Post Job Free

Resume

Sign in

Project Electrical

Location:
Abilene, TX
Salary:
24.00 / hr. +
Posted:
July 29, 2015

Contact this candidate

Resume:

DANIEL SANCHEZ

325-***-****

acqzqe@r.postjobfree.com

WORK EXPERIENCE

****-**** ****** ********* @Phillips 66 Sweeny, Texas TITLE:

Instrumentationand Electrical Turnover Coordinator DUTIES:

As an intregal part of the PROJECT CONTROLS teammy duties included project I&E design review, estimating, purchasing, construction management ofmultiple I&E projects, creation of work packages, labor and material trackingas well as reporting completion status at weekly administrativemeetings with owner representatives. PERSONNAL REFERRENCES:

Jared Ledlow 713-***-****

JohnnyMacvoy 817-***-****

RonaldHines 936-***-****

2014 - 2013MMR Constructors @Oneok

DUTIES:

Daily management of High Voltage installation of the Power Distribution Center in OSBL FractionationUnit. After new construction was completed asked to stay on as an Quality Control Inspector and assistwith turnover andcommissioning. PERSONNAL REFERRENCES:

Micheal Delgado. 225-***-****

David Sullivan. 979-***-****

John Sosa832-414-3827

2013 - 2014DWP Pipeline@Lyondell Bassell CVO

DUTIES:

I&E Superintendent responsible for the Site Improvement Projects at bothnorthand south plants. Day to day coordinationof I&E installation, associated documents and communicationswith plant personaland Quality Control department PERSONNAL REFERRENCES:

Justin Hinrich 832-***-****

Elroy Vanderpool 281-***-****

Llyod Specer 713-***-****

2012 - 2013 BAYER PURTURNAROUND BAYTOWN, TX WITH TURNER INDUSTRIES TITLE:

CONSTRUCTIONMANAGER/ PCTCOORDINATOR

DUTIES:

DAY TO DAY SUPERVISIONOF I/E SUBCONTRACTORS. I WORKEDDIRECTLYWITH /PLANNERS AND PLANT OPERATORSTO COORDINATE ALL ASPECTSOF I/E INSTALLATION, Q/C VERIFICATION AND FINAL COMMISIONINGIN AFAST PACED,DEADLINE DRIVEN AND SAFETY FOCUSED ENVOIRMENT.

PERSONNAL REFERRENCES:

HERIBERTOMEJIATEPCO 956-***-****

JOE ZEPPUHAR TURNER 225-***-****

NOELMUNIZ BAYER 281-***-****

2011 - 2012MOTIVA CEPTURNAROUND PORT AUTHOR, TX WITH S.E.T.X. AND AUSTIN INDUSTRIES TITLE:

I/E COORDINATOR (S.E.T.X.), LOCKOUT/TAGOUT AUTHORITY (AUSTIN), I/E FOREMAN (AUSTIN), I/ELEADMAN (AUSTIN)

DUTIES:

BEGAN PROJECT AS AN I/ELEADMAN AND QUICKLYWAS GIVEN A I/E FOREMAN POSITION.AFETER COMPLETIONOF THE CONSTRUCTION ASPECT OFTHE PROJECTWAS ASKED TO COORDINATE THE LOCKOUT/ TAGOUT PERMITS FORTHE STEAM BLOW INANOTHER UNIT. MY DUTIES INCLUDED IMPLEMENTATION OF SAFETY PROTOCOLS INENERGYISOLATION, DOCUMENTATIONOF ALL CREATED PREMITS AND TWICE DAILY ADMINERSTRATIONOF ROLLOVERMEETINGS. UPON COMPLETIONOF AUSTIN'S PARTICIPATIONOFTHE PROJECT I WAS ASKED TO STAY ONWITH S.E.T.X., AN INSTRUMENTATIONCONTRACTOR, AS AN I/E COORDINATOR. I WAS ASKED TO OVERSEE THE CONSTRUCTIONCOMPLETIONOF ALL ANALYZER SYSTEMS/BUILDINGS IN VPS5. I COORDINATED WITHALL TRADES, PLANT OPERATIONS, AND SEIMEN ANALYZER TECHINICIANS TO COMPLETE CONSTRUCTION, Q/C VERIFICATIONAND FINAL COMMISSIONING.

PERSONNAL REFERRENCES:

DARREN TAYLOR SEIMENS 281-***-****

MARK ROBERSONS.E.T.X. 205-***-****

JOSENIETO AUSTIN 832-***-****

2009 - 2011 TEXAS MEDICAL CENTER HOUSTON, TX WITH I.S.C. ENTERPRISE REFINERY MOUNT BELVUE, TX

SHELL PIPELINE COMPRESSORSTATIONMOUNT BELVUE, TX

TITLE: I/EFOREMAN

DUTIES:

T.M.C.

I WAS PLACED INCHARGE OF INSTALLING HIGH VOLTAGE SWITCHGEAR ONTHE OF ANEW BUILDING. THIS INCLUDED LOGISTICS AND STORAGEOF VALUEABLE EQUIPMENT AND HIGH VOTAGE WIRE. I SUPERVISED A TWENTY TWOMAN CREW. WEWERE RESPONDSIBLE FOR TRAY, CONDUIT, WIRE AND EQUPIMENT INSTALLATION. AS WELL AS WIRE TERMINATIONS, ELECTRICAL CHECKOUT, CLIENT INSPECTIONSAND COMMISSIONING OF THE HIGH VOLTAGE POWER DISTRIBUTIONSYSTEMS.

REFINERY

I BEGAN THIS PROJECT INTHE ELECTRICAL CHECKOUT, QUALITY INSPECTIONAND PHASE. I WORKEDIN ATEAM TO COMPLETE ALL COMMISSIONINGOF MOTORSTOMAKE A STARTUP DEADLINE.

SHELL PIPELINE

THIS WAS A SMALL HARD MONEY PROJECT. I HAD A TEAMOF THREE ELECTRICIANS AND ONE HELPER. WE INSTALLED PERIMETER ALARM BEACONS, HORNS AND UPGRADED A CAMERA SYSTEM. I COORDINATED WITH TRADES TO PREPARE TRENCHES AND SET MANY 35' POWER POLES.WE INSTALLED UNDERGROUND CONDUITS, PULLEDWIRE, INSTALLED EQUIPMENT, TERMINATEDWIRES AND TESTED. THIS PROJECTWAS COMPLETEDWELL UNDER BUDGET AND TIMEFRAME.

PERSONNAL REFERRENCES:

EDWINBARCERO I.S.C. 832-***-****

DOUGMANIGOLD I.S.C. 713-***-****

FRANK MARTINEZ I.S.C. 281-***-****

2007-2008 PEARLANDWATER TREATMENT PLANT PEARLAND, TX WITH K.S.T. TITLE: I/EFOREMAN

DUTIES:

THIS PROJECT CONSISTEDOF A LOT OF DUCTBANKS, STUB UP PLOTTING, HIGHVOLTAGE VAULTS, INSTALLATION OF STAINLESS STEEL EQUIPMENT, AND HIGH VOLTAGE SWITCHGEAR. I SAWTHIS PROJECT THROUGH FROMSTART TO COMPLETION.

PERSONNAL REFERRENCES:

VICTOR BEST K.S.T. 936-***-****

SAMGARCIAK.S.T. 832-***-****

1999-2007 INTERNATIONAL BROTHERHOODOF ELECTRICAL WORKERS I.B.E.W. LOCAL 1000. FRESNO, CALIFORNIA.

DURING THISPERIOD I WORKED FORVARIOUS CONTRCTORS INA WIDE RANGE OF CONSTRUCTION INSTALLATIONS. 1999-2003 I ATTENDED NIGHT CLASSES THREE NIGHTS A WEEK, WORKING60 TO 70HOURS A WEEK.I GAINED AN EXTENSIVE AMOUNT OF EXPERIENCE WORKINGALONG SIDEMASTER ELECTRICIANS, SENIOR TECHNICIANS AND QUALITY INSPECTORS. I WAS ABLE TO TRAVEL TOMANY DIFFERENT STATES AND METMANY DIFFERENTPEOPLE. MY TIME IN THE UNIONWAS A GREAT LEARNING EXPERIENCE. THE TRAINING AND EXPERIENCE GAINED WAS INMEASUREABLE.

EDUCATION:

TULARE UNION HIGH SCHOOL TULARE, CA

COLLEGE PREP DIPLOMA1996

TEXAS STATE TECHNICAL COLLEGE ABILENE, TX

EMT I/II PARAMEDIC1998

I.B.E.W. FRESNO, CA

INSTRUMENTATIONAND ELECTRICAL APPRENTICESHIP 2003

LEE COLLEGE BAYTOWN, TX

BUSINESS COMPUTER APPLICATIONS

PRIMAVERA 6 PROJECTSCHEDULING CERTIFICATION BAYTOWN, TX TEPCO INCORPORATED



Contact this candidate