JEFFREY SABADO PACIS
#** ******** **. ****. *********,
Malabon City, Philippines
Mobile#:+63-929*******/ +63-977*******
E-mail :acrway@r.postjobfree.com/ acrway@r.postjobfree.com
OBJECTIVE :
Seeking employment with a reputed company engaged in telecommunications industry and be able to explore the knowledge and skills learned in a way of contributing these capabilities to your company and be a part of success in achieving its goal.
ACHIEVEMENTS:
REGISTERED ELECTRONICS ENGINEER
License #: 0050295
Professional Regulation Commission
April 18, 2012
HUAWEI BTS AND MICROWAVE EXAM PASSER
Pass ID #: 139
Category: WIRELESS LEVEL 1
Huawei PBCOM Makati City
December 22, 2014
HUAWEI TDD LTE TRAINING AND EXAM (PASSER)
Category: WIRELESS LEVEL 2
Cavite Warehouse
September 4, 2015
EDUCATIONAL BACKGROUND:
2005 – 2011 : University of Pangasinan - PEN Bachelor of Science
Arellano St. Dagupan City in Electronics and Pangasinan, Philippines Communication Engineering
2001–2005 : Manaoag National High School Secondary School
Bautista St., Manaoag,
Pangasinan Philippines
1995 –2001 : San Jose Central School Elementary School
Del Carmen, San Jose
Camarines Sur, Philippines
PROFESSIONAL EXPERIENCE
COMMTREND CONSTRUCTION CORPORATION (May 2012 – Present)
PROJECT INVOLVEMENT:
Project Name: Huawei – Globe LTE Vindicator
Position: Site Engineer/ Team lead
Company: Commtrend Construction Corporation
Period: May 2015 – Present
Duties and Responsibilities
oMonitors and supervise team activity such as Installation, PAT and Rectification
oInstallation of FDD LTE equipment
oDocumentation such as As-build, VSWR Results, PATDOCS Etc.
oConduct Testing such as VSWR sweep-test, Functionality Testing (speedtest such as upload and download)
Project Name: Project UNO Ericsson – Smart Rollout
Position: Site Engineer/ Team lead
Company: Commtrend Construction Corporation
Period: May 2015 – Present
Duties and Responsibilities
oLead the team during site survey
oTSSR Documentation
oCoordinates Clients before, during and after the activity
oLead the team for onsite Implementation such as (delivery, installation, rectification and acceptance)
Project Name: NOKIA – SMART PROJECT 101 3G ROLLOUT
Position: Site Engineer/ Team lead
Company: Commtrend Construction Corporation
Period: September 2014 – May 2015
Duties and Responsibilities
oTeam Leader in Installation, Acceptance and Rectification
oInstallation of 3G FMR Equipment
FSMF / FRGT module
FSMF / FRGP module
FSME / FRGP module
oCommissioning and Integration
Software update
Commissioning using parameters in data fill given by Nokia
Before and after VSWR testing using Anritsu site master
Gathering of data log files, snapshots, site information, commissioning files and photos for documentation
oPerforms Power meter testing using Bird Power Meter
oPerforms Functionality Testing such as
SMS, Voice call, MMS and Video call
Project Name: NOKIA – SMART FDLTE ROLLOUT
Position: Site Engineer/ Team lead
Company: Commtrend Construction Corporation
Period: September 2014 – May 2015
Duties and Responsibilities
oInstallation of LTE FMR Equipment
FSMF / FRGT module (LN5 software version)
FSMF / FRGP module (LN4 software version)
FSME / FRGP module (LN4 software version)
oCommissioning and Integration
Software update
Commissioning using parameters in data fill given by Nokia
Power Meter testing using Bird power meter
Before and after VSWR testing using Anritsu site master
Gathering of data log files, snapshots, site information, commissioning files and photos for documentation
oPerforms Functionality Testing such as
Speedtest, FTP (Upload and download), SMS, Voice call and MMS (Idle or Connected status)
Project Name: HUAWEI – GLOBE NEMESIS NCR SWAP (124 Sites)
Position: Site Supervisor/ Site Engineer/ Team lead
Company: Commtrend Construction Corporation
Period: June 2012 – May 2015 (Closing)
Duties and Responsibilities
As Project Supervisor:
oResponsible for planning, organizing and supervising the work of subordinates in the installation and testing of Huawei BTS Equipment
oScheduling and monitoring of activities such as Swap-out, Preliminary Acceptance Test(PAT) and Site Rectification
oMeet the target/deadline and schedules set by the client
oEnsure that team receives the appropriate responsibilities required to be successful in their roles
oSubmit reports (test data, installation photos and checklists, etc.) upon completion of installation, commissioning and integration.
oUpdate trackers such as daily activities, plans and progress of the project
As Site Engineer / Team Leader
oLead the team in Installation, Rectification and acceptance activity
oPerforms installation, commissioning and troubleshooting of Huawei Equipment
BTS3900L – For Indoor site
BTS3900A – For Outdoor site
DBS3900 – For IBS Site
oPerforms Loopback test w/ NOC for E1 transmission testing before and after swap-out activity
oLead the team in Swapping of Nokia to Huawei Equipment
oAlarm Simulation and Testing
oCoordinating w/ NOC Globe and Huawei personnel for site implementation status before, during and after the activity
oPerforms VSWR testing before and after of BTS antenna system using Anritsu site masters
oPerforms Functionality testing such as
For 2G – SMS, MMS, and Voice call
For 3G – SMS, MMS, Voice call and Video call
oPrepares Huawei Site Quality Report (HSQR) needed in the submission of project documents
oPerforms VSWR Isolation per component and rectification
TECHNICAL SKILLS:
oKnowledge in telecom Test equipment such as:
Bird Power Meter
Anritsu Site master
Nokia(Netmon software) and Sony Ericsson Test phone for Functionality Testing
GPS, Compass etc.
oIntegration and Commissioning
Nokia 3G and LTE equipment
Huawei 2G and 3G Equipment
SEMINARS AND TRAINING ATTENDED:
ZTE Smart CEN Project – Site Acceptance and Commissioning Training
16th Flr.Petron Mega Plaza Bldg.
Makati Philippines
July 31, 2015
Alcatel-Globe LTE Installation and Commissioning Training
9th Floor, Globe Valero
Makati City, Philippines
August 26-27, 2014
On-the-Job training (OJT) at STRINGS COMPUTERS AND TECHNOLOGIES
Fernandez Bldg Perez Blvd.
Dagupan City, Pangasinan
On-the-Job training (OJT) at 98.3 LOVE RADIO
M.H. Del Pilar St.,
Dagupan City, Pangasinan
PERSONAL INFORMATION:
Date of Birth : January 14, 1988
Place of Birth : Alicia, Isabela
Civil Status : Single
Height : 5’8”
Religion : Roman Catholic
Sex : Male
Nationality : Filipino
Father : Roy P. Pacis
Occupation : Electrical technician
Mother : Susan S. Pacis
Occupation : House wife
CHARACTER REFERENCES:
Glendale Salayon
Project Manager
Huawei Technology Philippines
Jessie Era
Acceptance and Quality Assurance Team (QAT)
Huawei Technology Philippines
Allan Cris Valencia
Project Manager
Commtrend Construction Corporation
Norman Santos
Project Supervisor
Commtrend Construction Corporation
I, JEFFREY S. PACIS, do hereby certify that all the above statements are true and correct to the best of my knowledge and beliefs.