Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Parañaque, NCR, Philippines
Posted:
October 13, 2015

Contact this candidate

Resume:

ARSENIO T. CARAMBAS JR.

Mechanical Engineer

License # 0065882

http://www.prc.gov.ph/services/?id=16

email add: acr2i0@r.postjobfree.com

mobile phone # +639*********

SUMMARY:

Profile: Male, 34, Married

Nationality: Filipino

Current Location: Philippines

Current position: HVAC Engineer/ QC

Company: Samsung Saudi Arabia

Preferred Location: Middle East, Southeast Asia, Philippines

Salary expectation: Not Specified / Negotiable

Experience in the field of inspection testing and commission of HVAC system in Petrochemical/Oil & Gas/Refinery plant Construction Projects.

Have Knowledge of HVAC codes & standards such as SMACNA, ASHRAE, UMC, AMCA, TAB, NFPA, ASME, ASTM, NEBB and UL etc.

Flexible in work both team environment and individual work assignments.

Saudi Aramco SAP No. : 70014820

WORK OF EXPERIENCE:

Jan 2014 up to May 2015 SAMSUNG Saudi Arabia SHAYBAH Inlet Facilities & Gas Treatment Project,

Saudi Arabia

HVAC Engineer / QC

This company is active in major Engineering Procurement Construction EPC in oil & Gas / petrochemical / Refinery plants Sector around the world.

Reporting to 1 QC Supervisor, and client representative Saudi Aramco 1 PMT and 1 PID. And manage to coordinate to 1 Construction Supervisor, 1 HVAC Technician and 1 QC HVAC construction inspector. I am responsible for:

The quality of HVAC equipment, materials, instrument and control with conformance for international standard (ASHRAE, SMACNA, NFPA90A, UMC,NEC).

Implement the quality as per company installation procedures before and after installation of HVAC equipment & materials.

Surveillance of ongoing construction activities, testing and issue Non Conformance Report NCR that violates the standard installation procedure.

Coordinate to HVAC Construction supervisor and Technician prior for startup and commissioning of HVAC System.

Monitoring log documents for HVAC request for inspection RFI and review of method statement procedure of HVAC installation.

My main achievements in this job include:

Control the quality of installation, and finish the testing, commissioning of HVAC System ahead of time schedule.

Minimize standard violation to maintain the high score of Project quality index PQI.

Pro-actively address client complaints and diagnose faults if Technician is not available.

Client Satisfaction: HVAC System was Energized & Functioning without delay as per client schedule.

May 2012 up to Dec 2013 SAMSUNG Saudi Arabia Wasit Cogen &

Steam Generation,

Saudi Arabia

HVAC QA / QC

This company is active in major Engineering Procurement Construction EPC in oil & Gas / petrochemical / Refinery plants Sector around the world.

Reporting to 1 QC Supervisor, and client representative Saudi Aramco 1 PMT and 1 PID. And manage to coordinate to 1 Senior Construction HVAC Engineer, 2 HVAC Construction Supervisor and 1 QC HVAC construction inspector. I am responsible for:

The quality of HVAC equipment & materials with conformance for international standard (ASHRAE, SMACNA, NFPA90A, UMC).

Prepare surveillance report during erection & installation.

Testing & Pressure Test of Refrigerant pipe.

Coordinate to Construction Engineer if found some correction in design drawing and modify as per site condition.

Monitoring log documents for HVAC request for inspection RFI and review of method statement procedure of HVAC installation.

My main achievements in this job include:

Minimize Log Book Entry of Saudi Aramco Project inspection division PID

Minimize standard violation to maintain the high score of Project quality index PQI.

Client Satisfaction: Achieved Zero unsolved Non Conformance Report NCR.

June 2011 to Apil 2012 Isam Kabbani Partners & co. Dhahran Bulk plant,

Saudi Arabia

QC HVAC / PLUMBING INSPECTOR

This company is active in oil & Gas / petrochemical Construction project all over Saudi Arabia.

Reporting to 1 QC Supervisor, and client representative Saudi Aramco 1 PMT and 1 PID. And manage to coordinate to 1 Senior Construction HVAC Engineer with 15 HVAC Construction personnel. I was responsible for:

Prepare Inspection Test Plan for HVAC / PLUMBING as per Issue for Construction drawing, Saudi Aramco Engineering Standard and scope of work.

Prepare method of statement for Hydro test Package

Prepare surveillance report during erection and installation and issue non conformance report to project inspection department.

Responsible for quality of materials, tested and UL listed before in used.

Site inspection of Piping system Potable and Fire water line, AHU unit, Fire Damper, ducting and other HVAC materials. Installed as per issued for construction drawing.

Monitor work in progress and coordinate Construction to maintain quality Plan.

Monitoring log documents for HVAC request for inspection RFI and review of method statement procedure of HVAC installation.

Main achievements:

Finish the installation of HVAC & Plumbing equipment & Materials without Non Conformance Report.

April 2010 to May 2011 E. Ganzon Incorporated, Philippines.

MECHANICAL ENGINEER

This company is active in High rise building / Hotel & Condominium Building Construction project all over Philippines.

Reporting to 1 MEP Manager, and coordinate to 1 HVAC engineer with 50 personnel. I was responsible for:

Assist the HVAC Engr. to Design of HVAC for residential and commercial Building.

Design of Fire protection Sprinkler System.

As-built drawing of Air conditioning and Sprinkler system.

Site inspection of mechanical drawing such as generator set, sprinkler system, Air condition unit and pumps as per actual installation.

Coordinate to purchasing dept. for the evaluation and billing of the materials.

Actual inspection of load testing of generator set as per required load of the company.

Main achievements:

Hand over the Pamulinawen Hotel Project to the client without delay by assisting MEP Manager with the technical work design and calculation as quickly and more accurate.

Feb. 2008 to Nov. 2009 DAEWOO E & C Qatar Chemical-II,

Ethylene Derivatives,

Complex Project

PIPING ENGINEER

This company is active in oil & Gas / petrochemical construction project around the world.

Reporting to 1 Piping Manager, 3 Piping Engineer and with 4 Piping Supervisor and Construction personnel. I was responsible for:

Modify and revise Isometric drawing using AutoCAD as per actual site installation.

Prepare technical submittals, progress report, and monthly installation report.

Provide and verify documents and calibration certificates of relief valves, pressure gages.

Check in line materials according to isometric drawings, operational requirements, and ease for maintenance and P & ID requirements.

Prepare site query as per site instruction.

Prepare method statement of pipe installation.

Conduct line checking to verify the missing parts and incorporate in punch list as per the requirements in the drawings P & ID and Isometric.

Reinstatement of piping installation by rectifying all punch list and coordinate closely with client inspectors.

Coordinates with other trades and subcontractors in order to meet the work program schedule.

Sep. 2006 to Nov. 2008 GAMA Al Moushegah Arabia Ltd. Hawiyah Gas

Plant Project,

Saudi Arabia

MECHANICAL ENGINEER

This company is active in oil & Gas / petrochemical Construction project all over Saudi Arabia.

Reporting to 1 Piping Manager, 1 Piping Engineer and with 2 Piping Supervisor. I was responsible for:

Analyze & interpret test information, material standard specifications, engineering standard drawings & testing procedures.

Interpret and mark-up engineering flow diagrams, isometric and as-built drawings.

Prepare material & fabrication reports and certificates.

Prepare piping inspection package prior to hydro, service, visual & pneumatic testing of newly fabricated and installed pipelines.

Prepare hydro test certifications and documentations.

Mark-up piping & instrument diagrams for proper identification.

Coordinate closely with QC/QA, construction and engineering department regarding preparation and revision EFD and P&ID as-built drawings.

Assist Technical engineer to estimate and prepare bill of materials base on isometric and specification for purchasing purposes

Prepare of weld mapping and spooling

Site inspection of piping and valve installation as per P & ID, Isometric drawing

Check and verify P & ID drawing, project specification,

And familiarization of construction details

Jan. 2006 to Sep. 2006 HVAC SYSTEMS EXPONENT, INC., Philippines

MECHANICAL ENGINEER

This company is active in High rise building / Hotel & Condominium Building Construction project all over Philippines.

Reporting to 1 Project Manager, 1 QC Mechanical Engineer and coordinate to construction engineer with 20 Construction personnel. I was responsible for:

Liaison with other contractors, designers and owner representatives

Prepare bill of materials

Prepare of work schedule

Site inspection of pipe works and sprinkler installation as per design drawing

Coordinate to project engineer and follow standard working procedures

Supervise the installation of AHU, HVAC ducts, pipes, fans and motors.

Supervise the installation of Fire Protection Equipment, Pipes, Valves, motors, and Sprinkler System.

Prepare Technical submittals, progress report, and monthly installation report.

Coordinates with other trades and subcontractors in order to meet the work program schedules

Aug. 2005 to Nov. 2005 Maneze Aire System and Services, Philippines

MECHANICAL ENGINEER

This company is active in High rise building / Hotel & Condominium Building Construction project all over Philippines.

Reporting to 1 Project Manager, and coordinate to Mechanical consultant and HVAC field Engineer with 15 personnel. I was responsible for:

Assist the internal Mechanical Consultant in engineering design of A/C and ventilation system and automatic fire sprinkler

Estimate and prepare bill of materials base on plans

Assist the field engineer for site inspection of pipe and ducting installed as per design drawing

Check maintenance and material cost for billing purposes

EDUCATION

June 2001 to April 2005 Palawan State University Philippines

B.S. Mechanical Engineering

TRAINING

June 15 to June 24 2015 MFI Foundation, Incorporated Philippines

Industrial Electrician

IT SKILLS

AutoCAD 2010,

Micro station,

Windows 2007, MS Office (Word, Excel, Power point and Database)

LANGUAGE

Tagalog Native

English



Contact this candidate