Post Job Free

Resume

Sign in

Architect

Location:
Parañaque, NCR, Philippines
Posted:
October 10, 2015

Contact this candidate

Resume:

Joseph Roy T. Cruz

Lot *, Blk **, Yakal St., St. Joseph 10,

Bo. Langgam, San Pedro, Laguna

Tel. nos. +63 2 8563223

Mobile no. +63-915*******

Email : acr1bx@r.postjobfree.com

acr1bx@r.postjobfree.com

QUALIFICATIONS:

1.Architectural, Interior and Landscape Design and Planning of any given project

2.Complete project and construction management from initial to client hand over.

3.Supervision and management of assign personnel for the project.

4.Working within the defined project scope and budget.

5.Conforms to High Quality and High Assurance of the Project Task.

6.Well verse in Computer aid design ( 2015 ) and Adobe Photoshop and 3D rendering

Companies Associated

1.TACS SYSTEM FORMWORKS SDN BHD September 2013 to August 31, 2015

Worked there As a Research and Development Engineer:

-The company is a pioneer and one of the leading aluminum formwork supplier and fabricator in Malaysia and Singapore with projects in Malaysia, Singapore, Thailand and the Philippines.

-Projects involved:

Cheng Yi – Mall project, Singapore

Sekyen 8 & 11 – Residential tower, Putrajaya, Malaysia

Prima Damansara Tower, Sungai Buloh, Malaysia

Bartley Ridge ( 5 towers ) – Residential Tower, Bartley, Singapore

Punggol East ( 4 towers ) – Residential Tower, Punggol East, Singapore

Surbana Towers ( 1 tower) – Residential Tower, Singapore

Tac System Formwork New factory – Design and Planning, Shal Alam.

Jobs Description:

Supervises Cad designers in the formulation of aluminum formwork design using Cad program and program in the design of formworks.

Coordinates with the Manufacturing department in the fabrication of the aluminum formworks.

Coordination with the client and various customers representative in their finishing design and to properly design the formworks base.

Sharing of updated design procedures with the other designers so that each difficult experience can be applied to succeeding projects.

Complete final modulation drawings of the formworks for submission to the factory and manufacturing department.

Computation of accessories to used in the installation of the formworks at site.

-

2.SPACE LOGIC (Cambodia) International. July 19, 2012 to October 15, 2012.

Worked there as The Project Manager for Construction

-The company’s main branch is Singapore and due to highly competitive business atmosphere in Cambodia set up to promote its brand of Interior design to the country.

2.1Camera Hub, Preah Monivong st., Phnom Penh, Kingdom of Cambodia – One project contract only.

2.2Quantity surveying for :

2.2.1Nikon Showroom – Russian Blvd. Phnom Penh.

2.2.2Vattanac bank, Monivong st., Phnom Penh.

2.2.3Maybank, Special Economic Zone, Phnom Penh

Job description:

Responsible for the Actual Construction Management of the Company's project.

Preparation of Timeline Construction schedule from Design Development to Final Client Hand over.

Approve and select qualified skilled construction personnel and subcontractors.

Prepares and approve construction limit cost, cost estimates.

Finalised and approves final design as per as built site conditions.

Coordination and client design presentation for clients approval.

Design and planning drawings preparations using autocadd and photoshop.

3.Living Spirit Interior Design, Doha, Qatar November 14, 2006 to May, 31,

2012

Worked there first as a Project Coordinator, Project Architect and Assistant Project Manager

-The company is involved in the highly competitive Interior Design Construction in Qatar.

Job Description:

Supervises and manage the whole construction phase of the project.

Coordination and referencing of every detail of the project with the owner and its representative.

Approves the most consistent and best manpower / specialized sub contractor for the project.

Makes detailed cost and material for each area of the project.

Securing the necessary licenses and permits for the construction of the project.

Initiates autocadd drawing as per as built site measurement and re draw the conceptual / design drawings using autocadd.

Prepares and submit to client detailed cost payables for company’s income.

Projects Involved:

1.Emir’s Beach Guest Palace, West Bay Area, Doha, Qatar.

2.Ibrahim Al asmakh Palace, Ain Khaled, Doha, Qatar

3.Renovation of M-Tower (25 storey residence, Barwa), Diplomatic area, West bay,

Dafna, Ad Doha, Qatar.

4.Renovation of All Dining Restaurant, Mezzanine floor, Grand Regency Doha Hotel, Al Sadd, Doha, Qatar.

5.Beach Guest Palace of Sheik Abdul Azziz Al Thani, Al Shamal Coast, Ruwais,

Qatar.

6. External and Interior Civil works for the Farm palace of Sheik Ahmad bin Jassim Palace, Umm Al Affai, Al Rayyan, Qatar

4.Goh Hock Guan International Architects, Pasay City and Kuala Lumpur, Malaysia. March 1993 to August 1996. – As an Architectural Designer

Job Description:

Draw and sketch conceptual architectural plans, elevation, perspective based on the ideas of the Director.

Supervises the construction of large scale models.

From the Period of 1996 up to 2006, I was involved in various Architectural projects on my Own, Planning, designing and client consultation for their residential and market projects.

I finished my B.S. Architecture at the University Of Tomas in 1991 and passed the Architect’s Licensure Board in 1996. I am a member if UAP Tandang Sora Chapter.

Here is a list of References that require for my background.

1.Mr. Louis Martinez

Project Manager – TAC SYSTEM Formworks SDN BHD

Mobile Number: +60 -111*******

2.Arch. Edward delos Santos

Mobile number: +63-917*******

Here also are government issued numbers

1.SS # : 33-1404451-3

2.TIN: 159-161-535

3.PRC ID #: 12687

4.Philippine Passport no. EC2698554 issued 11/2014 and will expire on 11/2019

5.Malaysian Tax Account Number : SG23028377020

I hereby declare that all information stated are true and correct.

Ar. Joseph Roy T. Cruz



Contact this candidate