Post Job Free

Resume

Sign in

Mechanical Engineer Maintenance

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
80000/-
Posted:
September 04, 2015

Contact this candidate

Resume:

Babar Ali

(Mechanical Engineer)

Mailing Address: P/O Sabazkot, Teh: Pasrur, Distt: Sialkot, Pakistan Contact no: +923*********

E-mail: acrjb3@r.postjobfree.com

Career objective

Seeking a platform in your prestigious company to serve your company as a Mechanical Engineer and show and learn skills, experience by applying my theoretical knowledge to practical field in your organization Educational Achievements

2010-2014 University of Engineering and Technology, B.Sc Mechanical Engg 3.516 CGPA Lahore

2008-2010 Govt. Degree Collage Zafarwal, F.S.C 86 % Narowal

2006-2008 Govt. High School Khan Pur Syedan, Marticulation 89 % Sialkot

Internships/ Work Experience

Assistant Manager at LUCKY CEMENT LTD, DERA PEZU, Lakki Marwat (Oct 2014 to Present) Working in Planning and Maintenance Department

- Working on Civil & Mechanical Drawings for erection of WHR 5MW Project

- Worked on Waste Heat Recovery, AQC & SP Boilers, and Daily Routine Maintenance of Boilers, Pumps, Valves, Bearings (Friction & antifriction), etc.

- Worked on Plant Maintenance which includes Vertical Raw Mill, Impact type Hammer Crusher, Long belt conveyors, Stacker & Recalimer, Bucket elevator, Bearings, vertical Coal mill, Agitator Pfister, Bag house filter, Fan, Blower, Compressor, Gear Boxes, Roller press, Horizontal cement mill, Air slides, Heat Exchanger, etc.

- Reliability centered maintenance

- Pre and post shut down planning

- Continuous investigation into the causes for and remedies of emergency breakdown

- Worked on Inventory Control Management (Critical & Consumable Compounds) Implementation of SAP PM Module as an Assistant Power user

- Preparation of Process Flow chart and Process Documentation

- AS-IS Preparation

- Equipment Bill of Material (BOM)

- Measurement points and counters

- Task List preparation

- Build Standard operating Procedure(SOP)

Trainee Engineer at DARSON RUBBER INDUSTRY, WAZIRABAD (15th August to 4th October 2014)

- Worked on Manufacturing Process of hoses from Raw Material to Final Product Inspection

- Worked on Machines Maintenance, Daily problem reports of Machines & Production Processes, Radiator and Suction hoses on Extrusion machines, Molding Machine Parts, Knitting & Breading Machines, Heat Exchanger & Mechanical Chillers, Vulcanization of extruded pipes in the steam furnace for curing purpose, quality control & assurance

- Worked on MRP & ERP

Internship at MILLAT TRACTORS LIMITED (5th August to 7th September 2013)

- Worked & observed Machining operations like Facing, Turning& step turning, boring, Milling, Drilling, Reaming, Lapping, Honing, Threading, etc.

- Worked & observed of assembling of engine parts like Crank shaft, cam shaft, cylinder block & head, valves, connecting rod & piston, radiator hoses, crown wheel, suction & exhaust pipes, oil filters, testing of engines & checking their parameters, etc.

- Worked & observed of assembling of Tractors with all its accessories

- Worked on hardness test, material composition test for quality control & assurance

Internship at UET POWER HOUSE (1st September to 15th September 2012)

- Worked & observed working of gas engines (Otto Cycle & Diesel Cycle)

- Worked & observed main systems of Engine Air & Fuel system, ignition system, Cooling system and lubrication system)

- Worked & observed of daily maintenance work, problem reports, etc.

Internship at PAKISTAN RAILWAY WORKSHOPS LAHORE (25th June to 25th July 2012) Worked & observed roller bearing workshop, carriage workshop, power plant workshop, welding

& heat treatment workshop, machining operations workshops, spring manufacturing workshop, forging & casting workshop, boiler workshop, diesel engine workshop & engines, their parts, their manufacturing and maintenance, rehabilitation workshop, Motor rewinding workshop, etc. Projects

- Bill of Quantity ( Angle iron, channel, H & I beams, etc.) calculation from Civil & Mech. Drawings

- Calculation of efficiency of Combined Cycle Power Plant (Rankine & Bryaton Cycle)

- Study of Centrifugal Pumps (Introduction, types, NPSH, Cavitations, etc.)

- No energy resource individually can cope the energy demand in Pakistan

- Waste heat recovery in cement plants by using Steam Rankine cycle, Kalina cycle & Organic Rankine cycle, cycles efficiency, steam table, performance curves, etc.

- Efficiency of Otto, Diesel & Dual cycle, Hybrid Generators

- Fluidized bed combustion Technology for low grade coal combustion

- Determination of stresses and strains induced in the tank due to foundation settlement (FYP) Key Information

Computer and Software Skills

- MS Office

- Auto CAD (2D&3D)

- Solid edge (V20)

- MATLAB

- MRP, ERP, SAP

Core Values

- Strong communication and interpersonal skills

- Able to adapt in a quick manner as well as a fast-learner

- Mature personality, passionate, independent, and analytical

- Reliable, responsible, self-disciplined, and result-oriented

Achievements

- Academic 1st Position in High School& College

- Scholarships throughout my Educational Career

- PEEF Scholarship and Unique training in YDC Murree Punjab House (15th to 17th April 2011)

Hobbies

- Playing badminton, chess, reading historical novels & books and travelling

Languages

- Urdu, English, Punjabi

Reference

Reference will be furnished on demand



Contact this candidate