Post Job Free

Resume

Sign in

Scheduling Engineer

Location:
McLean, VA
Salary:
100000
Posted:
September 04, 2015

Contact this candidate

Resume:

TAHIR KHATTAK

Project Controls Engineer/Construction Scheduler

Address: Falls Church, VA-22044

Phone (Mobile): 571-***-****

E-mail : acrjk2@r.postjobfree.com

LinkedIn : https://www.linkedin.com/pub/tahir-khattak/21/809/594

PERSONAL DETAILS

Working Exp. 7.5 Years

YOB : 1985

EDUCATION

Qualification

Institution

Year

Bachelor of Civil Engineering

(US BSc Engineering Equivalency)

NUST – Islamabad

(WES-New York)

2004-2008

2015

Planner / Scheduler

PLANNING

ENGINEER

PLANNING

ENGINEER

PROJECT

ENGINEER

(Planning)

CONSTRUCTION ENGINEER (CIVIL)

CIVIL SITE

ENGINEER

CONTRACK INTERNATIONAL INC. / WATTS CONSTRUCTORs LLC

McLean VA, USA – (Feb-15 till Present)

(www.contrackwatts.com)

Working in Contrack International head office in McLean. Contrack is a leading Contractor with EPC projects in USA, middle east and Asia. I am responsible to develop, coordinate and review Project Schedule for various design build construction Projects.

Main Responsibilities as Planner/Scheduler are;

Develop / Perform Time impact analysis (TIA) and develop the TIA package for approval.

Supports the development of baseline schedule / detailed build strategies and coordinate with site Schedulers. Submitting it to Government for approval and adjusting/coordinating Gov review comments.

Identifies, sequences, and links construction activities in accordance with

established build strategies and scheduling criteria.

Progresses schedule on a monthly basis, analyzes performance, conducts critical path analysis and participates in efforts to address deviations to baseline, as required.

Supports the development and maintenance of an integrated master

schedule by accurately entering data from a variety of sources.

Prints progress reports for programs that detail actual and projected cost and schedule performance, resource requirements and earned value.

Assists in the development of corrective action measures such as schedule revisions, manpower adjustments, fund allocations, and work requirements.

Creating and maintaining regular project status reports, baseline creation and maintenance, and metrics analysis/reporting.

Developing the Work Breakdown Structure (WBS), activity coding and resource definitions.

Loading resources, costs, and/or budgets and track schedule.

Identifying project schedule trends and perform analysis to mitigate delays and problems.

Experience with cost and resource loaded Critical Path Method (CPM) scheduled on large scale construction Projects utilizing Primavera P6 scheduling software.

PROGER SPA, ENGIEERING & MANAGEMENT (Italy) – Saudi Arabia (Jan-14- Dec-14)

(www.proger.it)

Worked in Proger Spa, Engineering & Management, as Site Planning Engineer from Jan 2014 till 15-Dec-2014 on the construction of King Abdullah Project – 3. KAP3 is the largest construction projects on the planet at this moment in time, with a budgeted cost of SR. 12 billion (3.2 billion Dollar). It contributes monumental development that spans the entire Kingdom of Saudi Arabia, encompassing in excess of 1.5M m2 and is spread across over 610 sites.

Proger SPA, born as a professional practice in 1951 and registered as a company in 1983, PROGER is today a leading, Italian and international engineering and management organization, with head office in Pescara, main operations offices in Milan and Rome, regional offices in Bucharest, Almaty and Abu Dhabi and associate offices in Beirut, Dakar, London, Sofia, Tripoli and Sydney.

Main Responsibilities as Planning Engineer are as under:

Support and assist in the planning & scheduling 610 projects which are part of the overall KAP3 program.

Preparing master schedule for construction, Design and procurement.

Review and prepare Schedule Baseline for the each Project packages in P6.

Monitor and update the schedule in P6.

Assign budge and resources to the time baseline schedule.

Assist in preparation of program master schedule and performs critical path analysis.

Assist in integrating project budget and schedule to support reporting.

Prepare schedule performance measurements reports, forecasts and studies.

Prepares project plan framework and detailed manpower utilization plan framework.

Assist in analyzing critical paths and restraints to determine effect of changes on the schedule and recommends workarounds to mitigate impacts.

Assist in preparing Risk and Issue logs

Assist in preparing Cash flow for overall Program.

Support the development of plans and recommendations for mitigation of impacts of schedule problems.

Assist in the preparation of the monthly progress report.

Assist in establishing and monitoring project controls KPI's.

Support the implementation of project policies and procedures.

Supports the Project Controls team in accomplishing project status review and performance control.

Follow-up with construction team for updates and issues.

Preparing letters to client and contractor.

ALBAYRAK CONSTRUCTION (TURKEY) - PAKISTAN

(www.albayrak.com.tr)

Worked in Albayrak Construction, as Planning Engineer from Jan 2013 till Jan 2014.

Project Executed is as under;

Construction of Metro Bus elevated bridge, Lahore

Albayrak Construction (Pakistan Branch), a part of the Albayrak Group of Turkey, was involved in the construction of about 2.1 km of the elevated portion from Qaddafi Stadium to Ichra on the Ferozepur Road. The construction work comprised installation of almost 216 Nos. cast-in-situ 2.0 meter and 1.2 m diameter and up to 53 meters deep piles. The elevated portion was supported on a total of 61 Nos. large size piers. Piers were located 31 meters, which was bridged by pre-stressed precast concrete girders, each weighing up to 50 tons. The deck slab which accommodates the bus track is 10 meters wide, and comprised of asphaltic concrete laid over concrete slab. There are two bus stations in the portion constructed by Albayrak Construction.

The work was completed at a cost of Rs. 2.2 billion. ($220 millions)

Main Responsibilities as Planning Engineer were as under:

Preparing and Updating Master schedule

Preparing reports

Projects Coordination and progress reporting

Estimation and Bid preparation

DOKA (AUSTRIA) KINGDOM OF BAHRAIN/SAUDI ARABIA

(www.doka.com)

Worked in DOKA Kingdom of Saudi Arabia / Bahrain, as Project Engineer From Jan, 2010 till November 2012.

Branch Experience

Worked in Jeddah and Dammam branch for technical support.

Main Responsibilities as Project Engineer are as under:

Planning and Design

Studying all Structural drawings of Project and calculating different loadings for different part of Project to plan and Design the most construction friendly, economical and safe design for complex structure using DOKA TIPOS special software for designing the DOKA formwork systems.

I have deep knowledge of designing all types of structures using different Doka products for structure like, High rise buildings, Bridges, Power & desalination plants, Elevated Towers, Storage Tanks, Industrial Projects (Refinery, Steel factory etc)

Construction Planning

Planning construction activities for contractors for more safe, speedy and economical construction.

Detail Design Drawings for Concrete Pouring

Designing formwork for client to erect at site the formwork using AutoCAD and showing different pouring steps to be concreted.

BOQ

Calculating and Preparing the accurate list of materials required for different structures and at different pouring steps to make it most economical and fast.

Site Inspection & Site Meetings

Presenting Doka formwork and its benefits & discussing all technical issues with client. Insuring the correct erection of formwork of complex structures before concreting.

Major Projects Executed

Holy Haram Expansion, Saudi Arabia, LAMAR Tower, Saudi Arabia

CMA, Saudi Arabia, Ras Al Zawr Power and Desalination Plant, Saudi Arabia

Holiday Inn, Bahrain, National Theatre, Bahrain, Sakoon Tower, Bahrain, Banader Hotel, Bahrain, Four Seasons Hotel, Bahrain

NATIONAL POWER CONSTRUCTION CORP LTD, SAUDI ARABIA

(www.npcc.com.pk)

I worked in NPCC, as Construction Engineer on 380kV OHTL Project in Saudi Arabia. The work was completed at a cost of SR. 272 million. ($73 million)

Main Responsibilities as Site Construction Engineer were as under:

Foundations Construction and Earth Works

1) Worked as Site Construction Engineer for the construction of different types Tower Foundations (apprx.300 Foundations)

i.e. Pad & Chimney, Rock Anchor & Augur Foundations.

2) Construction of Road (120km Sub-base level), Finger Roads and structure Pads using heavy construction equipment specially in hilly areas i.e. Drilling and Cold Blasting (4), Dozers (5), Excavators (35) & Shovel (6)

Planning Engineer

Making Construction Schedules for different activities to find the critical Path activities using Primavera 6.

DONGFANG ELECTRIC CORPORATION (CHINA), PAKISTAN

(www.dongfang.com.cn)

Worked with DEC at EPC construction of Jinnah Hydropower Project, Kalabagh as Civil Engineer. The Jinnah Hydropower Project is situated on the right bank of the Jinnah Barrage Which is about 5 km from Kalabagh. The work was completed at a cost of $200 million. Constructing Power house and Channels for Jinnah Hydropower. A Project of 4,000,000m3 Excavation, Filling and back filling 1,000,000 m3,220,000 m3Concreting and 15,000 tons reinforcement. Main responsibilities were

Construction Material Testing

Inspecting Testing of all the construction materials (Bulk Cement, Steel Reinforcement, Aggregates, Slag, and Concrete Admixture etc) delivered to site according to ACI/ASTM/BS.

Concrete work

Supervising Concreting at site about 10,000m3 per month and ensuring concrete quality at Concrete Batching Plant by DEC having a discharge rate of 3 m3 per mix.

Reinforcement and formwork

Making Bar bending Schedule and installing reinforced steel, formwork & its supports according to concrete lift drawings.

Planning Engineer

Making Construction Schedules for different activities to find the critical Path activities using Primavera 6.

PERSONAL SKILLS

Primavera6 R 8.3

Microsoft Project 2013

AutoCAD 2013

Microsoft Office (Word, Excel, PowerPoint, Visio)

TRAININGS

1)Project Management Professional from PMI USA, Lahore Chapter.

2)Engineering Project Management from University of Engineering and Technology-Lahore, Pakistan

3)Primavera 6 training by ICT, LAHORE & NPCC for Planning Project and different construction activities.

4)ETABS & SAFE training by Proger SPA, KSA.

5)AutoCAD training by DOKA for Planning and Drawing Layouts and formwork shop drawings.

6)Doka CAD & Piecelist Editor Training Formwork designing software

7)DOKA Formwork Basic Traing training by DOKA for different formwork design and erecting methods

8)Doka Knowledge Transfer

9)Topcon Complete Training for GPS Survey by TOPCON officials.

REFERENCES

Mahmoud Seddik (Sr. Planning Engineer)

Proger Spa - KSA

acrjk2@r.postjobfree.com Mob: +966-*********

Mr. Tadas Ciuckys (Technical Manager at Doka International)

acrjk2@r.postjobfree.com Mob:+65-94456040

Tariq Laghari, PMP, RMP (Risk Engineer)

Saipem KSA

acrjk2@r.postjobfree.com Mob: +966-*********



Contact this candidate