Post Job Free

Resume

Sign in

Engineer Project

Location:
Mumbai, MH, India
Posted:
August 27, 2015

Contact this candidate

Resume:

Curriculum Vitae

Navaneetha Krishnan.S

Menonpara (PO),chittur taluk

Palakkad (D.T),Kerala,

INDIA-678556

Email:- acrfjd@r.postjobfree.com

Phone: - +91-965******

POST APPLIED FOR: CONSTRUCTION ENGINEER(INSTRUMENTATION)

CARRIER OBJECTIVE

To work in a dynamic and challenging atmosphere where I can prove my mettle and make my work place the most happening one. Honest and hard working with flair research and exploring newer avenues in instrumentation technology.

CV OVER VIEW:

I am working in the field of instrumentation with 1 year and 7 months experience in process control Instrumentation Field. I have principally been involved in Instrumentation Construction Projects and Maintenance field of continuous Process plant. I have actively participated as key member in various projects and I am well conversant with projects life cycle from concept to commissioning.

EXPERINCE SUMMERY: 1 YEAR 7 MONTHS.

Erection and commissioning of Fire and gas detector.

Erection of instruments and valves.

Project execution comprising of Erection, installation, calibration, testing, loop checking and commissioning of process control instrumentation jobs.

Instrumentation maintenance jobs and projects jobs in refineries, petrochemical, and onshore.

DETAILE D SUMMARY OF EXEPERIENCE

M/S VERSAT TECHNICAL SERVICES

Company profile:

One of the leading contracting companies in India, doing construction jobs and maintenance jobs in various sectors viz. Oil and Gas, Refineries, petrochemical.

Period : APRIL 2014 to Present

Designation : Instrument Engineer

WORKED PROJECTS:

Erection of fire and gas detector in GAIL(GAS AUTHORITY OF INDIA) VIJAYPUR& HAZIRA

Worked erection and commissioning of INSTRUMENTS AND MOTOR OPERATED VALVE at ONGC,ANKLESHWAR.

Maintanance and calibration of field instruments at ONGC, CPF Ankleshwar.

Installation Of thermocouple in ONGC, CTF Ghandhar,GUJARAT

NATURE OF EXPERIENCE:

Develop Construction Execution Plans during engineering for each assigned project.

Facilitate and document Constructability Reviews with Engineering and Operations to optimize construction and help prevent field rework.

Provide review of construction cost estimates with respect to scope accuracy and level of effort, and monitor actual costs against the approved budget.

Provide input into the scheduling of projects to meet project milestones and maintain construction resources to acceptable levels.

Monitor progress of field activities to ensure scheduling milestones and critical path are understood and committed dates are being met.

Ensure good co-operation between the project organization, contractors, and Operations.

Coordinate with Operations and Project Engineer to ensure that proposed construction and work methods are clearly understood and accepted.

Coordinate between the construction contractor and the COMPANY Project Engineer to resolve field discrepancies in design packages and address material delays.

Ensure equipment and manpower resources are being used efficiently.

Network with various COMPANY departments and Project Engineer to ensure all appropriate permits and regulations are followed.

Proactively anticipate and resolve problems encountered in the field to prevent costly rework or re-testing.

Ensure all Process Safety management (PSM) and Management of Change (MOC) requirements regarding field design modifications and scope changes are met by forwarding appropriate documentation to the Project Engineer for processing.

Coordinate vendor representative schedules for on-site support during construction.

Ensure work is performed per the engineering work packages, specifications, and execution plans via coordination with the Quality Assurance (QA) and Functional Check-Out (FCO) groups.

Work with contractor and Operations to minimize interruptions/impacts to operation and production during installation and construction activities.

Support the Commissioning and Start-Up teams in the definition of the turnover systems for use in Mechanical Completion and System Handover according to Guidance on Certification (GOC) requirements.

Coordinate project turnover activities from construction to commissioning via interface with the Commissioning Coordinator and Quality Assurance.

Responsible for the planning and execution of the construction through Mechanical Completion and hand over to Commissioning, and post hand over completion of Incomplete Work List (IWL) items including start-up support as required.

Fabrication work, Laying of Ducts and Trays, Instrument Pneumatic Piping works

Cable Meggering and Cable Laying, glanding, dressing and Termination in marshalling panels.

Determines and secures necessary tools, material and equipment before starting any task.

Assists in the layout and documentation of new installation.

Experience in preparation/ review of all types of field instruments, material requisitions, cable schedule, instrument data sheets, Hook up diagrams, loop diagrams, P & ID’s, & As built drawings for instruments.

Well versed with panel wiring diagrams and able to read & interpret P&ID diagrams, cable schedules and other instrumentation logic diagrams.

Performed commissioning process such as Loop Test.

Commissioning and maintenance experience in Gas detection system

Calibration of SMART Transmitters with HART Protocol, DE Protocol such as Pressure, Flow, Level, Temperature Transmitters

Calibration of Pressure Flow, Level and Temperature Switches

Experience on Loop checking, Commissioning and trouble shooting of Process Instruments along with DCS Control system and Thought PLC system

Participated in EH&S promotional programs.

Calibration and Testing of Environment Gas Detectors such as LEL,H2S,O2,NH4

Calibration of Pressure, Flow and Temperature Gauges.

Knowledge in Installation of Control panels,JBs, DCS, PLC, System Panels etc.

Preparation of Specifications and DATA sheets to field instruments

Checking of Hydro testing of Impulse tube lines

Sound knowledge of programming & maintenance of PLC Make YOKOGAWA, Siemens S7-300, S7-400, including writing program in ladder, function block language for process control.

Establishing communication between PLC, HMI & SCADA using RS-232, Ethernet, and Modbus & Profibus protocol for real time monitoring of plant process.

Excellent trouble shooting, fault detecting and analytical skill

Reporting to Department Head

Provide guidance to instrument technicians to ensure that worked is carried out to client and statutory health & safety standards/procedures and the Permit to Work System, promoting safety and environmental awareness in all day to day activities

Find and remedy faults on Instruments and control panels

Assist Department Head/ Project Manager to maintain zero variance in Inventory

Provide technical support to instrumentation technicians

To carry out as a team, installation, commissioning and servicing of the production optimization products at onshore and offshore sites

Participate in site surveys

Ensure materials used are in accordance with specifications

Troubleshoots Control panels and all kinds of electrical and electronic circuits, makes recommendation and changes either software or hardware as required to project engineer.

Reads and interprets electrical schematics, diagrams, plans in preparation for and performance of tasks; also updates the drawing by making as-built copy

Determines and secures necessary tools, material and equipment before starting any task

Assists in the layout and documentation of new installation

Perform analysis and diagnosis to provide solutions to instrumentation problems

Follow appropriate safety procedures and permit to work system of the customer during work at site

Prepare site visit report, service report and daily progress report

Must understand and comply with all safety rules and company policies .

Work assignments carried out to the highest quality level.

Perform various other duties and activities as assigned by project engineer within the physical constraints of the job.

TEST EQUIPMENTS HANDLED

Dead weight Tester of range 1-600bar.Series yw1303 Make: Yantrika.

High range Pressure calibrator: Make-Druck

Hand communicator: Rosemount Hart 275,375,

Temperature Simulator : Make – Unomat

Temperature Baths : Make – Nagman series 600s and

Druck – DBC 650TS

mA Simulator : Make – Altek and Druck

Low Range pressure calibrator : Make – Druck, Nagman

EDUCATIONAL QUALIFICATION

Bachelors’ Degree (B.E.) in INSTRUMENTATION AND CONTROL ENGINEERING at Ratnavel Subramaniam Engineering College, Anna University, Chennai. Year: May 2010 to APRIL 2014

Overall Score: 75.65%. .

Standard XII: State Board, Palani Gounder HSS Coimbatore.

Percentage: 69.5%. Year of passing: 2010.

Standard X: State Board ST.MARTINS, Palakkad-678555. Percentage: 85.5%. Year of passing: 2008

TRAINING

Underwent four-weeks training at Yokogawa, Chennai for DCS, PLC&SCADA.

oCENTUM CS 3000,VP

oSTARDOM

oPROSAFE-RS

SOFTWARE KNOWLEDGE

Yokogawa scada stardom,cs3000,prosafe-rs, Allenbradley SLC 5/03,5/04 software, Siemens Simantic manager, Intouch SCADA software along with good exposure to C, C++, MS Office, Windows 8/7/XP/VISTA, LINUX.Visual Basics, and other Internet Applications.

Brief Description of Responsibilities handled:

Project Management:

Project Planning and Scheduling, Customer Relations, Contractors / vendors relation, Reporting, etc

Installation and Commissioning:

Activity Scheduling, Man and machine power scheduling, Supervision for calibration and Installation of Instruments, Cabling and termination, loop checking, Reports preparation, Power on checks, programming of equipment and Commissioning of the System

Leading a team consists of instrument Technicians, Instrument fitters & Electrician for installation & commissioning and maintenance of process control instrumentation field

PERSONAL DETAILS

Date of birth : 9TH Feb 1993

Father's Name : SADASIVAN.S

Nationality : Indian

Languages known : English, Malayalam, Tamil, Hindi

Permanent address : Navaneetha Krishnan.S

Near Hare Krishna Temple

Menonpara p. o.

Palakkad, Kerala

Pin :678556

Mobile No : +91-965*******

PASSPORT DETAILS:

Passport number : L993294

Date of issue : 09/07/2014

Date of expiry : 08/07/2024

Place of issue : Malapuram



Contact this candidate