Post Job Free

Resume

Sign in

Manager Project

Location:
Folsom, CA
Posted:
September 04, 2015

Contact this candidate

Resume:

Carol M.B. Rivera

916-***-****

**** ********** ***

Sacramento, California 95823

acrjq0@r.postjobfree.com

** ********* ****

Dear Hiring Manager,

I am interested in the Architectural Drafter - Revit position that may be available at your firm. From my attached resume, you will find that my experience in the A/E profession will meet your needs for the position.

I have worked at several architectural and engineering firms and have learned what it takes to successfully complete a project from its conception to the final built product. I have also worked with contractors on small and large projects, and they have taught me that it takes ‘teamwork’ to make each project a success.

I am currently making an on-going effort to obtain IDP credits so that I will able to take the architectural registration exams well as LEED Green Associate.

May we get together in person to talk about how your expectations for the person you hire and my job expertise can benefit your company? Please contact me to schedule an interview and to discuss future employment.

Thank you for the opportunity to introduce myself. I’m enthusiastic about meeting in person to see how I might help fill the opening and enhance the vision of your company. Sincerely Yours,

Carol M.B. Rivera

Carol M.B. Rivera

3990 Cottontail Way ~ Sacramento, CA 95823

Phone: 916-***-**** ~ Email: acrjq0@r.postjobfree.com Architectural Drafter - Revit

Project and Construction Management AutoCAD 2010-2013 Proficient Revit Architecture 2011-2014 Revit Structure 2013 On-Screen Takeoff 3 BIM Modeling Construction Documents Coordinator Construction Specifications Writer Minor Concrete Estimating Outlook Adobe Photoshop CS5 Intermediate Level Adobe Acrobat Adobe Illustrator Intermediate Level Microsoft Office Suite Proficient Ability to interpret plans and specifications With attention to detail and listening to the Client’s needs, I am able to take a conceptual ideas or schematic sketches to a production of a full set of Construction drawings (in AutoCAD or Revit format) ready for the Permit process to completed construction in an organized and timely manner. Also calculating figures to convert design dimensions to re-sizing dimensions specified for subsequent production processes. Coordinate closely with Engineers on the direction of where the Project is headed. As Construction Manager, I took care of Request for Information (RFI), Submittal and Payment Applications from the Contractor as well going to Site Visits that I generated Field Reports (with photos) that are sent to Client.

WORK EXPERIENCE

Electrical AutoCAD Drafter Support Jan 2015 – August 2015 Ken Rubitsky and Associates Sacramento, California Assisted Project Engineers in laying out electrical and lighting symbols onto site and building plans, power plans, one-line diagrams, fire alarm plans, cabinet design, equipment layouts, elevations, electrical details and schedules using AutoCAD for construction documents. Draw electrical details from Engineer's sketches. Update the CAD Library of details and symbols.

AutoCAD 2010 Support (Temporary) Dec 2014

Anderson & Doig Structural Engineers Sacramento, California Drew shop drawings of steel members using AutoCAD. Help the engineers with revisions and modifications of plans, sections and details. Projects include hospital facilities and multi-family residences. AutoCAD Civil 3D 2014 Support (Civil Engineering/Geotechnical) (Temporary Assignment) Aug 2014 – Sept 2014 SAGE Engineers Roseville, California

Modified existing plans, sections and details for the Engineers and Project Managers. Created details and sections for a Road Stabilization project. Projects were mainly for PG&E projects. Revit Architecture 2014 and AutoCAD 2014 Support (Planning) July 2013 – Jan 2014 CGL Companies / Hunt Sacramento, California

Using Revit Architecture 2014, made modifications of plans sections and details for the Planners and Project Managers. Also modeled workstations in 3D. Assisted in modifying details in AutoCAD for the firm's library of typical details. Maintained, organized and archives all project related documents. Revit Structure 2013 and AutoCAD 2010 Support Feb 2013 – July 2013 Anderson & Doig Structural Engineers Sacramento, California Used Revit Structure 2013 to help the engineers modifications of plans sections and details. Also modeled framing structure in 3D. Assisted in modifying details in AutoCAD as well as placing plans onto title block sheets per Engineer's instructions. Created PDF files to send back to the Architect or other consulting Engineers on the design team. Assured execution of and assists with quality control activities for architectural elements on a project. Revit Support (IT Department) Feb 2012 – July 2012 Clark Pacific, Inc. West Sacramento, California

Under the direction of senior designer, developed 2D and 3D design schemes, renderings, and construction drawings using BIM (Revit Architecture 2012). Assisted in measuring connection parts to be added to the Firm's AutoCAD macro tool pallets. Taught one-on-one AutoCAD lessons to an engineer. Gave Revit support to Engineers when needed.

BIM Modeling / Estimator (Pre-Construction) June 2010 – Jan 2012 Hawaiian Dredging Construction Company Honolulu, Hawaii Using Revit Architecture 2012 and AutoCAD 2011, prepared designs and construction documents. I have general knowledge of design development and production of construction documents. Assisted in architectural problem solving. Under the direction of senior designer, develops 2D and 3D design schemes, renderings, and construction drawings using BIM. Collaborated with other disciplines (Civil, Structural, Mechanical and Electrical engineers) making sure that problems don’t arise. Used math skills, assisted in simple estimations for smaller projects that involved concrete foundations such as footings, slab on grade, grade beams and wall footings. Informed sub-contractors by either e-mail or phone on upcoming projects if they are interested in bidding with Hawaiian Dredging. Maintained, organized and archives all project related documents. Assured execution of and assists with quality control activities for architectural elements on a project.

Electrical AutoCAD Drafter Support / CAD Management Jan 2010 – May 2010 Communication Consultant Services, Inc. (CCSI) Honolulu, Hawaii Assisted Project Engineers in laying out telecommunication symbols onto site and building plans, power plans, one-line diagrams, fire alarm plans, cabinet design, equipment layouts, elevations, electrical details and schedules using AutoCAD for construction documents. Helped engineers with research in Electrical Codes. Distributed CAD assignments to Junior Staff Draftsman. Created CAD standards and Detail Library to 'streamline' the efficiency of drawing. Upgraded the current AutoCAD system to coordinate with Architect and other engineering consultants. Organized and created Drawing File Management for engineers and Staff drafters. Produced drawings from sketches, mark-ups, existing as-builts, site maps, photos, field notes and existing drawing. Drew site plans from scratch with the aid of Google Earth and Adobe Photoshop. Report back to the engineers with the plans, having them “red line” areas that need revisions and plot out final plans ready for the Engineer’s stamp and signature. Maintained, organized and archives all project related documents. Projects varied from federal buildings, public housing, multi-family residential and emergency bell enhancement for public schools.

Architectural Designer Sept 2008 – Dec 2008

Graham Builders, Inc. (Residential and Commercial Contractors) Honolulu, Hawaii Met with potential clients. Assessed their needs if be a renovation or new construction to a residence. Gathered any ideas and/or wishes that they want to put in to their “Dream Home”. Using Revit Architecture 2009 and AutoCAD 2007, I took their schematic sketches and turned them into construction drawings (plans, elevations, building sections, details and schedules). Helped with choosing specialty equipment such as bathroom fixtures, kitchen appliances as well as door and window types. Other finishes chosen were floor finishes and paint for the exterior and interior. AutoCAD Support Jun 2007 – Sept 2007

Philpotts and Associates, Inc. (Interior Designers) Honolulu, Hawaii Under the direction of senior designer, developed 2D furniture layouts and interior elevations using AutoCAD 2007. Drew custom furniture and assembling material color boards for presentation to clients. Projects worked on were the renovation of the Royal Hawaiian Hotel in Waikiki and various residences. Project Manager / Construction Administrator / Architectural Designer Jan 2005 – Jun 2007 Pacific Atelier International (Architecture) Honolulu, Hawaii Took projects from concept to completed construction. Assess the Client’s needs whether it is tenant improvement such as an entire roof coating to repairing a preschool’s jungle gym. With the use of Revit Architecture 2009 and AutoCAD 2008 I drew plans, elevations, sections, details and schedules putting together an entire permit/bid package complete with specifications. Processed my own project’s building permit. Solicited potential contractors to bid on upcoming projects. Handled construction management by going out to site visits, writing reports to the Client showing the progress of the project. Kept lead architects or designated team leaders informed of progress; recognized problem issues and communicated impact to team, and sought clarity when necessary. Dealt with other parts of being a Construction Manager when concerns in the field arise such as RFI”s (request for information), product submittals, rain delays and payment applications. Assured execution of and assists with quality control activities for architectural elements on a project.. Maintained, organized and archives all project related documents. Projects include renovation to Resort Air Hangar Lagoon Drive (Honolulu Airport), Kamehameha Schools Capitol Improvements, Dole Plantation Store Expansion, Kamehameha Pre-Schools, Waikoloa Beach Village and Villas [Multi-Family Residential and Recreation Center] (Island of Hawaii) and AAA Hawaii Office Expansion. Architectural AutoCAD Support Mar 2002 – Jan 2005

Franklin Wong Associates (Architecture) Honolulu, Hawaii Site visits to various public schools to take field measurements when there are no existing drawings in the State’s archive, collected field notes and measurements, draw building plans and elevations using AutoCAD. Researched components for public areas such as government buildings and Public schools to comply with current ADA code. Assisted in putting together a permit package with collaborating with engineers of the team. Kept lead architects or designated team leaders informed of progress; recognized problem issues and communicated impact to team, and sought clarity when necessary. Organized and created drawing file management for Project Architect.. Assured execution of and assisted with quality control activities for architectural elements on a project. Maintained, organized and archives all project related documents. Projects include roof repairs at Kamehameha School Akahi Building, Kinau Hale (State of Hawaii Heath Department) Vital Records Expansion and repairs/ maintenance to various Public schools. Electrical AutoCAD Support Dec 1999 – Jan 2002

Albert Chong and Associates (Electrical Engineers and Lighting Design) Honolulu, Hawaii Assisted engineers with electrical and lighting symbols layout onto floor plans. Draw elevations and electrical circuit diagrams to be included into the construction documents. Organized and created Drawing File Management for engineers and other drafters. Reported back to the engineers with the plans, having them “red line” areas that need revisions and plot out final Lighting plans. One-Line Diagrams and Electrical details ready for the Engineer’s stamp and signature. Assures execution of and assisted with quality control activities for architectural elements on a project. Projects assisted were Kukio Bay (Island of Hawaii), Hale Koa Luau Pavilion (Waikiki), Ka’anapali Ocean Resort (Island of Maui) Kauai Police Station (Island of Kauai) and Central Union Church (Honolulu). CAD Manager / Structural AutoCAD Support Nov 1998 – Dec 1999 NTW & Associates (Structural Engineers) Honolulu, Hawaii Assisted engineers with layout of beams, girders and rafters. Drew section cuts through the building that was to be included into the construction documents per Project Engineer's instructions. Distributed CAD assignments to Staff Draftsman. Created CAD standards and Detail Library for the firm. Organized and created drawing file management for engineers. Networked all office computers and printers to a single server where files can be accessed. Gave direct input to what computer hardware and software to purchase. Upgraded the AutoCAD system to coordinate with Architect and other engineering consultants. Maintained, organized and archives all project related documents. Assures execution of and assists with quality control activities for architectural elements on a project. Projects assisted were St. Ann’s Parish

(roof redesign), Waipahu Gymnasium, Sand Island Wastewater Treatment Plan and Nichiren Church. PROFESSIONAL AFFILIATES

Construction Specifications Institute (CSI)

North American AutoCAD Users Group (NAAUG)

AutoCAD Users Group International (AUGI)

Hawaii Revit Users Group

Toastmasters International

EDUCATION

University of Hawai’i – Leeward Community College

Associate of Arts

Associate of Science – Drafting Technology

University of Hawai’i – Manoa Campus, Architecture and Engineering Beppu University, Beppu City, Oita Prefecture, Japan University of Hawai’i – Kapiolani Community College Certificate of Completion AutoCAD Level 1

Certificate of Completion AutoCAD Level 2

Certificate of Completion AutoCAD Level 3

Construction Specifications Institute - Contract Documents Technology (CDT), 2007 University of Hawai’i – Manoa Campus -- Certificate of Completion Adobe InDesign C5.5, 2011 PROJECT LIST:

2015 Ken Rubitsky and Associates

Various Correctional and Detention Facilities – AutoCAD 2008 Various Commercial Tenant Improvements – AutoCAD 200*-****-**** CGL Hunt Companies

Various Correctional and Detention Facilities – Revit Architecture 2014 Update Details Library – AutoCAD 2014

2013-2013 Anderson & Doig Structural Engineers

New Dillard Elementary School – Revit Structure 2013 San Joaquin General Hospital – Safe Travel Route – AutoCAD 2010 support

– Sterilization Building Improvements – AutoCAD 2010 support 2010-2012 Hawaiian Dredging Construction Company

Pre-Construction Division / Construction Management Services University of Hawai’i – Endmanson Hall Renovation – Estimating and Bid Coordination University of Hawai’i – New IT Center – Estimating (On-Screen Take Off Software) Downtown Condominium Project – Design input and Revit Architecture 2011 support Various Parking Structures – Revit Architecture 2011 support Joint Traffic Management Control Parking Structure – Design and Revit support Halekauwila Place – AutoCAD 2010 and Revit Architecture 2011 support Design and Plan Company’s New Heavy Equipment Yard – Revit Architecture 2011 2010-May 2010 Communication Consultant Services, Inc Various New Construction & Renovations of Telecommunications & Security Systems

– Draft, Design and Microstation / CAD support

Pearl Harbor & Hickam AFB

Kuhio Park Terrace (Multi-Family Residential)

Alii Place

Prince Jonah Kuhio Kalanianaole (PJKK) Federal Building Various DOE Schools – Enhanced Bell Systems

2008-2008 Graham Builders, Inc. – Design Build

Various Residential New Construction & Renovations

– Design, Revit and CAD support

2007 –2007 Philpotts & Associates, Inc. – Interior Design Royal Hawaiian Hotel – CAD support

Various Residential – CAD support

2005 –2007 Pacific Atelier International, Inc. - Architecture Kamehameha Schools Preschool Repairs – Design, Project and Construction Manager Kamehameha Schools Commercial Properties Repairs & Maintenance

– Design, Project and Construction Manager

Resort Air Honolulu Hangar Renovation – Design, Project and Construction Manager Dole Plantation Store Expansion & Farmer’s Market – CAD support and coordination AAA Hawaii Office Expansion – Design, Project and Construction Manager Geffen Residence – Revit support and coordination

PROJECT LIST Cont:

2002 –2005 Franklin Wong & Associates - Architecture Akahi Building Roof Repairs – Kamehameha Schools – CAD support Mokapu Elementary School – Repair & Maintenance – CAD support Kinau Hale – Vital Records Expansion – CAD support Kaneohe Elementary School – New Administration Building – CAD support ADA Site Improvements at Various DOE Schools – CAD support 1999 – 2002 Albert Chong & Associates – Electrical Engineers Kukio Bay – Island of Hawai’i – CAD support

Hale Koa Luau Pavilion – Waikiki – CAD support

Ka’anapali Ocean Resort – Maui – CAD support

Central Union Church – Honolulu – CAD support

Maui Ocean Resort – Maui – CAD support

Kauai Police Station – Kauai – CAD support

1998 - 1999 NTW & Associates, Inc. – Structural Engineers Create CAD standards and Details

St. Ann’s Parish – CAD support

Waipahu Gymnasium – CAD support

Sand Island Wastewater Treatment Plant – CAD support Nichiren Church – CAD support

Networked the office computers



Contact this candidate