Curriculum Vitae
*.Name of staff: Manuel Novo Buján
2.Position: Hydropower Operations and Maintenance Head
3.Company: First Gen Hydro Power Corporation
4.With the company since: Jan-2015
5.Professional Title: Industrial engineer (electrical speciality 1997. Structures Master 2009).
6.Date of birth: 6-11-1971
7.Nationality: Spain
8.Details: acru1i@r.postjobfree.com, Tel. : +349********, Mobile : +639*********, +346********, skype ID : mnovobujan
9.Professional Education:
Institution
E.T.S. Industrial Engineers, University of Vigo, Spain
Date
1997
Degree
MSc Industrial Engineer (electrical)
Institution
Abanca Business School at Vigo (Caixanova)
Date
2004
Degree
Executive MBA
Institution
E.T.S. Industrials Engineers, University of Vigo, Spain
Date
2009
Degree
Course in industrial buildings and constructions (one year program)
10.Training courses:
• COURSE IN PREVENTION OF RISKS AT WORKPLACE, HSE. 2001. Specialty in Security at work environment. Equivalent of NEBOSH, by Oficial College of Technical Mining Engineering. Six months.
• Industrial Security, Power Electrical Systems, Industrial Applications, Metallic Technologies of Electrical Aparamenta, Quality inside Industry, Metallic Structures, Bioclimatic Architecture, Prevention of Labour Risks, Electrical Protections Technology, etc.
Project management PMP course.
11.Countries of work experience: Spain, Portugal, UAE, Philippines, Kenya, Uganda, Angola, Qatar, Saudi Arabia, Oman..
12.Employment record:
Date
January 1998 to June 1998
Employer
Pumade, S.A.
Position held
support engineer at Production and Quality Department, Lalín (Spain)
Date
June 1998 to August 2000
Employer
Cortizo Hidroeléctricas, S.A. (Cortizo Group), Spain. http://www.cortizo.com/
Position held
Technical Director
Date
August 2000 to November 2000
Employer
Freelance Industrial Engineer designing a parking supermarket for DIA (Carrefour) in Verín, Spain.
Position held
Owner
Date
November 2000 to August 2003
Employer
GAMESA ENERGÍA RENOVABLES, S.A., Spain. http://www.gamesacorp.com/es/
Position held
Area Manager
Date
August 2003 to February 2006
Employer
Tasga, Ltd. (Copasa group), Spain. http://www.copasa.es/
Position held
Industrial Director
Date
February 2006 to June 2006
Employer
Preparing exams for industrial engineer position at spanish public administration.
Position held
Student
Date
June 2006 to September 2006
Employer
Empresa pública Hospital Costa del Sol, Marbella, Spain. Public Company Hospital Costa del Sol.
Position held
General Services Department Director support engineer.
Date
September 2006 to October 2013
Employer
Novo Consultores, electrical instalations, energy, environment and infrastructures consultant
Position held
Freelance industrial engineer, owner
Date
October 2013 to January 2014
Employer
Sogreah gulf, electrical mechanical engineer http://www.arteliagroup.com/
Position held
Senior Industrial engineer
Date
January 2014 to present day
Employer
Leliadoura, S.L., consultancy
Position held
Senior electromechanical engineer, project manager
Date
January 2015 to present day
Employer
First Gen Hydro Power Corporation
Position held
Operations and Maintenance Head.
13.Software : Amtech, Dialux, ABB Doc, Siemens Simaris, ETAP, Bentley substations, Turbnpro, Bentley waterhammer, AFT impulse, Pipenet.
14.Professional Experience:
Some examples of power plants designed, constructed and operated.
Name of assignment or project: Masiway Hydropower Project - Philippines
Year: from Jan 2015 to present
Location: Nueva Ecija, Philippines
Client: First Gen Hydro Power Corporation
Main project features: This project comprises a 25 m high RCC dam, 9x16.85 m substation, 21x35 m underground powerhouse with 1x12 MW Kaplan turbine-generator unit, outdoor switchboards 13.8 kV, LV/MV, I&C and SCADA.
Outdoor substation: 13.8/69 kV for generation bay
Positions held: Project Manager, OM Head
Activities performed: Management of the refurbishment of the HPP comprising excitation, governor, main transformer, protection and metering and substation circuit breaker.
Name of assignment or project: Jamba-Ia-Mina Hydropower Project - Angola
Year: from May 2013 to June 2013
Location: Jamba-Ia-Mina, Angola
Client: Sogreah FZCO
Main project features: This project comprises a 38.5 m high RCC dam, 612 m dam overall length, 2x5.6x10.55 m intake gate, 223 m length and 6x4.2 m diameter penstock, 23.4x96 m surface powerhouse with 3x74.6 MW Francis turbine-generator unit, indoor switchboards 15 kV, LV/MV, I&C and SCADA, and a 0.18 Km length 15 kV Underground powerline.
Outdoor substation: 15/220 kV for generation bays, 220/30 kV for distribution bay, 75x64 m.
Positions held: electromechanical engineer.
Activities performed: redesign new surface powerhouse and switchyard.
Name of assignment or project: Laxosa wind farm Project - Spain
Year: from January 2008 to Oct 2008
Location: Laxosa, Pontecaldelas - Spain
Client: Gaeólica, S.L.
Main project features: The project comprises a 6 wind turbine generators REpower 3.3 MW, 19.8 Mw, more than 3 km gradded aggregate access roads, 2 MV circuits, more than 3 km optical fiber, operation and maintenance building, more than 3 km 20 kV cable trenchs and Underground powerline, LV and MV switchgears, I&C and SCADA.
Outdoor substation 20/66 kV, 415 k€, 18x22 m.
Overhead powerline: 4 km 66 kV, 185 k€.
Positions held: Project director, design engineer.
Activities performed: Designing, planning, scheduling and budgeting.
Name of assignment or project: Touro Hydropower Project - Spain
Year: from June 2003 to February 2006
Location: Ollares, Touro, Spain
Client: Tasga, Ltd.
Main project features: The Salto de Touro project comprises a 29.75 m high RCC dam, 15 x 6 m section headrace tunnel, 21 m long penstock, surface powerhouse with 2x7 MW Alstom Kaplan turbine-generator units, mechanical equipments, LV/MV, I&C and SCADA.
Outdoor substation: 6/66 kV, 335 k€, 12x20 m.
Overhead powerline: 7.7 km length, 66 kV, 1.16 m€.
Positions held: project director.
Activities performed: Project Manager, site construction supervision, procurements manager, planning, scheduling, budgeting, commissioning and operation and maintenance manager.
Name of assignment or project: Caldas de Reis Segade powerhouse Hydropower Project - Spain
Year: From June 1998 to August 2000
Location: Caldas de Reis, Spain
Client: Cortizo Hidroeléctricas, S.A.
Main project features: The project comprises a 38.5 m high RCC dam with an overall length of 161 m, 625 m of 3 m dia. headrace tunnel, gates tower, 60 m long penstock and 12.5x35 m surface powerhouse with 2 x 4.5 MW Baliño Francis turbine-generator units, 20 kV indoor cabinets.
Indoor substation: 6/20 kV, 85 k€.
Overhead powerline: 2.3 km length, 20 kV, 225 k€.
Positions held: project director.
Activities performed: Project Manager, site construction supervision, Designer engineer, Procurements Manager, planning, scheduling, budgeting, commissioning, Plant Director for operation and maintenance.
15.Relevant Working Experience:
Cortizo Hidroeléctricas, S.A. (Cortizo Group), GAMESA energías renovables, S.A., Tasga, Ltd.(COPASA), Sogreah Gulf FZCO Dubai (ARTELIA GROUP).
16.Languages (1-Excellent, 5-Basic):
Language
Reading
Writing
Speaking
English
1
2
3
Portuguese
1
2
2
Spanish
1
1
1
17.Membership of professional associations:
Member of Colegio de Ingenieros Industriales de Galicia, Spain
Member of Asociación de Ingenieros Industriales de Galicia, Spain
Planning to become chartered engineer from IET (UK).
18.Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my experience.