*/**/**** **-** resume-*.docx
chrome-extension://bpmcpldpdmajfigpchkicefoigmkfalc/views/qowt.html 1/4 Seth Eudy
***** ****** ***** ******, ** 77365
832-***-**** * acrt5o@r.postjobfree.com
WORK EXPERIENCE:
AWC FRAC VALVES
5/2014 to Present
QC Inspector
11376 FM 2854
Conroe TX 77304
● Perform dimensional inspection per engineering prints.
● Perform first article, final, and receiving inspection on machined parts.
● Verification of documentation on all receiving parts.
● Write up NCR’s to any part not in tolerance of specifications.
● Use Rockwell and Birnell hardness testers to engineering specifications. Use of Dial and digital calipers, OD/ID mics, depth mics, Telescoping mics, ball mics, mic over wires, PG6000 Gauge Maker and Bore gauges to ensure measurements are in tolerance per engineering drawings.
●
APPLUS VELOSI
6/2013 to 5/2014
QA/QC INSPECTOR
222 Pennbright, Suite 230
Houston, TX 77090 USA
● Verification of Material Test Reports per ASTM.
● Perform dimensional inspection per engineering prints.
● Write up NCR’s to any part not in tolerance of specifications.( Log NCR on Windows Office.)
● Witness Hydrostatic Testing on various Items. (piping and valves)
● Performed dimensional inspection during the fabrication process of fittings.
● Performed first article and final inspection on fittings and valves and valve parts.
● Performed shipping inspection on fittings. (packaging, crating, and documentation)
● Verification of Lab Test Reports for Destructive testing.
● Perform Liquid Penetrant Test on machined fittings and valves.
● Perform daily reports that document daily activities using windows office. Use of Dial and digital calipers, OD/ID mics, depth mics, Telescoping mics, ball mics, mic over wires, PG6000 Gauge Maker and Bore gauges to ensure measurements are in tolerance per engineering drawings.
●
● Use Rockwell and Birnell hardness testers to engineering specifications.
● Follow shop safety programs to insure 100% free accident workplace. 3/12/2015 QC-14 resume-3.docx
chrome-extension://bpmcpldpdmajfigpchkicefoigmkfalc/views/qowt.html 2/4 LINDINGER INSPECTION COMPANIES
6/2012 to 6/2013
QUALITY ASSURANCE THIRD PARTY INSPECTOR
4242 Bluebonnet, Stafford, Texas 77477
● Inspection of documentation of verification.
● Performed final inspection on various valves.
● Performed shipping inspection on valves. (packaging, crating, and documentation)
● Verification of drawings per ASME-API
● Verification of MTR and PMI reports
● Operate micrometer, dial calipers, and tape
measure to insure correct measurements.
SOLUTION TECH STAFFING
CRANE VALVE
1/2010-5/2012
Valve Tech
2825 Wilcrest, Suite 678 Houston, TX 77042
● Disassemble and Reassemble Globe, Gate, and Pressure Valves
● Uninstall and install valves
● Repack, grease and paint valves
● Complete JHA's and permit recipient
● Operate pneumatic and hand tools, rigging equipment
● Operate forklift and man lift
● Work turnarounds,(days and nights)
CONAM
8/2007-1/2010
3/12/2015 QC-14 resume-3.docx
chrome-extension://bpmcpldpdmajfigpchkicefoigmkfalc/views/qowt.html 3/4 ExxonMobil
QA/QC/NDT Inspector
Baytown, TX
Perform LP, UTT, and MT exams on various parts ( pipes, vessels, pumps, and welds)
Complete detailed NDT reports on the parts tested.
Permit recipient and JHA (job hazard analysis) and JQP (job quality procedure) trained
Complete task without supervision, document daily activities and keep time records
BK ELECTRIC COMPANY
6/1998 - 8/2007
Electrical Maintenance Apprentice
Houston, TX
Re-wire office buildings and warehouses. (Commercial and Industrial)
Install lights, outlets, switches
Terminate panels and breaker boxes
Operate forklift, JLG manlift, and overhead crane
Perform wire pulls and install cable tray
Bend and install conduit
EXXON EXPLORATION / RESEARCH & ENGINEERING
3/1997 – 6/1998
Technical / Administrative Assistant
Houston, TX
Digitize geological maps into computer system, maintain project files
(Exxon proprietary and general), inventory and order supplies, distribute mail to section
Using Microsoft Office, create spreadsheets, forms, tables and documents for the section
Accomplished extremely technical filing process for Order Assignment, Contract, Project,
3/12/2015 QC-14 resume-3.docx
chrome-extension://bpmcpldpdmajfigpchkicefoigmkfalc/views/qowt.html 4/4 Inspector & general files
ACADEMIC EDUCATION
2007 San Jacinto College Nondestructive Evaluation certifications. Houston, TX (Visual, Liquid Penetrant, Magnetic Particle Level II) 1998 Humble High School
Humble, TX