machines – electrical, mechanical, electronic – maintenance & service, repair.

Professional Summary:

Close to 25 years of Experience in MEP Planning, Coordination, Designing, Execution and commissioning & with comprehensive knowledge in International codes and standards like NFPA, International Building Code, UPC, ASHRE and NBC with adequate knowledge in ECBC norms Exposure in handling and executing projects in various verticals covering Commercial buildings, Hotels, Facilities and Residential complexes in multi-cultural environment

Personal Profile:

I am an Engineering professional with 25 year’s experience in contract management, POMEC and Engineering mainly gained from working within the construction industries in the UAE and India. My areas include practical and administration experience in MEP Engineering / FM / POMEC / Hotel Industries / Industrial Engineering / Building Services on projects such as High Rise buildings, high profile residential and commercial developments.

Professional skill:

Leadership skill

Coaching skills.

Process analysis skills.

Strategy development.

Proprietary methodologies

Co-ordination is the unification, integration, synchronization of the effort of group members so as to provide unit of action in the pursuit of common goal, planning, organizing, staffing, directing, controlling.

Outstanding troubleshooting and Diagnostic skills.

Prove ability to lead people and get results through others.

Ability to manage multiple tasks and priorities.

Proficient with, AutoCAD, CMMS and MS Project Primavera.,TPM, EMS, BaaN,ERP

Project management.

Project coordination

Execution & Billing

planning ( schedule & planning )

Quality/ASHRAE -62.1

Sub-contractor management

Engineering & procurement

Client management

Tender & Budget

Managing the consultant

Client co-ordination

Build project from concept to commissioning

Commercial

Rate Finalization

Monitoring

Time Management

Technical issue

Erection & commissioning

Design

Business development

Contract management

Risk management

Comprehensive building solution included design & engineering

Communication skills

Cost management

Laisioning

Educational Qualification:

Associated Degree- N.T.T.F Electrical maintenance Engineering

N.T.T.F Technical Training institute – India - Web site –WWW.nttftrg.com, Phone - 009***********

Integrated Facilities management -certificated in Haden International India ltd

CUMMINS Engine – Trained as service engineer from Ajax Bangalore India

Significant Highlights/Trainings and memberships:

Approved by ADDC as MEP Manager.

Active Member of American Society of Mechanical Engineers (ASME) Undergoing Seminars

IT/ Software Skills:

MS Office 2007, MS Project 2007,AutoCAD, primavera, Fidelio

Personal Information:

Date of Birth- 21st July 1969

Nationality-Indian

Marital Status-Married

Driving License-Valid India

Language Know-English, Tamil,Telugu,Malayalam, Hindi, Kannada, & Marathi

Main Responsibilities:

Demonstrate & use of Expert know how the entire MEP part of construction projects in all its aspects such as : design, function, installations, Functionality & coordination with other facility provider /project manager as per clients wishes .

Coordinate the MEP design and execution between architecture /structure /design office and contractors/subcontractors

Provide the planning input for the MEP works and Monitor Planning vs. Progress on site

Document project progress and/or delays through letters which can be used as contractual aids during disputes. Lead and control the document flows

Able to review resource reports like (manpower histograms, plant and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the project

To review and certify the monthly invoicing of the contractors/subcontractors.

Audit the performance of MEP subcontractors.

Implement/follow proper QA/QC procedures by maintaining and following Project QA/QC Manual.

Lead technical coordination meetings with subcontractors and project staff.

To provide technical input for offer requests and the awarding of MEP subcontractors to the contracts, procurement department.

Be adaptive in and aware of International and Local Building Codes of all MEP Systems

Have hands on experience on the procurement, installation and testing & commissioning of all MEP Systems

Lead and mentor a team of Mechanical and Electrical Managers on Site

Oversee and enforce the implementation of HSE by MEP Contractors

Able to perform all post tender activities of construction until the handing over and completion of the defects liability period of the project

To ensure compliance of construction activity to best industry standards, international codes, planned timelines, allotted budget, company strategy and goals.

Strong knowledge of scheduling/planning and tracking of progress

Strong interpersonal skills

Strong verbal and writing skills, with regards to contractual communication

Knowledge of risk assessment and contingency planning

Awareness/ Exposure on various Construction/System methodologies

Ability to manage multiple project site

Problem solving skills

People management skills

Major Project India & U.A.E- Total 25years Experience

Presently working

Miran international hotel – Project General Manager – 5th June 2015 ( Tashkent Uzbekistan ) Russia www.miran hotel.com…

India Experience –(North India ) MUMBAI

Omkar Realtors & Developer Pvt ltd – South Mumbai- India - General Manager – MEP SERVICES- Handling 9 projects - Report to EPC Head. Mr John Guest - India Project - 1 Year 8 Month – Dec 12th 2013 Till 31st July 2015

Client: Omkar Realtors & Developer pvt. ltd

Architecture – Foster +Partner

Consultant : Buro Happold

Main Contractor : L& T

ESPA – SPA Design

DHA- Lighting Design

LDA -Land Scape Design

HBA- Hirsch Bedher Associates – Hospitality Interior Design

Barkley – Pet Care design

MEP Contractor : Not Finalised

Commencement Date : August 2006

Area – 10 Million SQ FT

Height – 300 metres tower-A – 78 floor, Tower-B -77 Floor, Tower-C -63 Floor

Web Site- Http://Omkar1973.Com

MEP Team Members :- 19 person+ secretary =Total 20 no’s

Site team -6 supervisor, 1- MEP co-ordinator, 3 -MEP manager’s, 1 Assistant MEP manager, 1-Site electrician.

Office team – Design team -1-HVAC, 1-Electrical & ELV, 1- Plumbing & Fire Fighting, 3-MEP Draft man, 1-tendering & budget, 1- procurement & work order=20 people.

MEP Design to freezed for Worli project it took me Around 1 year & 7 Months:

HVAC – Apartments VRV Were Used And Saved 50 % - Instead Of Chiller Water System Units

Electrical Bus Bar We Used ALU & Cu Connector Saved Around 50%,

Plumbing As Per Design- Pressure Pump Converted Into Gravity System

Firefighting As Per CFO Norms

Substation Location With Best HV Supply Common Area, Lv Supply To Flats – Completed It Saved Around – 13 %

STP 680 KLD is used for Cooling Tower Purposes It Will Cool the VRV out Door Unit.

Boiler,

Heat Exchanger,

Safety & Security System- Design freezed

Facilities Management – Services Design freezed

Swimming Pool, Foundation, Water Curtain, Design Freezed

Lightning Arrestor Freezed

Shaft Plumbing Raiser Mock Up Completed –Consultant Approved Material Were Changed - We Saved Around 26 %

Electrical Raiser Cable / Wire –In Shaft/ Apartment Freezed –In Material Saved Around 32 %

Apartment Consultant Design – 2 Electrical DB. We Changed Into 1 Electrical DB- Saved Around -6 %

Lift – 66 Were Freezed ( Landing location as per traffic, Safety & Guest Comfort -Designed Were Freezed With Schindler )

Garbage Chute Fire Safety / Hygienic Purposes Washing with Chemical Dosing– Shifting Material & Location and Storing the Dry & Wet Garbage and Segregating the Waste & Transporting them.

Final Design Worli Tower Only 2 Staircases For Tower-A – Construction Were Completed Up To 47 Floors. At The Time Of Approval CFO Required 4 Staircases. (Staircase Pressurised System Were Re-Designed Work Completed)

Mechanical floor – plumbing water supply ring circuit it was in the apartment – shifted to mechanical floor

For Tower A, Tender Were Floated In The Market-B3 TO P-13 Level.

Lobby Design Freezed - MEP Contractor Were Appointed Work Under Progress,

Apartment –Mock design freezed – work under progress

Rehab building

Apart from this I was handling 8 rehab buildings, constructions were on going in that- MEP design & installation done for a 4 projects & handed over properties.

Rehab building

Worli Maha Lakshmi – 7 tower

Kaprideo – 3 tower handed over

Praghati – 3 towers were handed over

Memon Chawl – 1 building were handed over

All building were handed over with O.C

Sale building

Memon chawl- Up to 27 floor completed, handed over with OC to the properties.

Vayu( projects -design were completed, tender closed/ appointed contractor work under progress)

Veda – 1 tower up to 27 floor completed, handed over with OC to the properties.

Ganeshwadi ( projects -design were completed tender closed/ appointed contractor work under progress)

Kurla jai kalayan (projects -design were completed tender closed/ appointed contractor work under progress)

U.A.E Experience:- 9 Years-

Project-1

Al-Futtaim Carillion LLC

JV- Hastie International LTD

Project – Abu Dhabi

Project Name – Cleveland Clinic

Designation – Deputy Project Manager

Area – 17,18,19 floor

Main contractor – Samsung C & T company join venture partner six constructions.

Developer- Mubadala - joint venture- MEP –AECOM Patient tower

Architecture –HDR Inc. USA

Past 2 years ETA hasn’t been able to get approval from Consultant/ Cleveland team. MEP work carried with proper MEP co-ordination with all services within 15 days and got approval from consultant & Mubadala – (Al-Futtaim Carillion LLC MEP engineering team) - for patient room, guest room, corridor & stair case. We finished project -3 floors in 7 months with commissioning and handed over the client to MUBADALA, 1600 technician’s, 15 supervisors, 3 engineers, 1 deputy project manager & project manager.

Project value – 68,656,000/-AED

Project-2

Down town Dubai development plot no -55-56-57

29 Boulevard offers a stylish residential address in Downtown Dubai.

Designed by Frank Williams & Partners Architects,

Civil contractor – Al-Futtaim Carillion LLC

MEP Contractor – Hastie International ltd LLC

Client: Emaar properties PJSC

Client’s engineer: Bruce Henderson Naseer Saeed Partnership (BHNSP)

Contract name: Burj Dubai Developments.

Designation – Mep Construction Manager

Project handed over -23rd November 2010

Project cost -44,400,000 AED

The loft project involves the construction of 3 high rise residential buildings, two of 42 floors and one of 38 floors. These are connected by a podium/basement structure of 9 floors. This structure has three basement levels of car parking, a ground floor containing retails units, a further level of parking, and four floors of apartments.

The overall floor area is measurement 155000 metre square and the total number of apartments is 670. Other amenities included canteen, wash rooms, squash courts, lounges, business center, children’s play areas, mini theatre, library, games rooms, gym and steam room.

The building envelopes is a mix of precast concrete panels and curtain wall at lower level stone cladding will be provided . The internal finishes are generally to a high specification and building services are normally found in similar residential developments.

District Cooling- HVAC, Water hammer were used. Hot & cold water – PPR Issued, drainage- HDPE pipe, kitchen extract duct connected to portable kitchen smoke extract

(Work As Mep Construction Manager in Hastie international LLC - Joint venture -with al-Futtaim Carillion LLC- building service manager. Hastie company closed due to crisis in Dubai 2011 and was promoted as deputy Project Manager for Cleveland clinic)

Khalidiya Palace Rayhaan by Rotana Hotel & Residences – complete project handled and handed over to Rotana client

Project-3

Client : Pvt. Dept. of H.E. Sheikh Mohammed Bin Khalid Al Nahyan

Project Manager: M/s E.C. Harris International Limited

Consultant: M/s Khatib & Alami Consolidated Engineering Co.

Designation- MEP Project Co-ordinator

Main Contractor: M/s Nurol General Contracting LLC

MEP Contractor: M/s Emirates Technical Associates (ETA), Abu Dhabi

Started Date: August 2006

Completion Date: September 2010

The project involves construction of 4 high rise towers in 4 Blocks: Block A will house the Khalidiya Palace Rotana Hotel comprising a ground floor, a mezzanine level, a technical floor and 18 additional floors offering 400 single bedroom units and 43 suites. Block B and C will each house a residential tower comprising a ground floor, a mezzanine floor and 19 additional floors offering 10 flats on each floor of which 5 flats will be duplexes. Block D will house a residential tower comprising a ground floor, a mezzanine floor and 19 additional floors offering 8 flats on each floor. Amenities in the project include: squash courts, 2 tennis courts, a spa, a gym, swimming pools and a children’s play area. Facilities in the project include: 24 hours safety and security, 36 office spaces, 2 well branded shops, business facilities as well as an underground car parking area of 30,000 square meters. Cost 210,000,000 US$,

ETA- M&E has provided Mechanical & Electrical services for the entire complex including leisure facilities such as white sanded beach, swimming pools, state of the art fitness centre and spa and extensive water sport activities, along with all-day restaurants and ballroom

Chillers Bay

Chilled Water Pumps

Air Conditioning Work

6,500 TR Air Cooled Screw Chillers

41 Nos. FAHUs/AHUs

2177 Nos. Fan Coil Units

43 Nos. Chilled Water Pumps

40 KM Chilled Water Piping

125,000 Sq. Mtrs. of Ducting

Fire-rated ducts for sensitive areas

77 Nos. Exhaust Fans

17000 Nos. BMS Points

Stair case pressure system

Parking ventilation system

Fire door –entry safety – theft issue

Fire damper

Electrical & ELV System

22 Nos 11 kV/400 V Dry Type Transformer

3000 Meters of Bus bar Installations

4 Nos. standby Generator (15,364 kw)

3 Kilometres of HV Cables

5 Nos. 11 kV Switchgear

19 Nos. MDB

149 Nos. SMDB and 1080 Nos. DB

11 Kilometres of XLPE Cables

42000 Nos. Switches & Sockets

4500 Nos. Fire Detecting Device

1165 Nos. Voice Evacuation Point

49,000 Nos Light Fittings

48 Nos. Central Battery Panel

46 Nos. Lighting Control Panel

11 Nos. Fire Alarm Panel

Solar light

LV ROOM

HV ROOM

Parking -occupancy sensor

Plumbing & Fire Fighting System

48 Kilometre Water Supply Pipes

25 Kilometre Hot Water Supply Pipes

31 kilometres Fire Fighting Pipes

1117 Nos. Water Heaters

25 Sets Water Pumps

3 Nos. Fire Pumps

7000 Nos. Sprinklers

Specialised Equipment’s

3 Nos. Steam Boilers

6 Nos. Clarifiers

2 Nos Water Filtration System

2 Nos. Water Softener System

Swimming Pool & Water Fountain

System

Room, carpets

Interior/balcony grill

Marble

Wall paper

Furniture

Door lock

Staff room

Hk room

Pomec department

Camera

Laundry chute

Corridor music system

Tv/telephone system/ epbax, Xerox,internet wi-fi, balcony drainage system,

Basement drainage system

Centralized LPG System

Gymnasium

Spa & equipment’s

Fountain

Kitchen equipment’s

Laundry

Restaurant

Night club/ lighting /music system

Pet care

Ro plant

Stp plant

Parking system

Safety & security system

Lighting-internal/ external

Music system

Store room

Canteen

Fire wall/fire ceilent

Mechanical floor – 3nos

Garbage room

Bar equipment’s

Mood light

Fedilo hotel soft ware

Revolving door

Lifts

Cold rooms

Project-4

Main Contractor – Target

Consultant – Ramboll

Mep Contractor – Sensaire Service - 2 Towers ( HVAC & PLUMBLING )included Site Co-Ordination

Project Handed Over

Designation- FM – Mep Services

Ramee royal hotels is a four star deluxe property. The hotel offers 102 elegantly furnished rooms (96 standard and executive rooms and 6 suites) new unfinished hotel was renovated as a 4 star hotel- Dubai- B1+B2+G+4+R

I had joined as MEP maintenance manager for Ramee group of hotels.

Apart from this I use to handle 8 hotels on POMEC issue.

*Regent Palace Hotel, *Regal Hotel, *Ramee international,*Ramee Royal, *Ramee Guest line- 2 ( quality inn ), *Ramee Guest line-3,( Binsalone plaza), *Ramee Apartment, *Ramee guest line apartment-1, *Ramee Beach Resort, *Ramee Cruises-1 & 2 *Mr.Clean laundry, *Ramee PIZZA,* 2 & 3 Ramee guest line hotel( old hotel )was purchased from Ramee project management – renovation was carried out & it was handed over to hotel management

Haifa technical service –Dubai

Worked as –Facilities manager- CIVIL & MEP SERVICES

Construction & MEP company

Project detail given below

WWW.haifagroup.com

Consultant M/S. Eng. Adnan Saffarini

Main Contractor M/S. Al Nuaimi Group

Mep Contractor M/S. Haifa Technical Services

Building: G + M Office, Warehouse And G + 3 Parking Building (8lvl) For Emirates Arabian Adventure Operation Center At D.I.P.

RAK MALL, Shopping Center( G + 1st + 2nd ) on Plot No. 13303 in Al Quirm Area, Ras Al Khaimah

CLIENT M/S.Emirates Airlines

CONSULTANT M/S.Design Concepts

MAIN CONTRACTOR M/S.High Star Contracting

MEP CONTRACTOR M/S.Haifa Technical Services LLC.

Building- 2B+G+M+8+TYP BUILDING AIRPORT ROAD-DEIRA

Client Mr. Dhai Khalfan Dhahi Bin Tamim

Consultant Eng.Adnan Saffarini

Main Contractor Buset Contracting & Gen. Transport Co.

Work Electro Mechanical Services

Scope of Work: Air-conditioning: Supply & Installation of ducted split of 560 nominal tones capacity. Supply and installation of ventilation system, Copper pipes with insulation & finish. G.I. Duct work incl. supports & Hangers.

Electrical:: Load Connected 2 x 1000 KVA Transformers Total connected 1572.57 kW .Main LV Panels supplies 701.67 kW & 870.9 kW.

Plumbing: Drainage & Water supply line with water tank 2 Nos of 7000 gallons. Drainage & Water supply line with water tank 2 Nos of 7150 gallons and Fire Fighting.

Building 2B+G+M+8+GYM COMM BUILDING (GARHOUD)

Client Mr. Rashid Bin Thani Bin Khalaf Aal Thani

Consultant M/S. Eng. Adnan Saffarini

Main Contractor Ginco Contracting Est

Work Air-Conditioning

Scope Of Work: Air-Conditioning: Supply & Installation Of Ducted Split Of 390 Nom. Tones Capacity. Copper Pipes With Insulation & Finish. G.I. Duct Work Incl. Supports & Hangers.

Building B+G+13 Res.Building Tower (Internet City)

Client Mr.Tayyab Mohammad Ibrahim

Consultant Al Ajmi

Main Contractor Al Badr Contracting Co. Llc

Work M E P

Scope of Work: Air-conditioning: Supply & Installation of ducted split of 700 nominal tones capacity. Copper pipes with insulation & finish. G.I. Duct work incl. supports & Hangers.

Electrical: Load Connected 2 x 1500 KVA Transformers Total connected 2679 kW .Main LV Panels supplies 1301 kW & 1376 kW

Plumbing: Drainage & Water supply line with water tank 2 Nos of 7000 gallons

Building 2B+G+8 BUILDING (AL BARSHA)

CLIENT MR. ZAID BIN MESFER BIN ZAID AL WAAAYAN

CONSULTANT H A D I

MAIN CONTRACTOR GOLDLINE CONTRACTING LLC

WORK AIR-CONDITIONING

Scope Of Work: Air-Conditioning: Supply & Installation Of Ducted Split Of 318 Nominal Tones Capacity. Copper Pipes With Insulation & Finish. G.I. Duct Work Incl. Supports & Hangers.

As Construction Facilities managers I have to wear many hats-duties calculating cost estimates, budgets and schedules; selecting appropriate construction methods for

the job and budget; explaining contracts and technical information to employees; supervising construction personnel and activities onsite; developing work-around for

Delays and other problems; and hiring and training workers and subcontractors, as well as making sure the project meets all building and safety codes. Also spend a

Good deal of time interacting with clients and other building professionals, especially in the early phases of a project. In addition to the time spent in the initial

negotiations for the project, they have to give clients regular progress updates and submit budget reports & collaborating with architects, engineers, inspectors and

Other building specialists. Supporting and assisting the Exec General Manager (EGM) for the Civil Construction Sector, including:

Provide information to management for the purpose of decision making

Prepare FM presentations on construction project

Arrange staff events on behalf of FM, including but not limited to: Leadership Meetings, Wider Leadership Meetings and Full Team Briefings

Arrange field visibility opportunities for FM

Assist the FM with his corporate connection and flow of information

Assist FM to meet CEO requirements and requests

HR administration of FM direct reports, including but not limited to meeting preparation and records for 1:1s, Performance reviews and on track discussions

Reporting writing and compilation, including but not limited to SMT monthly report and Board reports

To manage the action registers with accurate and up-to-date information

To assist in the writing of business plan/strategy documents as required

To maintain the Civil Construction risk register

To work with the FM to undertake project based work as required

To assist the FM as required with monthly reporting requirements including compilation

Maintain management processes, systems and folders on behalf of FM

Assist the FM to ensure we meet internal and audit criteria

Actively identify systems and process within the Civil Construction Division that conflict or do not align to Corporate requirements

Ensure all FM internal communication reflects Haifa /sensaire services values and strategic goals of growth, innovation/efficiency and excellence

To work with other Civil Construction support functions (namely human resources and health and safety) to raise levels of internal communication and staff engagement

Working with the HR Manager, take the temperature of internal communication from time to time to gauge satisfaction levels and maintain the high-level Staff Engagement Plan

Draft and distribute key FM communication tools, such as FM Newsletter, HSQE Newsletter, and text messages on a regular basis

Take an overview of Civil Construction stakeholder communications to ensure they are concise, consistent and relevant.

Lead the Communication team ensuring quality output and high levels of internal customer satisfaction (two direct reports)

Motivate and manage the team to ensure high levels of team engagement

Generate staff development plans, provide regular performance feedback and conduct appraisals.

Conduct recruitment activity as required

Assist with staff events which aim to raise the level of satisfaction and engagement within the division

Review new contracts for communications requirements and opportunities.

Ensure clients’ expectations are understood and met or exceeded by the Project Managers

India Experience-15 Years (South India)

Royal Orchid Central Park Hotel Bangalore India – joined as Assistant Chief engineer promoted to Chief Engineer- Aug 15th 2005

Hilton Group -Golden Palm Hotel & Resort & Spa -Bangalore Assistant Chief Engineer March 5th 2003

Haden International Group India Ltd – IFM system - Maintenance Engineer- Ford Car Company/Vinoram April 4TH 2001

M-far construction –Hotel Le-Meridian Project Plant Engineer Cochin- Kerala –India- Bangalore July 19TH 1999

Data links-Maintenance Engineer -ELV system – (Palm Grove, Ashoka, Bala Residency, St Mark, Museum Inn) June 18th 1996

N.T.T.F Production Centre India – Bangalore – (Industrial engineering) Technician -2, Supervisor,Engineer May 2ND 1988

Present Salary - Rs 46 Lakhs P.A. +Yearly flight ticket +free accommodation

References

Mr. .John Guest – EPC HEAD – Omkar Realtors & Developer Pvt ltd- mobile no 077********

Mr M.K. Rama Krishnan – Project head – mobile 098******** acry4i@r.postjobfree.com