Education
J. Frank Dobie H.S.
Texas A&I University
BS Management
(In Progress)
Training
OSHA 500 Training Health & Safety
HAZWOP
Auto Cad
Drafting and Development
NFPA72 /101
NEC
Electrical
Instrumentation
ANSI
ISO9001
Fire and Safety Electronics 101
BICSI Certification
PMP Certification
National Institute of Certified Engineered Training
LEAN Certification
TWIC
Total Years of Experience
28
06/2014 - 06/2015
ISC Constructors, L.L.C. (87M-115M)
Sr. Commercial Construction/Project Controls Manager
Contract Mediation/Negotiation, Marketing, Commercial and Project Site Productivity, Cost Estimation, Earned Value Planning and Scheduling, Cost Analysis for Financials and Data Analysis’s, Identifying Trends and Variances to Prepare Project Reports and Forecasts. RFI’s and Change in Work Preparation Negotiations and Acceptance, Implement Progress and Performance Measurement and Presentation of Estimates, Schedules and Progress Reports. Provide Input and Support the Development of the Project Execution Plans. Analyze Critical Float Paths, Microsoft Projects, SAP, View Point, J.D. Edwards Cost Accounting and Quick Plans, Field Applications / Civil 34.5Kv and Instrumentation Underground Design of Duct Bank Preparation and Installation for ERP/EPC New Construction.
04/2012 – 06/2014
TURNER INDUSTRIES GROUP, L.L.C. (Western Division)
Project Controls Manager Western Region(Turnaround, Capital and Construction)
Pasadena, Texas Office (50K – 1.2B)
Support Clients and Personnel by Supervising Cost Estimates, Marketing, Plans and Schedules. Perform Cost Analysis of pending and existing Projects while Analyzing Data and Earned Value, Identifying Trends and Variances to Prepare Project Reports and Forecasts. Implement Progress and Performance Measurement and Presentation of Estimates, Schedules and Progress Reports. Provide Input and Support the Development of the Project Execution Plans. Analyze Critical Float Paths, Develop Schedules utilizing Oracle Primavera P-6 v.7, Microsoft Projects, Win PCS, SAP, J.D. Edwards Cost Accounting and Quick Plans. Manage Mentor, and Influence Project Controls Personnel within the State of Texas and Western Region.
10/2011 – 07/2012 KBR @ Skikda, Algeria (North Africa)
Sr. Technical Services (Construction)(250M – 1.8B)
New LNG Train(Fractionation)
Project Controls (P6, IPMS, CWP/FIWP)
Reliability, Progress Measurement
Earned Value Cost Tracking
QA/QC Auditing
LTCS/CS/SS/TITANIUM
Workface Planning and Scheduling (Civil, Structural Steel, Electrical, Carpentry, Fitters, Welders, Boiler Makers)
Heat Exchangers, Chillers, Pumps, Flare Stacks, Electrical & Instrumentation Controls, Water Treatment and Purification
08/2010 – 10/2011 KBR @ ExxonMobil Houston, TX
Facilities Operations/Maintenance Manager - Operations and Maintenance ExxonMobil Facilities, Scheduling and Planning (Primavera 3 & 6, Microsoft Project & Excel, SAP), Manage and Coordinate T/A & Maintenance within and around the Facilities(i.e...Plumbing, Electrical, HVAC, Carpentry, Preventative Maintenance on Fire Alarm and Life Safety, Security, Boilers, Heat Exchangers, Chillers, Pumps, Emergency Generators, Electrical & Instrumentation Controls, Water Treatment and Purification, Environmental Waste, Estimating (20K – 350M)
Manage/Coordinate Capital, Lump Sum and T&M Projects, Hire Contractors, Subcontractors and Vendors for additional Maintenance. Conduct weekly, bi-weekly and monthly progress reports on financials for all Facilities with overview on budget costs, savings and profitability. Systems Turnover and Finalization.
OSHA 500 Safety Auditing.
05/2009 - 07/2010 NetVersant Houston, TX
Operations/Project Manager - Design, Estimating, Planning/Scheduling (Microsoft Project, Oracle Primavera, Access, SAP, Excel, ) Oracle Cost Analysis( equipment, material, and manpower loading) Financials
Communication, Organization and Development with Owners, Contractors, Sub-Contractors, Vendors, Company Management and Superintendents
Service Management and Deployment (20k to 12m)
Account Executive, Inventory, Material and Equipment Management
Quality Assurance & Control, Safety and Inspection Training(Civil/Mechanical-Green Field/Brown Field)
Systems Turnover Surveillance/Intrusion/Access Control Security Systems
01/2009 – 05/2009 Texas Terminals Houston, TX
Safety Manager
Maintenance Groups/Technicians Training
Safety Inspections/construction sites
Risk Assessment and Reviews: Fire/Security/Safety
Accident Inquiries/Root Cause Study - Abatement
Incident/Accident Reports
OSHA Record Preservation
Budget/Financials Management
Fire Control System Maintenance/Testing
Installation/Preservation of Surveillance/Security Systems
03/2007 – 01/2009 Koetter Fire Protection LLC Houston, TX
Sr. Project Manager
Design, Estimation, Marketing, Planning/Scheduling (P3, Microsoft Project, Excel)
Financials (100k-15m), Equipment, Material and Manpower Loading
Communication and Organization with (Owners, Contractors, Sub-Contractors,
Risk Management/Project Controls
Chemical Plant (Refining, LNG/Fractionation) T/A & Maintenance
Operations/Maintenance (Civil/Mechanical), Electrical & Instrumentation
Service Management and Deployment (20k to 20m)
Coordinate Subcontractors and Vendors
Inventory, Material and Equipment Management
Account Executive
Quality Assurance & Control,
OSHA Safety Training
Systems Turnover
02/2005 – 03/2007 Firetron Inc. Houston, TX
Project Manager
Coordinate, Manage Sales, Marketing and Operations
Texas Medical Center at (2m to 35m)
Service Operations/Programming (300k-2m)
Account Executive
Inventory, Material and Equipment Management (2k-45m)
Planning/Scheduling (Primavera 3, Micro Soft Project, SureTrak, Excel)
Project Billing and Financial Management (2m-35m)
Quality Assurance & Control
Electrical & Instrumentation
Inspections and Safety Training
06/2002 – 02/2005 Tyco SimplexGrinnell Houston, TX
Project Manager
Planning/Scheduling (Primavera 3, Micro Soft Project, SureTrak, Excel)
Coordinate Personnel, Contractors, Sub-Contractors and Vendors
Account Management (5k-30m)
Chemical Plant (LNG, Refining/Fractionation) Operations, Maintenance & T/A
Inventory, Material and Equipment Management (4k-12m)
Safety/Inspections and Training, Quality Assurance & Control
Project Billing and Financial Management (2m-20m), Systems Turnover
10/1997 – 05/2002 Clark Construction/Enron
Project Manager (20m-500m) (Construction)
Project Survey, Excavation, Direct Burial Plumbing, Electrical and Piping Installations
Concrete/Foundation Prep/Completion, Steel Erection, Tilt Wall Steel Erection for Single
and Multi-Level Strip Centers and Office Building Facilities. Crane and rigging placement
for the erection of tilt or precast wall or panel and ensuring all Safety is adhered to before
and during the lift. Inspection of the wall/panels inserts and embeds are clean and braces
have been attached before lifting is to take place. After erection ensuring that the bracings
are not removed until after the roofing and decking have been installed and once completed
then the work can begin in patching holes in the floor and all other finishing work. Begin all
Special Systems Installations, Information Systems, Telecommunications, HVAC
E & I, MEP, Systems Turnover, Commissioning, Inventory Control (300m)
08/1991 – 09/1997 Halliburton Services, Houston, TX
Maintenance Manager, Scheduling and Planning (Suretrak, Primavera)
Manage and Coordinate T/A & Maintenance within and around the Facilities
Boilers, Heat Exchangers, Chillers, Pumps, Emergency Generators, Electrical &
Instrumentation Controls, Water Treatment and Purification, Environmental Waste
Manage and Coordinate Capital, Lump Sum and T&M Projects, Hire Contractors,
Subcontractors. Systems Turnover and Finalization.
OSHA 500 Safety and Training.
06/1987 – 08/1991 Otis Engineering, Friendswood, TX
Slick-line Operator, Maintenance and Service Oil and Gas Rigs, Platforms and Pumping
Stations for Shell, Mobil Oil, Exxon, Gulf States and Tenneco
Electrical & Instrumentation
Water Treatment and
Purification, Environmental Waste
Capital, Lump Sum and T&M Projects
Systems Turnover
OSHA Safety, Training and Inspection
Contact Information:
Cell: 281-***-****
Email: acry28@r.postjobfree.com