Post Job Free

Resume

Sign in

Project Management: Project Planner

Location:
Port Harcourt, Rivers, Nigeria
Posted:
September 01, 2015

Contact this candidate

Resume:

RESUME

NWACHKWU CHIBUIKE MARTINS

Contact: No *0 Omachi street, Eliowhani Port-Harcourt, Rivers

acrhm6@r.postjobfree.com

(+234) 080********

Objectives: To Strive for Excellence & Precision at all Times in all Positions & Circumstances, attaining Professional Distinction & Proficiency

PROFILE:

I have combined years of experience in Project management & planning as well in construction/Engrn.

Projects. I have been able to work with management teams, developing & executing plans for the

whole life cycle of projects. I have good communication and computer skills & I am proficient in Project

Management tools like primavera (P6), MS-Project, Excel, MS-Word & Auto-Card etc. I have partook in

Cost & schedule performance analysis using earned value management system. I have delivered on resources planning & control progress calculation & monitoring, determination of progress measurement methodology, man power histogram, weight ages calculation & progress S-curve preparation. I have equally been involved in developing look ahead & forecasting hours & costs, as well as project reporting and issuance of weekly & monthly progress reports to clients & management.

WORK HISTORY

August 2013 - DATE

Company: DOVER Engineering Limited

Position: Project Planning Engineer

Project 1: Front End Engineering Design of SDWPL Agbami FCV Minox

Client: Chevron

Project 2: Front End Engineering Design of SDWPL Agbami Cold Vent Compression Project

Client: Chevron

General Duties

Compiled Document Deliverable Register (DDR)

Prepared baseline schedule for the project

Prepared weekly forecast schedule while incorporating realistic dates

Prepared overall progress S-curve

Perform schedule analysis, propose corrective actions in case of a schedule slippage

Prepare and issue weekly and monthly progress reports to clients and management

Prepared project histograms (man hours and manpower)

Coordinate and participate in the regular schedule review meetings to review planning and progress related issues.

Developed a detailed Progress measurement system (PMS)

Monitor and track the progress of the project using the PMS

Participate in weekly progress review meeting with client

Prepare and submit monthly invoice schedule to client for approval

June 2011 -July 2013

Company: Manogrove Engineering & construction Ltd (Design, Build & Equip)

Mgbuoba Road Rivers State

Project: The Taraba State School of Nursery & Midwifery Complex (TSSNMC)

Client: Taraba State Government

Position: Planning/scheduling engineer

Duties:

Prepared a baseline schedule for the TSSNMC

Monitor progress, control package activities and provide management with float tracking reports.

Identify potential delays, analyze and issue proposed corrective actions as required.

Prepared and submitted daily, weekly and monthly progress reports to client and management.

Reviewed activity relationships periodically to accelerate timely completion of the project.

Co-ordinated schedule update with all project participants as par project responsibility matrix.

Create the project S-curve and manpower histogram.

Communicate an updated schedule with incorporated recovery measures to team members..

Prepared and submit a two-week look-ahead schedule to the client on a weekly basis.

Participated in the monthly progress review meeting with the ministry of works.

Coordinated with site team to check on progress and issues.

Used the Cost information to calculate schedule performance analysis and cost performance analysis

2009 -2010

Company: CASMAG Engineering and Construction Ltd

Project: Surface Water Tanks Fabrication

Client: Taraba State University Nigeria

Position: Administration/Planning Officer

Duties:

Definition of work tasks, estimation of the required resources and durations for individual tasks, the identification of any interactions among the different work tasks.

Preparation of baseline schedule with comprehensive WBS of the project

Set and monitor targets for the project team

Assisted with analysis of reports on Project progress

Preparation of monthly progress reports, look-ahead, bar charts, S-curve.

Preparation & presentation of project status reports for weekly internal review meeting,

Prepared and submitted weekly and monthly progress reports to client and management..

Cost loading based on daily rate & Estimation of resource requirement for activities

Preparation of Cost curve based on Cash flow (Cost control)

2007-2008

Company: Total Technology consultant Ltd (Project Mgt Consultant Co.)

Position: Refresher /Enhancement Trainee on Project management

Tasks: -Implementation of Primavera Project Management Solution

-Work with Project Team/clients to set up methodology in methodology management,

Structure projects and organizational breakdown structure as well as resources hierarchy.

2002

Company: National Electric Power Authority

Position: Trainee Engineer (NYSC)

Duties:

Inspection, Testing and metering of transformer, feeder pillars and panels

Design, planning & construction using working drawing

Working in the dispatch section to monitor and control the distribution of power supply in different parts of the city as well as gathering fault reports to execute correction.

EDUCATIONAL QUALIFICATIONS

Institution: University of Port Harcourt (In View)

Qualification: B. Eng Electrical

Date: 2014

Institution: The petroleum Training institute Effurun Delta State

Qualification: HND in Electrical/ Instrument Technology

Date: 2001

Institution: St Peter-Claver Seminary Okpala Imo State

Qualification: Senior Secondary School Certificate Examination

Date: 1991

Institution: Community Primary School, Umuhu Imo State

Qualification: First School leaving Certificate

Date: 1985

SPECIAL TRAININGS

-PMP Exam Preparatory Course (2014)

-Advanced Training on MS-Excel (2013)

-Nig Institute of safety professional (HSE LEVEL 3: 2005)

-Training on Primavera Software (2005)

-Training on Microsoft project (2005)

-Training on Ms-word, Excel, Power point, Auto-Cad (2004)

BIO DATA:

Date of Birth: Nov 10, 1975

Place of Birth: Imo State

Sex: Male

Nationality: Nigerian

Marital Status: Married



Contact this candidate