Post Job Free

Resume

Sign in

Project Manager Maintenance

Location:
Friendswood, TX
Posted:
October 05, 2015

Contact this candidate

Resume:

Education

J. Frank Dobie H.S.

Texas A&I University

BS Management

(In Progress)

Training

OSHA 500 Training Health & Safety

HAZWOP

Auto Cad

Drafting and Development

NFPA72 /101

NEC

Electrical

Instrumentation

ANSI

ISO9001

Fire and Safety Electronics 101

BICSI Certification

PMP Certification

National Institute of Certified Engineered Training

LEAN Certification

TWIC

Total Years of Experience

28

06/2014 - 06/2015

ISC Constructors, L.L.C. (87M-115M)

Sr. Commercial Construction/Project Controls Manager

Contract Mediation/Negotiation, Marketing, Commercial and Project Site Productivity, Cost Estimation, Earned Value Planning and Scheduling, Cost Analysis for Financials and Data Analysis’s, Identifying Trends and Variances to Prepare Project Reports and Forecasts. RFI’s and Change in Work Preparation Negotiations and Acceptance, Implement Progress and Performance Measurement and Presentation of Estimates, Schedules and Progress Reports. Provide Input and Support the Development of the Project Execution Plans. Analyze Critical Float Paths, Microsoft Projects, SAP, View Point, J.D. Edwards Cost Accounting and Quick Plans, Field Applications / Civil 34.5Kv and Instrumentation Underground Design of Duct Bank Preparation and Installation for ERP/EPC New Construction.

04/2012 – 06/2014

TURNER INDUSTRIES GROUP, L.L.C. (Western Division)

Project Controls Manager Western Region(Turnaround, Capital and Construction)

Pasadena, Texas Office (50K – 1.2B)

Support Clients and Personnel by Supervising Cost Estimates, Marketing, Plans and Schedules. Perform Cost Analysis of pending and existing Projects while Analyzing Data and Earned Value, Identifying Trends and Variances to Prepare Project Reports and Forecasts. Implement Progress and Performance Measurement and Presentation of Estimates, Schedules and Progress Reports. Provide Input and Support the Development of the Project Execution Plans. Analyze Critical Float Paths, Develop Schedules utilizing Oracle Primavera P-6 v.7, Microsoft Projects, Win PCS, SAP, J.D. Edwards Cost Accounting and Quick Plans. Manage Mentor, and Influence Project Controls Personnel within the State of Texas and Western Region.

10/2011 – 07/2012 KBR @ Skikda, Algeria (North Africa)

Sr. Technical Services (Construction)(250M – 1.8B)

New LNG Train(Fractionation)

Project Controls (P6, IPMS, CWP/FIWP)

Reliability, Progress Measurement

Earned Value Cost Tracking

QA/QC Auditing

LTCS/CS/SS/TITANIUM

Workface Planning and Scheduling (Civil, Structural Steel, Electrical, Carpentry, Fitters, Welders, Boiler Makers)

Heat Exchangers, Chillers, Pumps, Flare Stacks, Electrical & Instrumentation Controls, Water Treatment and Purification

08/2010 – 10/2011 KBR @ ExxonMobil Houston, TX

Facilities Operations/Maintenance Manager - Operations and Maintenance ExxonMobil Facilities, Scheduling and Planning (Primavera 3 & 6, Microsoft Project & Excel, SAP), Manage and Coordinate T/A & Maintenance within and around the Facilities(i.e...Plumbing, Electrical, HVAC, Carpentry, Preventative Maintenance on Fire Alarm and Life Safety, Security, Boilers, Heat Exchangers, Chillers, Pumps, Emergency Generators, Electrical & Instrumentation Controls, Water Treatment and Purification, Environmental Waste, Estimating (20K – 350M)

Manage/Coordinate Capital, Lump Sum and T&M Projects, Hire Contractors, Subcontractors and Vendors for additional Maintenance. Conduct weekly, bi-weekly and monthly progress reports on financials for all Facilities with overview on budget costs, savings and profitability. Systems Turnover and Finalization.

OSHA 500 Safety Auditing.

05/2009 - 07/2010 NetVersant Houston, TX

Operations/Project Manager - Design, Estimating, Planning/Scheduling (Microsoft Project, Oracle Primavera, Access, SAP, Excel, ) Oracle Cost Analysis( equipment, material, and manpower loading) Financials

Communication, Organization and Development with Owners, Contractors, Sub-Contractors, Vendors, Company Management and Superintendents

Service Management and Deployment (20k to 12m)

Account Executive, Inventory, Material and Equipment Management

Quality Assurance & Control, Safety and Inspection Training(Civil/Mechanical-Green Field/Brown Field)

Systems Turnover Surveillance/Intrusion/Access Control Security Systems

01/2009 – 05/2009 Texas Terminals Houston, TX

Safety Manager

Maintenance Groups/Technicians Training

Safety Inspections/construction sites

Risk Assessment and Reviews: Fire/Security/Safety

Accident Inquiries/Root Cause Study - Abatement

Incident/Accident Reports

OSHA Record Preservation

Budget/Financials Management

Fire Control System Maintenance/Testing

Installation/Preservation of Surveillance/Security Systems

03/2007 – 01/2009 Koetter Fire Protection LLC Houston, TX

Sr. Project Manager

Design, Estimation, Marketing, Planning/Scheduling (P3, Microsoft Project, Excel)

Financials (100k-15m), Equipment, Material and Manpower Loading

Communication and Organization with (Owners, Contractors, Sub-Contractors,

Risk Management/Project Controls

Chemical Plant (Refining, LNG/Fractionation) T/A & Maintenance

Operations/Maintenance (Civil/Mechanical), Electrical & Instrumentation

Service Management and Deployment (20k to 20m)

Coordinate Subcontractors and Vendors

Inventory, Material and Equipment Management

Account Executive

Quality Assurance & Control,

OSHA Safety Training

Systems Turnover

02/2005 – 03/2007 Firetron Inc. Houston, TX

Project Manager

Coordinate, Manage Sales, Marketing and Operations

Texas Medical Center at (2m to 35m)

Service Operations/Programming (300k-2m)

Account Executive

Inventory, Material and Equipment Management (2k-45m)

Planning/Scheduling (Primavera 3, Micro Soft Project, SureTrak, Excel)

Project Billing and Financial Management (2m-35m)

Quality Assurance & Control

Electrical & Instrumentation

Inspections and Safety Training

06/2002 – 02/2005 Tyco SimplexGrinnell Houston, TX

Project Manager

Planning/Scheduling (Primavera 3, Micro Soft Project, SureTrak, Excel)

Coordinate Personnel, Contractors, Sub-Contractors and Vendors

Account Management (5k-30m)

Chemical Plant (LNG, Refining/Fractionation) Operations, Maintenance & T/A

Inventory, Material and Equipment Management (4k-12m)

Safety/Inspections and Training, Quality Assurance & Control

Project Billing and Financial Management (2m-20m), Systems Turnover

10/1997 – 05/2002 Clark Construction/Enron

Project Manager (20m-500m) (Construction)

Project Survey, Excavation, Direct Burial Plumbing, Electrical and Piping Installations

Concrete/Foundation Prep/Completion, Steel Erection, Tilt Wall Steel Erection for Single

and Multi-Level Strip Centers and Office Building Facilities. Crane and rigging placement

for the erection of tilt or precast wall or panel and ensuring all Safety is adhered to before

and during the lift. Inspection of the wall/panels inserts and embeds are clean and braces

have been attached before lifting is to take place. After erection ensuring that the bracings

are not removed until after the roofing and decking have been installed and once completed

then the work can begin in patching holes in the floor and all other finishing work. Begin all

Special Systems Installations, Information Systems, Telecommunications, HVAC

E & I, MEP, Systems Turnover, Commissioning, Inventory Control (300m)

08/1991 – 09/1997 Halliburton Services, Houston, TX

Maintenance Manager, Scheduling and Planning (Suretrak, Primavera)

Manage and Coordinate T/A & Maintenance within and around the Facilities

Boilers, Heat Exchangers, Chillers, Pumps, Emergency Generators, Electrical &

Instrumentation Controls, Water Treatment and Purification, Environmental Waste

Manage and Coordinate Capital, Lump Sum and T&M Projects, Hire Contractors,

Subcontractors. Systems Turnover and Finalization.

OSHA 500 Safety and Training.

06/1987 – 08/1991 Otis Engineering, Friendswood, TX

Slick-line Operator, Maintenance and Service Oil and Gas Rigs, Platforms and Pumping

Stations for Shell, Mobil Oil, Exxon, Gulf States and Tenneco

Electrical & Instrumentation

Water Treatment and

Purification, Environmental Waste

Capital, Lump Sum and T&M Projects

Systems Turnover

OSHA Safety, Training and Inspection

Contact Information:

Cell: 281-***-****

Email: acry28@r.postjobfree.com



Contact this candidate