PROFESSIONAL PROFILE

Mechanical Engineer experienced in reliability and maintenance for systems, facilities and equipment. Strong knowledge in project management and supervising personnel. Excellent human relationships who promotes team work. Great field experience and troubleshooting. Strong emphasis on the compliance of design, specifications and safety using good engineering practices. Proficient in Computerized Maintenance Management System (CMMS). Meaningful experience extended to the areas of Construction, Inspections, Quality, Commissioning and Qualification fields to Pharmaceuticals and Bio-technology Industries, Medical Devices, Oil & Gas Industries and Commercial Business.

CORE COMPETENCIES

Project Management

Reliability Centered Maintenance

FMEA

PLC & Control Systems

Troubleshooting

PCR

GMP Standards

FDA & OSHA Regulations Compliance

COMPUTER SKILLS

Microsoft Office (Word, Excel, Power Point, Outlook, Microsoft Project

Global Maintenance and Reliability System (GMARS)

AutoCAD

Corel Draw

Kaye® Validator 2000

SolidWorks

FMEA Pro 8

MAXIMO

TRAININGS & CERTIFICATIONS

Current Good Manufacturing Practices (cGMP)

Introduction to Computer Validation

Cleaning Validation

Good Documentation Practices (GDP)

Kaye Validator 2000

Instrumentation

Compressed Air Validation

Heating, Ventilating and Air Conditioning (HVAC) Validation

Business Development

Photovoltaic Energy Systems

SolidWorks and Essential Parts and Assembly

How Establish and Develop a Business

MAXIMO/CMMS

Certified Welding Inspection Seminar

FMEA Leadership & FMEA Pro Software Training

30 hours OSHA General Industry Safety and Health

EDUCATION

LANGUAGES

Bachelor Degree in Science of Mechanical Engineering from the Polytechnic University of Puerto Rico an ABET accredited program.

English and Spanish literate. Able to read, develop and interpret technical documents in both languages.

PROFESSIONAL EXPERIENCE

Engineer, 2011-Present

Mentor Technical Group, Corp.

As Business Unit Manager I

Directly supervision of BU Leaders, BU Supervisors, Project Engineer and Utilities Engineers.

Direct supervisor of over 50 employees and in more than 7 customers.

Business development and support in new services on existing clients.

Lead coordinator of Operational Schedules and Customers Support Responsible of direct and indirect cost control.

Managed all financial aspect of the business unit effectively.

Monitored performance tendencies to identified possible roadblocks that can affect the business unit performance.

Managed and monitored the PO lifecycle to identify what PO is expiring for possible extensions and/or employees availability for new projects including POs efficiency to reduce business impact.

Enforce compliance with the company operation and safety procedures.

Establish strategies and KPIs for company goals and future business success.

As Reliability Engineer

Site Reliability leader in point of contact between office and client with all relevant of our personnel (Process Engineers, Reliability Engineers, C&Q Specialists, Drafters, CMMS & Sr. CMMS Technicians, Jr. Engineers, Maintenance Specialists, Instrumentation and Mechanical personnel) on site.

PROFESSIONAL EXPERIENCE (Continue)

Generated and managed the Reliability Centered Maintenance (RCM) strategies and completion for capital projects.

Responsible of management of the maintenance package development (MPD) oriented to Operating Context and Failure Mode and Effect Analysis (FMEA), Location Loading Sheet, Asset Loading Sheet, Job Plans, Data Sheets, Spare Parts BOM and Spare Parts Stocking Strategy.

Review and establish preventive maintenance action in regards to data gathered from bad actors and shutdowns.

Generated Project Change Request (PCR) for improvements of operation or process discrepancies.

Reviewed design and drawings for compliance with the standards and codes per maintainability, accessibility and ergonomic requirements.

Member of the technical review Team regarding maintainability compliance.

Reviewed the specifications for compliance with the standards of the company including new equipment and instrumentation.

Supported and troubleshooter equipment on the startup and commissioning phase.

Improved preventive maintenance job plans and routes regarding equipment and facilities.

Project Manager 2005-2010

EngInspec, Corp.

Responsible of projects development from design phase to project completion.

Responsible to defined project scope, goals and deliverables that supported business goals in collaboration with others senior team members.

Developed full-scale project plans and associated communications documents.

Responsible of project cost control by drafting and submitting projections and tendencies to customers to predict budget changes where necessary.

Lead technical and professional personnel (such as others engineers, inspectors) establishing strategies for their development and maximum performance.

Establish goals and continually managed of project expectations with team members and customer.

Quality Assurance consultant in the welding production and documentation process for hygienic and non-hygienic process in pharmaceutical and chemical plants.

Responsible of coordination of non-destructive examination services for new construction activities in International customers such as ABBOTT, BMS and others

Engineering Support and assistance of NDE LV II technical support to Mechanical Integrity projects in piping, tanks and pressure vessels.

Company Good Documentation practices Consultant including training and orientation of personnel for quality practices oriented to successful project commissioning and validation. Served as Owner representative in critical projects and tasks including problem solving and non-conformances issues with contractors and others projects members.

Strong support as senior engineer to commissioning and validation teams in technical expertise for successful project completions.

Performed as quality assurance in the inspection for incoming material.

Performed inspections, monitored and provided assistance in the progress of complex facilities. Responded to inquiries and concerns from designers, contractors, and the general public regarding mechanical codes, inspections, and other related issues. Settle disputes between designers, contractors, public, and staff regarding interpretation of adopted codes to determine the best way to resolve issues.

Performed Non-Destructive Examination (NDE) to hygienic and Non-Hygienic mechanical piping for utilities such as: Glycol, Nitrogen, Water for Injection, Purified Water, Process Air, Clean Steam, Vacuum, Chemical Feed and Clean Waste.

Reviewed documents related to submittals, Piping & Instrumentation Drawings (P&Id’s), Isometrics drawings, mechanical inspection (Weld Logs & Weld Maps) and testing performed that were parts of the Turn-over Packages (TOP).

Developed, designed and maintained the pipeline matrix for hygienic and Non-hygienic piping for the Non-Destructive Tests (NDE) methods and Destructive Testing performed Prior fabrication, During Fabrication and Post fabrication.

PROFESSIONAL EXPERIENCE (Continue)

Witnessed the post installation required quality and compliance tests, such as pressure test, blowout, cleaning and passivation.

Assisted de NDT Inspector in the field inspection with Flaw Method to identify discontinuities and loss of wall thickness in the 24 inches piping of Fuel Oil.

Validation Engineer, 2001-2005

Washington Group International

Executed thoughtful plans to guarantee the timely delivery of schedules.

Kept the management advised of the status of assignment(s) with respect to schedule, budgets, delays and adverse problems.

Solid foundation in technical writing and validation procedures, Standard Operational Procedures (SOP) and follow-up the approval cycles.

Maintained up to date drawings by red-marking procedure.

Performed investigations on deviations of specifications for validation protocols.

Performed as Quality Control in the construction of utilities systems.

Developed Impact/Component Risk Assessments for validation & qualification Manufacturing Equipment.

Developed Commissioning and Validation proposals, Master Plans, Technical Services Reports and Plant assessments.

Developed technical documents on manufacturing and utilities agreements.

Responsible to coordinate commissioning and validation execution activities, liaising with manufacturing or utilities, Quality Control/Assurance to define resources and ensure completion of project within the timeframe.

Developed and maintained Risk Assessment (Fault Tree Analysis) to reduce scrap, minimize rework, reduce cost and improve quality to meet all requirements for the New Waste Water Treatment Plant.

Assisted as the construction mechanical engineer in the construction of the Waste Water Treatment Plant.

Managed the punch list completion of all mechanical systems of the Waste Water Treatment Plant as part of the Turn-over Packages.

Supervised the HVAC system installation of the Waste Water Treatment Plant.

Developed, executed and review installation, operational and performance commissioning and qualification protocols a well as validation reports according to Good Laboratories Practices (GLP), Good Engineering Practices (GEP) and current Good Manufacturing Practices (cGMP) for facilities, utilities, manufacturing and laboratory equipment.

Project Engineer, 1999-2000

Construction Engineering, SE

Continually founded solutions to conflicts in structural / architectural / mechanical / electrical drawings and specifications.

Reported accurate quantities for labor cost reports, accurately monitored material ledgers to determine if quantities remaining in the estimate are sufficient to complete the project in the field.

Identified contract document conflicts and recommend solutions.

Ensured construction work complies with all engineering standards, codes, specifications and design instruction.

Organized and managed personnel. Provided technical engineering information and interpretation of plans, detail sheets and specifications for contractors.

Reviewed shop drawings for conformance with the contract and ensure information is communicated to Foreman and Superintendent.

Installed 1,650 lineal feet of PVC sanitary piping underground.

Executed hydrostatic testing for PVC sanitary piping.

Rehabilitated pump water system station.

Rehabilitated and restored a water tank station.

Replaced steel manifold, valves, check valves, drainage, vents valves, etc.

Coordinated inspections with consultants and authorities as required.