Post Job Free

Resume

Sign in

Engineer Microsoft Office

Location:
Oman
Salary:
95000 UAE Dirhams
Posted:
August 23, 2015

Contact this candidate

Resume:

RESUME

VARGEESH.A.

Email Id : acrdam@r.postjobfree.com

Mobile No : +968-********

OBJECTIVE :

To Involve and contribute significantly to the growth of the organization in all aspects and by enhancing my technical expertise that helps organizational excellences and personal growth.

PROFESSIONAL & TECHNICAL QUALIFICATIONS :

Degree

Institute

University

Year of Passing

% of Marks

B.E. (Mechanical Engineering)

C.S.I. Institute of Technology, Nagercoil

Anna University Chennai –25

April 2005

First Class ( 71% )

D.M.E.

(Diploma in Mechanical Engineering)

Morning Star Polytechnic, Nagercoil

Tamil Nadu State Board

April 2000

First Class with Honours (76%)

Membership :

Graduate Institution of Engineers (G.I.E)

Institution of Engineers (India)

G.I.E. (Kolkata)

July 2006

GRADE :

G- 541307 - 5 G.I.E. (Kolkata)

ADDITIONAL QUALIFICATION :

ASNT – NDT – LEVEL –II

ULTRASONIC TESTING

MAGNETIC PARTICLE TESTING

RADIOGRAPHIC TESTING

LIQUID PENETRANT TESTING

CSWIP 3.1

Certification Scheme for Welding Inspection Personal 3.1,Certificate No-71089,Date of Expiry:30Aug2017

PROJECT WORK:

GEAR TYPE INJECTION MOULDING MACHINE.

Under the Valuable Guidance by Mr. S.Sajan Rajesh, M.Tech., Senior Lecturer.

PRESENTATION :

Developed a Hybrid programmable logic control platform for a Flexible Manufacturing System (FMS). In National Level Technical Symposium.

Venue : C.S.I. Institute of Technology, Thovalai, India.

COMPUTER PROFICIENCY :

AutoCAD 2000

Pro-E – 2000

Microsoft Office

TOTAL EXPERIENCE: 8+ years

EXPERIENCE DETAILS:

Supreme Excel NDT Services, Thuvakudi, Trichy. NDT INSPECTOR period from Aug 2005 to Feb 2010.

JOB RESPONSIBILITIES :

Inspection and monitoring of Non Destructive testing.

MPT, DPT,UT and Radiographic Testing in pipe lines, pressure Vessels,Structures,Coloumns,Tanks and Boilers including preparation of Isometric Drawing / Reporting.

Interpreting the Radiographic Films According to ASME ANSI B 31.3, 31.1,31.4 & 31.8 ASME Section V for Process Piping & Power piping of refinery Construction.

Witnessing Hardness test from third party & Subcontractor according to Specification.

Witnessing Magnetic Particle & Dye Penetrate test from Subcontractor.

Clearing the punch list item before Hydro Test

Witnessing Magnetic Particle & Dye Penetrate test

Witnessing Hardness test.

Witnessing the Hydro test as per the required pressure and duration

Witnessing the Hydro test of Valve and spools as per the requirement.

Witness/ Review of NDE Reports.

Witness of Hydrostatic & Pneumatic Testing, Reinstatement.

Post welding visual inspection and weld repair verification.

Boiler Drums, Safety valve nozzles, water wall panel, pipe ducts.

Door frames, Raw material plates, Rods, Andror Rings, Flanges.

Conical / Tubular / Polygon Towers, Shell to Flanges, R & D Jobs.

Lifting jigs, Steam Drums, Crane Beams, Crane supports.

TKY Joints, Elbows, Columns, Chemical Storage tanks.

Load Spreading plates, Shabows, Tungsten Penetrator Rods.

Heavy Pressure Steam lines,Steam Generators, Pressure vessels, Fuel and Oil lines.

Nasser Syed AL-Hajri Corporation, Kingdom of Saudi Arabia.

WELDING QA/QC Engineer,

From May 2010 to July 2013.

Working Saudi Aramco Total Oil Refining Petrochemical Company, Jubail Export Refinery project package-2B, Daelim, Saudi Arabia Company Ltd.

JOB RESPONSIBILITIES :

Preparation of raw materials for fabrication according to drawing requirements.

In process inspection of various components of pressure vessel, Structures, Pipes, Heat exchanger, Nuclear Reactor, Columns and beams.

Review of material documentation before welding.

Checking of procedure & performance qualification.

Inspection of daily welding activities Visual examination and surveillance etc.,

Ensuring the calibration of measuring instruments.

Inspection of incoming materials (As a material inspector)/Co-ordination with Client.

Preparations of weld map and weld summary list

Study of applicable drawings and specifications.

Review of Inspection Test Plan (ITP) and Implementation.

Inspection of material before fabrication Spools as per approved Drawing & Specification.

Witnessing Welding Procedure Qualification & Welder Qualification.

Review of the Welding Procedure Specification (WPS), WQT, Procedure Qualification Record (PQR) as per Specifications and standards for different materials

Equipment calibration records, Welding control Records, etc.

NDT coordination with Reviewing Test reports.

Studying the project materials sections and for production by required WPS with Relevant to sec. IX, API-1104, AWS D1.1and AWS D1.3 and ASME Sec V 31.1,31.3,31.4 & 31.8

For Executing the jobs referring with international Standards and Codes such as ASME, API, and AWS & ASNT Saudi Aramco.

Conversant with various welding process such as SMAW, GTAW, GMAW, FCAW and SAW.

Prepare Welding Inspection summary report.

Preparation of Mechanical completion Dossiers as per contract details.

Review the final QC Dossier/Inspection Records and handing over to client.

Currently Assigned with Mudhaher Establishment, Ruwi, Sultanate of Oman. WELDING QA/QC Engineer,

Period From Sep 2014 to till date.

JOB RESPONSIBILITIES :

Preparation of raw materials for fabrication according to drawing requirements.

Reviewing the approved WPS/PQR/WPQR for production weld.

Inspection of raw materials by conforming the mill test certificates.

Stage wise inspection activities on pipe fabrication and Erection activities by referring Isometric drawings and P and Ids.

Inspection and recording of welding parameters readings.

Studying the project materials sections and for production by required WPS with relevant to sec. IX, API-1104, AWS D1.1 and AWS D1.3 ASME 31.3, 31.1,31.4 & 31.8

Review of Inspection Test Plan (ITP) and implementation.

In process inspection of various components of Pressure vessel. Structures, pipes, Heat exchanger, Nuclear Reactor,Oil Tanks, Columns and beams.

Review of Material documentation before welding.

Checking of procedure & Performance qualification.

Inspection of daily welding activities Visual examination and Surveillance etc.,

Inspection of incoming materials (As a material inspector)/Co-ordination with Client.

Study of applicable drawings and specifications.

Issuance of non-conformance reports (NCR) and action for timely Closing.

Preparation of inspection reports, Test Packs & punch list.

Prepare welding inspection summary report.

Preparation of Mechanical completion Dossiers as per contract details.

Review the final QC Dossier/Inspection Records and handing over to Client.

PERSONAL DETAILS :

Name : VARGEESH.A

Father’s Name : Antony Pitchai.

Date of Birth : 28.09.1980

Sex : Male

Height : 168 CM, Weight: 76 Kgs.

Marital Status : Married

Religion : Christian

Nationality : Indian

Blood Group : B+

Eye Sight : Left: Normal, Right: Normal

Disabilities : NIL

Major Deceases : NIL

Languages Known : English, Tamil, Malayalam, Hindi and can understand Arabic.

Passport No. : G 2588108 Issued at Trichy.

Permanent Address : A.Vargeesh

13/156, R.C.Street,

Mylaudy,

Kanyakumari District,

Tamilnadu – 629 403.

Residence Phone : +914652 – 266587

Mobile Number : +968-********

Email ID : acrdam@r.postjobfree.com

Driving : Valid Indian license

Dear Sir,

I hereby declare that the above furnished information are true and correct to the best of my knowledge and belief.

Thanks and Regards.

VARGEESH.A.



Contact this candidate