Chico Graham
Address: ** *********** ********, ****** ** 6036
Mobile: 041*-***-*** Email: acr0oz@r.postjobfree.com
Highly Competent Performer ̴ Goal Orientated ̴ Hard Working ̴ Attention to Detail
objective
With over 5 years’ experience as an Advanced Rigger/Scaffolder/Dogman in the mining industry I would love to continue employment in the Construction and or Mining Industries either locally or FIFO.
Recently employed as an Advanced Rigger/Dogman at CB& I, Wheatstone, I seek to further utilize my specialised skills in the civil construction and mining industry.
Personal Attributes:
Good communication skills – communicates effectively to management and co-workers
Exceptional industry knowledge – understanding of mining/civil industry standards and culture, mines act and Australian standards.
Commitment to demonstrated safe work practices – demonstrates safe OH&S practices
Effective forward planning ability – a practical approach to problem solving
Shows appreciation for contributions and initiative – whilst striving to meet personal goals and objectives
Displays a calm and even temperament – despite high pressure situations
CONSTRUCTION & MAINTAINS EXPRERYANCE
LNG 5+YEARS (OFFSHORE ONSHORE)
IRON ORA 3+YEARS
SCAFFOLDING 7+YEARS & RIGGING DOGMAN 3+YEARS
tickets/certificates/qualifications
WA MC License
BOSIET IOPITO Approved Training Course)
High Risk License DG, RA,SA, C6, EWP
Blue card
M.S.I.C card
Working at Heights
Confined Space
Senior First Aid
Basic Fire Training
Certificate of Automotive Engineering (Level 4)
Mine Employees Health Surveillance Card
Haul Truck (HS) Competency Certificate
Excavator (LE) Competency Certificate
Woodside Offshore Induction
Wheatstone Induction - Wheatstone VOC Rigging/Scaffolding and C6 Crane
BHP Induction - WAIO Induction, Site Induction (Whaleback, Area C,Yandi, Eastern Ridge), V.O.C BHP Rigging & Scaffolding
RIO Tinto - Safe Working at Heights and GAP training
FMG Induction - V.O.C Dual Lifts
Roy Hill Induction-V.O.C
Employment History
DOGMAN/ADVANCED RIGGER FEB 2015 – MAY 2015
C B & I, Wheatstone, WA, LNG
The scope of work included the installation of new components, and installation of the associated electrical components and cable support networks.
Other major works undertaken on site included substation installation equipment, new VVF cells and associated HV switches and data fiber cabling.
Key Responsibilities:
Installation of GTG components (motors, fans, pumps, exhaust stacks, steel erection, general work equipment, EWP operations )
Deconstruction of pipe racks
Installation of slug catcher components (pipes, valves, steel erection, manifold parts installation, EWP operations)
All cranes from Franna Cranes,Crawler Cranes 200T-600T
Comply with site isolation and lockout procedures
Strict adherence to company OH&S policies and regulations
Key Achievements:
Identified and reported unsafe work practices to my supervisor
Successfully performed my work in a safe and confident manner
Demonstrated a positive and dependable attitude to my employer
DOGMAN/ADVANCED RIGGER SEP 2014 – FEB 2015
McConnell Dowell, Roy Hill Project, Port Hedland Jetty, WA
The scope of work at Roy Hill, Port Hedland Jetty was to construct a new jetty, conveyor and transfer station.
Key Responsibilities:
Preparation of lifting equipment for jetty
Lift and transport of Piles, Galleries, Road ways, Pre-cast, Head stocks
Piling, construction of Jetty, Temporary access-ways
Strict adherence to company OH&S policies and regulations
Franna Cranes, Hydraulic Cranes, Crawler Cranes, 20T,120T,275T,600T Cranes
Key Achievements:
Identified and reported unsafe work practices to my supervisor
Successfully performed my work in a safe and confident manner
Demonstrated a positive and dependable attitude to my employer
Pride in completion of the work
ADVANCED RIGGER JUN 2014 – SEP 2014
Mammoet Cranes, Sino Iron Ore Project, Cape Preston
Key Responsibilities:
All general lifts including : stillage, cages, generators, tools, compressors and steel
Dual crane lifts with a 250 ton and 300 ton hydraulic crane
Loading of Stator onto Self Propelled Modular Transporters (SPMTS)
Stator lift (123 ton per piece)
Mill frames (80 ton)
Stator installation with 600 and 250 ton Crawler Cranes
Removal of 100 plus ton concrete blocks using a 600 ton Crawler Crane
Set up super lift for 600 ton Crawler Crane
Assembly of cranes including a 600 ton and 2 x 250 ton Crawlers
Preparation of all JHA’s and permits
Strict adherence to company OH&S policies and regulations
Key Achievements:
Identified and reported unsafe work practices to my supervisor
Successfully performed my work in a safe and confident manner
Demonstrated a positive and dependable attitude to my employer
Pride in completion of the work
ADVANCED RIGGER/SCAFFOLDER OCT 2013 – APR 2014
Best JV Thiess, Wheatstone LNG Breakwater and MOF Project, WA
Key Responsibilities:
Rigging and scaffolding on barge West Sea 9
Preparation of lifting equipment for cranes Scaffolding JHA
Permits Working at heights and working over water
Worked with 250 ton crawler crane (West Sea 9)
200 and 280 ton crawler cranes 80 ton crane
Operating 25 and 55 ton cranes HC Truck driver
Strict adherence to company OH&S policies and regulations
Key Achievements:
Identified and reported unsafe work practices to my supervisor
Successfully performed my work in a safe and confident manner
Demonstrated a positive and dependable attitude to my employer
ADVANCED RIGGER/DOGMAN/SCAFFOLDER NOV 2010 – SEP 2013
SHUTDOWNS FOR:
Mammoet Cranes (BHP Maintenance Shutdowns Iron Ore, Oil and Gas)
Transfield Worley (North Rankin A Oil and Gas)
Lend lease (BHP Maintenance Shutdowns Iron Ore, Oil and Gas)
RIO TINTO (Tom Price Maintenance Shutdowns)
Key Responsibilities:
Prepare lifting equipment for the purpose of replacing machinery for shutdowns
Worked with: 20 – 450 ton cranes
Operating 20-25 ton Franna and 55 ton crane
Scaffolding - preparation and construction of scaffolds
Rigging – preparation of loads for general movement
Strict adherence to company OH&S policies and regulations
Key Achievements:
Identified and reported unsafe work practices to my supervisor
Successfully performed my work in a safe and confident manner
Demonstrated a positive and dependable attitude to my employer
ROAD TRAIN DRIVER JUL 2010 - NOV 2010
Awards Logistics, Perth, WA
HC TRUCK DRIVER JAN 2009 – JUL 2010
WA State-wide, Perth, WA
SCAFFOLDER
All Scaffolding (Tube & Clip) (Quick Stage) MAY1999-NOV 2005 City Construction/ Oil and Gas Refinery
referees
Danny Epiha Mechanical Superintendent
Thiess Best JV– 043*-***-***/08) 9214 4200/ (08) 9254 9475
Pat Walsh Supervisor Mammoet 043*-***-***
David McMeeken Supervisor Mammoet 045*-***-***
Malcolm Pirihi Superintendent CB&I 047*-******
Ivo Supervisor McConnell Dowell Roy Hill 041*-******