Post Job Free

Resume

Sign in

Project Manager

Location:
Illinois
Posted:
September 03, 2015

Contact this candidate

Resume:

Vijay Kumar Marupadi

*** ****** **** ******* ******* West, L5R3J1

Mississauga, Ontario

416-***-****

acri9o@r.postjobfree.com

PROJECT/PRODUCTION MANAGEMENT PROFESSIONAL

PROFILE

•Project Production Manager with 16 years of proven work experience in the field of Turnkey Fit Outs for Industrial, Commercial and Institutional projects.

•Process expertise in project management, production planning, client coordination, contractor/sub-contractor coordination and product design.

•Implementation of Six Sigma in Production by reducing the defects and eliminating the variations in the process.

•Monitored and improved the quality for both Project installation and Production on a daily basis, upgraded the existing systems by eliminating waste, speeding up the process and increased efficiency.

•Excellent technical proficiency, able to plan, construct and furnish interiors for high end yachts, palaces, high-rise residential, commercial (shopping malls/retail) and industrial buildings.

•Through Knowledge and experience of Interior industry includes tile, Corian, slab, plumbing, lighting, metal, glass, hardware and appliance selection and installations for High end projects.

•Ability to synchronize and multitask, deliver on-time and within budget constraints.

•Outstanding capability to work independently under pressure to meet deadlines and fulfilled customer expectations.

•Dedicated team player with excellent organizational skills, staff supervision, problem solving, interpersonal, negotiation and computer skills (AutoCAD, MS Excel, Word, Outlook, MS Project).

•Maintained safety as “Job One” with regular workshops, educated personnel to maintain it as part of life, integrated safety into projects and achieved overall success.

SAPBI/BW Consultant

Sapsol Technologies June 2015

Working on Project for SAP BI/BW Implementation where previous manufacturing and management experience used for developing Customized ERP systems as per company’s requirement.

PROFESSIONAL EXPERIENCE

Project Manager

Provincial Stores and Fixtures 2014-2015

Projects Completed: - Square One north expansion, Estee Lauder (Century 21, NYC), Apple Canada head office & Cisco corporate office.

Projects Coordinator

Provincial Stores and Fixtures 2013-2014

Projects Completed: - Public Areas for One Sherway Garden Condos for Menkes Development, Retail stores for Louis Vuiton, Estee Lauder (Boca Rotan & Chicago)

Projects Coordinated: - Mount Sinai Hospital Phase-3 & 4, Aga Khan Museum

•Managed all communication between project participants including G.C, Architects and Property owners.

•Developed Project plan, Production and Logistics schedule.

•Conducted site survey and took site measurements.

•Reviewed all Project sites, plans, ensured all Specifications and Regulations are followed, proper transfer of site information into production drawings and client approvals are in order.

•Generated Material requisitions with complete Material Take-offs in conjunction with the approved Engineering drawings and project Specifications (Boards, Veneer’s, Solids, P.lam, Hardware, Metal’s, Profiles, Solid surface and

Lighting fixtures)

•Organized and conducted Job meetings at regular Interval.

•Maintained all documentation i.e. Written communication, revision to design or contract.

•Worked closely with the Shop and the manufacturing process for all technical aspects, generated ship lists/maintained and changes to the schedule were adjusted.

•Maintained Project/Contract administration i.e., All Schedules, RFI’s, Site Instructions, Change orders etc.

•Supervised site installation Identified resource requirement and coordinate with Sub-contractors on a daily basis.

•Reviewed and approved invoices, Labor, project costs and expenses and generated work progress / financial reports to the management on a Weekly basis.

•Ensured documentation provided to Accounts dept. including change orders for monthly Invoicing.

•Ensured timely Project completion including deficiencies after generating punch lists, sign-offs from clients and submitted close-out documentation.

Project Manager 2008-2012

Golden Arrow Interiors (U.A.E)

Major projects: Al Ghurair City Expansion, Phase 2 – Shopping Mall, Rotana Rayhaan 5-Star Hotel & Public Areas (15million CAD); Emirates Airlines Dubai Rugby 7’s Stadium (6 million CAD)

•Prepared all project documentation, including but not limited to shop drawings, RFI’s, change orders, procurement schedules, monthly invoices, as-built drawings, inspection reports and approvals;

•Reviewed project plans/specifications, provided feedback on design, planning, risks and possible cost savings/value engineering;

•Closely monitored conditions of contract and claimed variations due to design and material changes.

•Reviewed and maintained construction drawings and schedules on a daily basis.

•Enforced good construction and quality standards (Municipality/Civil defense) involving a team of 400 workers while concurrently managing a 25,000 sq.m Shopping Mall and FF&E package for 428 hotel rooms and public areas;

•Coordinated and liaised among internal departments, consultants, clients, main contractors, preparing project deficiency lists.

•Achieved more than 30% profits on each and every project handled in the organization;

•Analyzed critical path and planned for manpower and material procurement from initial stage to completion of projects, as per priority and phases.

•Recorded and ensured submission of delay notices from various disciplines on monthly basis to claim an E.O.T with main contractor.

•Liaised with all the M.E.P works right from Design stage to Final installation involving I.D scope.

•FF&E products used for the above mentioned projects: Knoll, Thonet, Cassina, Hacker Kitchen, Holy Hunt, Senator, David Edward, Lily Jack, Grande Papilio, Hettich.

Production Manager 2004-2008

Pino Meroni Yacht Interiors, Part of (Depa Ltd, Global Interior Contracting Company)

Major Projects: Luxury Yachts from 11mtr to 58mtr; Terminal 3 Emirates Airlines, Conference Palace Hotel

•Constructed 10,000 sqm joinery factories from approvals phase to construction completion and set out of all modern facilities for Depa United Group. Rated one of the best operational factories in Dubai by clients.

•Planned and supervised production process from raw material to the final finishing stage. Initiated actions to prevent the occurrence of product or quality system non-conformance.

•Formulated practical designs, aesthetic and conducive to millwork production process. Conferred with technical department to determine factors affecting planning of interior environments such as budget, architectural preferences and purpose.

•Increased profits by 40% with effective planning/control and increased production turnover for typical yachts, booked for 3 years by reducing the administrative & factory over heads. Reduced external costs by setting up in-house Corian and marble units with modern machineries. Reduced 50% of production time for curved units by replacing manmade jigs with forming machines with Lean (Kaizen) manufacturing Concept.

Production Supervisor Millworks 2002-2004

Shamel Sarco (Muscat, Oman)

Major Projects: Qasr Al Alam Royal Palace; Barkha Palace; Chedi Muscat; Dubai Grand Hyatt Hotel

•Ensured all required procedures for quality assurance, inventory control and production control were rigorously enforced.

•Supervised workforce of 250 involving all disciplines to manufacture and furnish interior works for Royal Court of Diwan.

•Ensured employees were trained and followed all health, safety and environmental policies and procedures.

•Ensured all preventative maintenance was carried out on tools and equipment as per manufacturer recommendation and period.

•Supervised model/mock-up settings for palace works from design concept to actual installation at site, coordinating with external and internal clients.

•Set up a Glass Reinforced Gypsum (GRG) factory to undertake turnkey palace works for Royal Court of Diwan.

Floor Engineer 2000-2002

Gibca Furniture Industries

Trespa kitchens, lockers, cubicle, gazebos, benches/boards for schools/colleges, operable partitions

•Supervised 85 skilled and semi-skilled workers, allocated work and performed material planning on a daily basis.

•Supervised and monitored factory floor safety regulations and quality, weekly job planning and day-end reporting to general manager.

•Applied simple logistical solutions, decreased production time for Trespa (kitchen, lockers and cubicles) by using greater RPM cutting machines to stop various cleaning/sanding operations before assembly.

•Enforced all ISO 9001 procedures on factory floor and monitored on a daily basis.

•Identified and corrected any problems relating to product, process and quality systems.

Top Consultants Worked with

Getty’s, RTKL, McNally Design International, Ken Freivokh Design, Sam Sorgiovanni Design, Evan K Marshall, Royal Court of Diwan.

Top Products Worked with

Knoll, Thonet, Cassina, Hacker Kitchen, Holy Hunt, Senator, David Edward, Lily Jack, Grande Papilio, Hettich,

Valley Forge.

Education

Engineering Software Skills Enhancement program at Humber College 2013

(Revit, AutoCAD, Project Management, Safety standards, Solid works, MS Projects,

Ontario Building Code, MS Projects, Advanced Excel and Quality Concepts).

Bachelor of Mechanical Engineering 1996

Osmania University, Hyderabad, India

SAP BI/BW Implementation Certification May 2014



Contact this candidate