KULBIR SINGH, B.E. Civil

**** * **** **. #**, Alexandria, VA 22314:

acr02v@r.postjobfree.com; C: 301-***-****

● Seeking a long term association to execute large challenging projects, and excel in construction project management.

● Implement PMP principles & company policies (safety & quality) for on-time execution and enhance profits.

Position Applied: Project Manager Availabile: 1 week.

Previous Position: Project Manager Total Experience: 10 years

Education: B.E. Civil (1999-2003) National Institute of Technology - Surat, India. (http://www.svnit.ac.in)

Training:

● Construction Quality Management for Contractors (CQC) by USACE & NAVFAC.

● OSHA-30Hr. ● MDE - Green Card. ● Renovators Initial - EPA. Software

skills:

Primavera P6/e ● Timberline & Timberscan ● MS Office -Word, Excel, Project etc. Client summary in Washington DC, Maryland, Virginia & West Virginia.: US Government:

Projects Executed - Dept. of Veteran Affairs (VA), Dept. of State (DOS), GSA, Human Health Services (HHS), Dept. of Labor (DOL), US Army Ft. Meade, US National Guard, Arlington, Air National Guard, Baltimore.

Projects Bid – USACE, NASA, NIST & other US govt. agencies.

Institutional:

University of Maryland, Northern Virginia Community College (NOVA), PG County Public Schools & PG County Community college.

Residential: District of Columbia Housing Authority (DCHA). Work

Summary: June 2003 till December 2014.

Project Manager Environmental Design & Construction, LLC. (www.envdes.com) Apr’13 to Dec’14

● VAMC Research Building Expansion. ($8 Million)

Managed 65 sub-contractors & vendors for ground-up construction of 18,000 Sqft New Research Bldg for Dept. of Veterans Affairs in Washington DC.

● Cape St. Claire Road Widening & Water Transmission Main, Anne Arundel County, MD ($2.2 M). Install 12” 2330 LF waterline, 30 storm structures & 2000 LF Storm pipeline, Step pool and road work.

Responsibilities:

Initiate projects: Initiated meetings, coordinated with clients/A&E's (AECOM) and subs/vendors.

Procurement: Project buyouts including market research & negotiations to procure services & materials.

Issued sub-contracts, purchase orders, change orders etc., and maintain record.

Execution: Administer contract, correspond both written & verbal with all stakeholders.

Managed submittal process, CPM schedules, RFI, change orders, REA and claims.

Managed sub-contractors, performed site visits to track progress. Issued cure notices and termination letters.

Managed a thorough QA&QC process to meet or exceed client specifications. Hired third party inspectors for client satisfaction and reporting.

Reporting – Daily reports, project shut downs, machinery breakdowns, project delays and safety reports.

Invoices: Managed payment applications for client, sub-contractors & vendors.

Project closure: Initiated testing & approval process, walk through with factory reps & client, rectify punch list.

Managed O&M, warranties, as-built drawings, training and completion certificate process.

Training – Department of State, General Services Officer. Jan 2013 – April 2013 Independent Investor Oct 2011 - Dec 2012

CJW Contractors, Inc. (www.cjwcontractors.com) Sep 2009 to Sep 2011

● Design Build (D/B) GSA projects in Washington DC: A/V Auditorium, conference room, secured access controls, office spaces & Command centers. Passenger elevator at Central Heating Plant and frameless glass vestibule at Prettyman Courthouse. ($3.3 Million)

● D/B cafeteria and seating area at Army National Guard, VA ($3,317,295)

● D/B GRAB barriers installation & A/V upgrades at Gaffney Fitness Center, Ft. Meade, MD. ($1.5 Million)

● Projects at Army bases - Ft. Detrick, MD. ($207,000); Command Center - Baltimore Air National Guard, MD.

($73,000); Fall arrester system - Davison Airfield, Ft. Belvoir, VA. ($94,931)

● Renovate three houses for DCHA. ($331,857). Renovate Computer Center for Northern Virginia Community College Annandale campus, VA. ($100,000)

Estimation- Won bid to “Relocate automotive care facility at CFSI, Clarksburg, WV”. ($2.6 Million)

Senior Engineer, Contracts ITD Cementation India Ltd. (www.itdcem.co.in/) May 2008 – Apr 2009

● Administered contracts for highway projects NS34 &35 ($110 M).

● Claims management for KR2&3 National Highway projects - Registered & followed multiple claims worth $20 million for KR-2&3 projects ($70million). Corresponded with stakeholders and replied to defendant’s submission and maintained records.

Senior Engineer, QA&QC TÜV South Asia Private Ltd (www.tuv-sud.in) Apr 2006 – Sep 2007

New U.S. Consulate Compound, Mumbai – India. ($89 Million)

● Lead QA&QC team for monitoring, inspection, testing & reporting of all construction activities for the new U.S. Consulate Compound – 10 buildings. (Office building, warehouse, marine security guards quarters, Consulate Generals residence, commissary, CAC’s and utility building) in Mumbai, India.

● Continued site visits, meetings with client their sub-contractor and reporting on daily basis. Assistant Engineer M.S.R.D.C. (www.msrdc.org) Jan 2005 – April 2006

● Prepared estimates, RFQ/RFP documents. Published bid invitations. Performed bid evaluations and recorded contract awards.

● Administered contracts for the construction of nine bridges /overpasses in Mumbai city ($25 M).

● Prepared & published RFP documents for design build “Urbanization of Sion-Panvel highway ($500M)” and

“Modernization of 22 inter-state border check posts in the state of Maharashtra ($60M)”.

● Evaluated bids for the award of design-build contracts for Integrated Road Development Projects (IRDP) approx.

$43 million.

● Inspected vendor factories to approve materials, empanelled A&E’s, conducted site visits for reporting updates. Field Engineer Gammon India Ltd. (www.gammonindia.com) Apr 2004 – Sep 2004

● Design Build two natural draught cooling towers at units 5&6, Rajasthan Atomic Power Plant (RAPP).

● Executed blasting and excavation of 33,000 CM of hard rock in record time, raft foundation (dia.100m x 1.2m high), 57 raker columns, and peripheral pond wall 2.5m high for cooling tower CT5 at RAPP.

● Executed six elevated water reservoir (665,000 gallons each) in various stages in Kota, Rajasthan. Field Engineer Electrosteel Casting Ltd. (www.electrosteel.com) Jun 2003 – Apr 2004

● Executed water distribution & sewage collection network (23 miles, DI pipes max dia.500 mm & 17 miles, concrete pipes max dia.700 mm); a sewage pumping stations (dia.7.5mx13m high) in Surendranagar district, Gujarat ($5M).



Contact this candidate