Post Job Free

Resume

Sign in

Maintenance Manager

Location:
United States
Posted:
October 09, 2015

Contact this candidate

Resume:

Vincent M. Gonzales

Rancho Cucamonga, CA *****

909-***-****

acr03o@r.postjobfree.com

OBJECTIVE

Highly motivated professional with many years’ experience, seeking a suitable Management position where I can apply and utilize my knowledge and successful experience.

CAREER PROFILE

Proven ability to; manage, lead and attain consistent results; excellent organizational, communication, and analytical skills. Dedicated, committed and willing to take on challenging roles. Poised and confident when dealing with individuals of all levels; dedicated to building a highly motivated team aware of their role in improving productivity and quality. Managed and supervised all aspects of production and facilities maintenance from 1-100 employees and a variety of outside contractors and vendors. Proficient in the use of Microsoft Windows XP, word/excel and email and Maxmo / MP-2 maintenance software.

EMPLOYMENT HISTORY

Managed budget & capital projects; developed project improvement for production and preventive maintenance; spare parts inventories and purchasing systems.

Identify problems with PLC (Allen Bradley, Omron, Semen, and Texas instrument)

Maximized production and maintenance efficiencies by reducing plant downtime and line improvement.

Responsible for all major electrical and equipment installations.

Responsible for energy efficiency programs to reduce operational costs.

Rebuild, repair and replacement of equipment parts and installation includes (8, 12, 16, 42, 96 ounces can line 24/30 pack line; natural gas ammonia compressor systems and aseptic packaging). I have experience with composite can, metal cans, and plastic bottle Sidel’s SBO -10, Sipa’s and Mag’s /PET performs Husky’s, Injection molding, EPS foam.

Developed Run and Process sheets for employees to use and standardize product runs.

Developed quick change steps to reduce length of mold changes.

Developed and implemented a custom training program for mold changes / process

Employees and mechanics.

Organized daily work schedules, set goals and expectations for all employees.

Experienced with welding stainless steel, arc, tig, gas, and mig.

Trained all employees on the use of TQM, ISO 9001, 5 S’ and Lean Manufacturing and the value of teamwork.

Work with Micro Amps, Millie Amps, 110, 240, 480 Volt system and high voltage.

Knowledge with government regulations code compliance including OSHA, EPA, FDA, AIB, GMP, AQMD, NEC and NFPA. Maintain compliance documentation as needed.

Manage all payroll functions; performance appraisals; sanitation, safety and employee morale.

Controlled finished goods inventory through cycle counts.

Organized production schedules for daily and weekly production needs.

Pacific Allied Products, Ltd. Kapolei, Hawaii

Co- Packaging/ EPS Division Manager 2010 to 2014

Plant Sq. Ft. 100,000

Direct Reports, 12 production operators, 4 QC techs, 3 supervisor, 3 lead man, 2 warehouse men, 5 maintenance technician.

Working with Computerized Maintenance Management System

Prepare, control, and administer plans, processes, and budgets relating to operational performance, cost efficiency, and reliability. Responsible for all maintenance activities associated with the operation of the plant both days to day and during outage period.

Set expectations, monitor, and evaluate performance of direct reports

Installed complete plastic bottle water filling line from the ground up. Project was 12.5 million dollars

AL MORRELL DEVELOPMENT (Oasis International Water) Baghdad, Iraq

Maintenance Manager/Plant Manager 2009- 2010

Plant Sq Ft, 100,000

Direct Reports, 4 Maintenance Technicians

Total of 1 Complete Production Line

Responsible for all bottle lines equipment, Blow Molders, Bottle Unscrambles, Rinses, Fillers, Cappers, Laser Printers, Packers, Case Wrappers, Palletizes, Stretch Wrappers, Fork Lifts, Cooling Towers, chillers, RO Units, and other bottles production equipment.

All Facility, Building, Generators, Vehicle’s, Trucks, Forklifts, Flatbeds, and Leaving arias.

Set expectations, monitor, and evaluate performance of direct reports.

Working with Computerized Maintenance Management System as INFOR

Prepare, control, and administer plans, processes, and budgets relating to operational performance, cost efficiency, and reliability. Responsible for all maintenance activities associated with the operation of the plant.

Proven leadership ability including development and education of others. Project management skills, demonstrated through successful completion of turbine overhaul, new construction or critical path outage projects. Direct the daily operations and maintenance activities to achieve high productivity & safe, reliable, environmentally compliant water bottles plant.

BERICAP NORTH AMERICA, Ontario, California

Maintenance Manager 2008 - 2009

Plastic Bottle Caps Manufacturer

Plant Sq. Ft. 150,000

Direct Reports, 1 lead man maintenance technician, 1 maintenance electrical technician, 1 maintenance PM technician, and 1 mold repair technician, 5 maintenance technicians, 1 maintenance clerk.

Responsible for cap line equipment, molding machines, conveyors, PSG slitters, Vision systems, case packers, laser printers, forklift, cooling towers, pumps, chillers, air compressors, air dryers and pallet jacks.

Working with computerized management system MP2.

Set expectations, monitored and evaluated performance of all direct reports.

Responsible for all maintenance activities associated with the plant operational performance, efficiencies and reliability.

Proven leadership ability including development and educations of others. Project management skills, demonstrated through successful new construction of new production lines.

Direct the daily operations and maintenance activities to achieve high productivity and safe, reliable, environmentally to compliment capping plant.

Pacific Allied Products, Ltd. Kapolei, Hawaii

Maintenance Manager (Multiple sites) 2006 - 2008

PET/EPS Manufacturing Facility / Warehouse

Plant Sq. Ft. 100,000

Direct Reports, 1 maintenance lead, six maintenance technicians, 1 facility technician, 1 maintenance PM technician.

Total of 12 production lines.

Responsible for all injection performs machines, conveyors, blow molding machines, molds, regrind machines, resin drying systems, EPS molding machines, boilers, chillers, air compressors / high pressure air compressor, air dryers and EPS expander machines.

Buildings and grounds

Set expectations, monitor and evaluate performance of direct reports.

Purchased / Set up computerized maintenance management system. Set up preventive maintenance checks for all machines throughout both plants.

Prepare, control and administrate plans, processes and budges relating to operational performance. Responsible for all maintenance activities associated with the operation of both plants on a daily basis.

Direct the daily operations and maintenance activities to achieve high productivity and safe, reliable, environmental compliant for both plants.

Cambro Manufacturing Company Huntington Beach California

2nd Shift Production Supervisor / Process / Mold Set Up Supervisor

Plastics Manufacturing / Warehouse 2005- 2006

Total Sq. Ft. 200,000

Direct Reports, 12 production operators, 2 molds set up technicians, 1 maintenance technician.

Total of 12 production lines

Responsible for production on all 12 lines and activities associated with operational of the night shift targets.

Proven leadership, ability including development of my team and their education of how to run the machines in a safe and reliable manner, and to achieve high productivity.

Carson Industries, La Verne, California

Maintenance Supervisor, Maintenance Manager, Process, Mold Set Up / Production Superintendent / Plant Manager 1997 - 2005

Plastics / Manufacturing / Warehouse

Total Sq. Ft. 150,000

Direct Reports, 1 maintenance lead, 8 maintenance technicians, 1 forklift technician, 4 mold set up technicians, 3 production supervisors, 3 QA technicians, 20 production operators, 1 production superintendent, 1 warehouse supervisor, 6 warehouse men, 1 QA manager, 1 HR representative, 2 production schedulers.

Responsible for all injection molding machines, chillers, cooling towers, air compressors, conveyors, air dryers, resin handling system, fork lifts, pallet jacks.

Responsible for all production targets and shipments for the plant.

Responsible for plant budget.

Purchased / Set up computerized maintenance management systems, MAXMO.

Set up preventive maintenance checks for all machines throughout the plant.

Responsible for all new machine installations from the testing process to the start up of production.

Organized daily worked schedules, set goals and expectations for all employees as well as direct reports.

Maintained compliance for environmental along with all necessary documentation.

EDUCATION

James Campbell High School, Ewa Beach, Hawaii

Ventura Junior College, Ventura, California

PROFESSIONAL DEVELOPMENT

Management Training - Time Management - Supervisor Leadership – Employees Coaching/Development Training – Disciplinary Action – Correcting Behavior - TQM – Lean Manufacturing (Six Sigma & 5 S) – PLC (Allen Bradley & Texas Instrument) – Refrigeration – Technical / Equipment Training: Can processing - Husky Training – Tera-Pak Training – Electrical Training – Mechanical training – Safety Instructor – Forklift Trainer – SCBA classes – 1st Aid / CPR Certified – Excellent communication skills at all level of employees



Contact this candidate