Post Job Free

Resume

Sign in

Engineer Manager

Location:
United Arab Emirates
Posted:
August 20, 2015

Contact this candidate

Resume:

WASIULLAH ZEESHAN

AMTHEL-*, Muhaisnah-*, Dubai, UAE.

PAKISTANI, PP# AA5848413, DOB# 01-09-85

acrbuw@r.postjobfree.com

Contact UAE# 009**-**-*******

Contact PAK# 0092-333-***-****

Positions Interested in:-

QHSE, QAQC Engineer/Manager

QAQC Sr. Engineer/Manager (11 Years & 10 Months Experience)

I have experience in managing, supervising technical staff in carrying out testing & Inspection. Assembling staff of different disciplines and guiding the group to orchestrate, formulate and accede comprehensive quality procedures. Persuading reluctant staff to transmute their way of working to incorporate quality Policy, Objectives and methods. Formulate and manage the development and implementation of IMS, QMS, EMS, goals, objectives, policies, procedures and systems pertaining as per ISO. Setting Quality Assurance compliance objectives and ascertaining that targets are achieved by Auditing and monitoring. Considering the application of environmental and health and safety standards. Ambulate-down for inspection with civil defence personnel. Defining quality procedures in conjunction with operating staff. Establishing and maintaining controls and documentation procedures. Monitoring performance by amassing pertinent data and engendering statistical reports. Organize and manage quality assurance function in close cooperation with the staffs and with the Institution's Management team. Identifying germane quality cognate training needs and distributing training. Collating and analyzing performance data and charts against defined parameter. Well-versed in Codes and Standards: ASME, API, ASNT, ASTM, BS, PMP, CQM, Six Sigma and ISO.

Areas of expertise include:

Oil & Gas/Pipeline

Steel & pillow Tanks

IMS/EMS/QMS

Inter/Exter Audit

ISO Implementation

Policy/Procedure/Obj

HSE Management

MS Office / Adobe

Lead Teams

7 Quality Tools/RAMS

NDT (MT,PT,UT & RT)

Welding WPS/PQR/WPQR

Hydro/Pneumatic Testing

Mech/Civil/Painting Insp.

HVAC/MEP/EPC

CODES & STANDARDS

Vast knowledge and understanding of the below

ASME Section II Part – B, V, VIII & IX/(B-31.1, 31.3, 31.4, 31.8)/ (B-16.1, 16.5,16.47) (B-16.9, 16.28) (B-16.20, 16.21) (B-16.11) (B-16.10, 16.34) (B-36.10, 36.19)(B-16.25)

ISO 9001, 14001 & 18001

ARAMCO STANDARDS (SATIP, SATR, SAIC & SAES)

AWS D-1.1 & D-1.3,

WORK EXPERIENCE

JOB TITLE

from-to dates

Company name

COUNTRY

QHSE Manager

18 Oct 14 to 15 Aug 15

SAS FABRIC

U.A.E

QHSE Manager

05 Jan 14 to 18 Oct 14

Dynamic

U.A.E

QA-QC Manager

05 Jan 13 to 28 Dec 13

Engineering LLC.

QA/QC Sr. Engineer

22 Aug11 to 11 Sep 12

I.N.A.T

K.S.A

Senior Inspection Engineer

02 Jul 10 to 01 Aug 11

PROSPEROUS LINK

PAKISTAN

QC Engineer (Quality Control)

05 Jan 10 to 22 Jun 10

BOREN

K.S.A

Inspection Engineer

01 Aug 09 to 30 Dec 09

NDT & Welding Engineer

10 Sep 07 to 25 Jul 09

PROSPEROUS LINK

PAKISTAN

Welding Inspector

04 Aug 06 to 05 Sep 07

Instructor in Welding: (SMAW, TIG)

02 Mar 05 to 29 Jul 06

PITAC

PAKISTAN

Welding Supervisor

09 Nov 03 to 15 Nov 05

BURAK

PAKISTAN

QUALIFICATION

EDUCATION

Collage/Institution

Gr./Cr. #

YEAR

Masters in CPM

MSc in Construction Project Management

HERIOT WATT University

H00211464

2015

Project Management Professional

PMP

ASQ

Planned

---

Certified Manager of Quality – Organisational Excellence

CMQ/OE

ASQ

Planned

---

Engineering Diploma 3 Year:

Engineering in Welding Technology

DISWIS

83%

2003-2006

Engineering in Metallurgy

81%

2006-2009

Engineering Diploma 2 Year:

Engineering in Mechanical

P.I.M.S

A/79%

2009-2011

Engineering in Project Management

A/79%

2009-2011

Engineering Diploma 1 Year:

Engineering in Oil & Gas/Petroleum

P.I.M.S

A/76%

2009-2010

Engineering in Plant Planning

PROSPEROUS LINK

A/82%

2009-2010

Matriculation:

Matric (10th Grade in Science)

AIZAR School System

C/54%

2003

C.S.W.I.P (Welding Course):

C.S.W.I.P - 3.1

T.W.I-UK

57776

2011-2016

C.S.W.I.P - 3.2

64581

2012-2017

NEBOSH (Health, Safety & Environment):

NEBOSH IGC

SHEilds Ltd-UK

00223066

2014

Fire Warden Level 2

1447412

2014

International HSE Codes & Standards

British Safety Council

90%

2014

Coating/Painting Inspection Courses:

B.G.A.S-Grade- 3/2

T.W.I-UK

625486

2013

International Standard Organization

ISO-9001/2008

BLUETECH-KSA

Certified

2011

ISO-18001/2007

BLUETECH-KSA

Certified

2011

ISO-14001/2004

BLUETECH-KSA

Certified

2011

Welding Inspection Courses:

Senior C.W.I Level 3

PROSPEROUS LINK

A/92%

2010

C.W.I Level 2

A/86%

2007

C.W.I Level 1

A/88%

2007

N.D.T Inspection Courses:

M.T Level 1 & 2

A.S.N.T

030212

2012

P.T Level 1 & 2

040212

2012

R.T Level 1 & 2

020212

2012

U.T Level 1 & 2

010212

2012

M.P.T Level 1 & 2

PROSPEROUS LINK

051J080256

2007

L.P.T Level 1 & 2

051J080257

2007

R.T Level 1 & 2

051J080260

2007

U.T Level 1 & 2

051J080261

2007

Short Term Diploma 6 Months:

Diploma in AutoCAD

Line Studio

Certified

2011

Diploma in Building Construction

Certified

2011

Diploma in landscaping

Certified

2011

Diploma in Quantity Surveying

Certified

2011

Duties & Responsibilities:

Current Company: SAS FABRIC INDUSTRIES L.L.C

Position: QHSE MANAGER

Date: 18th October 2014 To 15th August 2015

Duties & Responsibilities (but not limited to)

Establish QAQC/HSE Policies, Objectives and Implementations of QME, HSE, EMS & IMS programs.

Analysis and approbate mandatory Procedures, QAQC/HSE Plan and Organization/Flow chart.

Recapitulation and acclaim annually documentation and make revisions if necessary.

Implementation of ISO 9001, 18001 & 14001. Prepare & Lead team for internal and external audits as per schedule.

Retrospect and esteem all quality records, reports and take actions as required.

Manage NDT, Welding, Painting and Mechanical Inspectors to ensure compliance to codes, standards, regulations, equipment specific specifications, and IMS requirements and oversee project overall quality.

Scrutiny and approve documentation of material traceability, ITP’s, PQR’s, WPS, Quality Manual, Hydro test packs, Pneumatic pressure test packs, Pressure pipe cleaning, Hot Tapping Procedure, MTC’s and commissioning (Hand Over)

Reassessing and countenance of QAQC/HSE personnel certification requirements and continuing education/training needs also Welder’s Identification system and their weld history including repair rates and training.

Providing leadership, mentorship, and direction of all QAQC/HSE personnel. Taking full responsibility for hold-point releases once all IMS functions have been completed and the equipment is ready to go into the next work stage with HSE requirements met.

Survey and string along with all visual inspections & safety tours/surveys and NDE, including coordination with 3rd party, subcontractors and RT Crew.

Procession and admire HSE, QA-QC inspection, NDE, painting, welding and testing plans for new construction, repair work, and alterations.

Cinch Engineers/Inspectors are conducting all activities according to ITP’s

Weekly QAQC/HSE meeting to solve if there is any problem in upcoming inspection

Provide adequate guidance to Engineers/inspectors regarding Inspection, method statement, risk assessment and documentation.

Reviewing and approve quality plans, procedures & ITPs before proceeding to work.

Set out QAQC/HSE Kick off Meetings are Held for Each New Activity

Make sure first Item Inspection is performed, MTC’s and also In-house Inspection as well

Make certain Contractor/sub-contractors Comply with Schedule Attend Contractor Audits

Review punch lists, civil defence inspections/audit reports and checklist

Abetment in System Walk Down for acceptance of Inspections, Check work in field

Assist with providing corrective action for Items not accepted

Implementation of (N.E.W.S.) and Ensure (DWRs) are Submitted by Contractor/Sub- Contractor

Duties & Responsibilities:

Current Company: DYNAMIC INDUSTRIAL ENGINEERING L.L.C

Position: QA-QC, QHSE MANAGER

Date: 5th January 2013 To 15th October 2014

Duties & Responsibilities (but not limited to)

Develop corporate & Quality Policies, Objectives and Implementations of QMS, EMS & IMS programs throughout the company.

Develop of mandatory Procedures, Quality Plan and Organization chart of company.

Review annually documentation and make revisions if necessary.

Monitor and Supervise Quality Audits internal and external as per Audit schedule.

Maintaining all quality records, reports and certificates.

Manage and oversee project QA-QC Inspectors to ensure compliance to codes, standards, regulations, equipment specific specifications, and QMS requirements.

Preparing and reviewing documentation of Material traceability, ITP’s, PQR’s, WPS, Quality Manual, Hydro test packs, Pneumatic pressure test packs, Pressure pipe cleaning, Hot Tapping Procedure, MTC’s and commissioning (Hand Over)

Identifying and developing QA-QC personnel certification requirements and continuing education/training needs also Welder’s Identification system and their weld history including repair rates.

Providing leadership, mentorship, and direction of all QA-QC personnel. Taking full responsibility for hold-point releases once all QMS functions have been completed and the equipment is ready to go into the next work stage with HSE requirements met.

Oversee monitoring of all visual inspections & safety tours/surveys and NDE, including coordination with 3rd party subcontractors and RT Crew.

Managing QA-QC inspection, NDE, painting, welding and testing plans for new construction, repair work, and alterations.

Ensure Inspectors are conducting all activities according to ITP’s

Weekly quality meeting to solve if there is any problem in upcoming inspection

Provide adequate guidance to inspectors regarding Inspection and documentation.

Ensure all quality plans, procedures & ITPs are Code 1 before proceeding to work.

Ensure Quality Kick off Meetings are Held for Each New Activity

Ensure First Item Inspection is performed, MTC’s and also In-house Inspection as well

Ensure Contractors Comply with Schedule Attend Contractor Audits

Review Punch Lists

Assist in System Walk downs for Acceptance Inspections, Check Work in Field

Review Daily Surveillance Reports (SR)

Provide Direction as to Acceptability of Items Inspected, as needed

Assist with Providing Corrective Action for SR Items Not Accepted

Supervise Implementation of Non-destructive Examination and Welding System (N.E.W.S.) Ensure Daily Welding Reports (DWRs) are Submitted by Contractor

Ensure Welds from DWRs are Input into N.E.W.S. Daily (No Backlog)

Ensure NDE Selection Sheets are transmitted to Contractors on a Timely Basis

Ensure Poorly Performing Welders are Immediately Identified and do not Weld until Re-trained / Re-qualified

Arrange weekly meetings with Inspectors, Support motivate Inspectors. Communicate with client/3rd party Inspectors

Ensure all Quality Control Work, Review WPS, PQR, MDR’s

Discuss daily routine problems with Inspectors

Welder qualification test according to Engineering Standards

Material Inspection and Material Test certificates (MTC) Verification, Visual inspection of fit-up & Welding Joints

EMAL PROJECT:

Receiving Material Inspection.

Inspect Material as per MTC’s/MTR

Ensure Third party Inspection on material is been carried out

Prepare PQP, QA Manual, RAMS and ITPs

Check condition of electrodes (Baking/re-heating procedure of electrode)

Ensure all welding machines/electrode oven are calibrated

Line checking & as-built to compile with P&ID, Isometric drawing

Test Pack Review Inspection of welding profile, visual and defects.

Witnessing Hydro test

Pipeline, piping system and Gas Skid Installation

Ensure material is used as per engineering specification

Company: I.N.A.T

Position: QA-QC Engineer (Vendor/Mechanical)

Date: 22nd August 2011 to 11th September, 2012

Review Quality Plan, Edit in Organization chart if change or hire new employees.

Manage and coordinating with Inspectors and Engineering for the upcoming inspections on sites or in vendor premises.

Coordinating with the vendors and Clients for required documents in regards with inspection.

Reporting to Senior Manager Bi weekly Inspection logs and reports.

Ensuring all inspection are been carried out according to ITP’s

Preparation of ITP’s and Quality Procedures and get review/approval from client and senior management.

Follow ISO Quality management System and ensure is been implemented throughout organization.

Keeping full records of all Quality related documents.

Arranging Quality meeting on daily basis with Inspectors to get the report for each day.

ARAMCO PROJECT:

Check PWHT of Material before welding.

Inspect Root gap and bevel angle

Ensure external clamp is removed after 50% completion of root pass

Ensure safety accordingly as mentioned in standard.

Check condition of electrodes (Baking/re-heating procedure of electrode)

Ensure all welding machines/electrode oven are calibrated

Line checking & as-built to compile with P&ID, Isometric drawing

Test Pack Review Inspection of welding profile, visual and defects.

Witnessing Hydro test

Incoming material Inspection

JGC PROJECT:

Arrange weekly meetings with Inspectors

Communicate with client/3rd party Inspectors

Ensure all Quality Control Work

Review WPS, PQR, MDR’s

Support motivate Inspectors

Discuss daily routine problems with Inspectors

Welder qualification test according to ASME Sec IX

Material Inspection and Material Test certificates (MTC) Verification

Visual inspection of fit-up & Welding Joints

Preparation of welding procedure specification’s (WPS), Conducting Procedure Qualification Record’s (PQR)

Company: PROSPEROUSLINK

Position: Senior QA-QC Engineer

Date: 2nd July 2010 to 1st August, 2011

Provide Welding Quality and Training advising expertise to technical directors.

Interviewing and reviewing Instructors qualification and ability to train welders and Welding Inspectors.

Providing inspection/Welding consultation to clients to qualify welders for ongoing projects.

Coordinate with the technical Crew and Clients for NDT Inspection and Qualification for welders on site and/or in PROSPEROUSLINK premises.

Company: BOREN

Position: QC Engineer

Date: 5th Jan 2010 to 22nd June 2010

Site visual inspection on daily basis.

Train welding for procedure qualification, qualifying welders for ongoing projects.

Report daily to Site chief of all welds been carried out per day, Attend meets and prepare for next day schedule

Carry out Inspection in fabrication yard for spools and elbows

In-process welding surveillance during welding to verify compliance with specified procedure including any preheats, inter pass temperature control and post heat requirements.

Welding procedures establishing that a procedure is available, has been approved as required by the appropriate authority and is being employed in production

Witnessing of welder and procedure approval tests

Witnessing the preparation of test pieces and destructive tests, and verifying compliance with appropriate standards and specifications Welder approvals, verification that adequate and valid welder approvals are available, and that only approved welder as required are used in production.

Post weld heat treatment verification that post weld heat treatment has been conducted in accordance with specification requirements

Company: PROPEROUSLINK

Position: QC Inspection Engineer

Date: 1st August 2009 to 30th December 2009

Duties including NWI Engineer

Reports preparation of inspection reports

Elaborating and coordinating the welding specifications, and codes/standards

Coordination with the field subcontractors for all welding procedure specifications and procedures qualifications reports

Review course and effects of welding defects and take remedial actions

Coordination with the field subcontractors and the Third Party NDT Inspection Company

Review of the radiographic film and all NDT reports on a daily basis

Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant, Magnetic Particle, and Ultrasonic inspections

witnessing of welder qualifications testing and procedures qualification testing

witnessing any remedial repair welding

reviewing of the welding summery reports

checking the hydrostatic test packages for NDT compliance prior to testing

advising the site subcontractors with regards to welding and testing

Company: PROPEROUSLINK

Position: NWI & Engineer

Date: 10th September 2007 to 25th July 2009

Duties including Welding Inspector

Monitor document control and apply guidance as required.

Awareness/Inspection intervention requirements of all ITP’s as defined

Maintain a quality surveillance role offshore.

Ensure that Materials, Welding, Inspection, and NDT are applied to the requirements of the contract.

Ensure that coatings preparation, application and inspection are applied to the requirements of the contract.

Raise NCR against Non-conforming products.

Perform NDT techniques.

Company: PROPEROUSLINK

Position: QC Welding Inspector

Date: 4th August 2006 to 5th September 2007

Monitor any Post Weld Heat Treatment on site and review the completed test reporting

Selection of welds for nondestructive testing

Recording and listing of defective welds

Monitor the control and issue of welding electrodes

Control the QC site welding inspectors

actively monitor site radiation safety

Review day to day applications for x-raying of welds

Coordinate the issue of nonconformance reports through the site QC manager

Compete site quality instructions to sub-contractors when require.

Company: PITAC

Position: Welding Instructor

Date: 2nd March 2005 to 29th July 2006

Instruct and Train welders for TIG and SMAW

Train Welding Techniques

Explain Welding defects and their control

Type of defect as per welding process

Explaining Electrode coding E-7018 and TIG wires

Instructing the preparation of bevel angle

Up and down in current and Voltage

6G position and other F and G (Fillet and Groove) Position

Welder card and expiration according to code

Explaining WPS, PQR and WPQR

Company: BURAK

Position: Welding Supervisor

Date: 9th November 2003 to 15th November 2005

Technical control of buildings with the welding requirements

Welding wire preparation, including the handling of the work-piece before and after welding

The design and control of welding instructions

Supervising the work of the welder

Training and preparation for the exam

Controlling the welding certificate validity

Controlling the safety measures.

Organizing the required exams of welding methods for the welders

Control of the welding machines and their maintenance

Supervision and Examination before and after welding and regulatory measures

OTHER PROJECTS

1.Inspection of Elbows (Bevel angle, Root face and Flat ~ Straightness of face) OD 44’’ and 48’’ in TECKNOSAN Workshop, AD DARAB, SAUDI ARABIA.

2.Trained Fifteen (15) Engineers of F.F.C (Fuji Fertilizer Company) in Welding and NDT Inspection Courses, Goth Mache, SINDH, PAKISTAN.

3.QC/NDT & Welding Inspection services on demand to EXPO LAHORE, Lahore, and PANJAB, PAKISTAN. Inspected welds and materials quality

4.Instructing Inspection and Welding Courses in UET (University of Engineering Technology), Lahore, PANJAB, PAKISTAN.

5.Trained Thirteen (13) Multiple Welders in MEDCON Company Lahore, PANJAB, PAKISTAN.

6.For 3 days supervised a Saudi Pipe line Welder’s Qualification Dedication in Pak over Seas, Lahore, and PANJAB, PAKISTAN.



Contact this candidate