Post Job Free

Resume

Sign in

Project Manager Electrical

Location:
Rayville, LA, 71269
Posted:
July 29, 2015

Contact this candidate

Resume:

Charles Cox

*** * * ***** ****

West Monroe, La. 71292

Phone: 318-***-**** or 318-***-****

E-mail: acqznq@r.postjobfree.com

EDUCATION:

Istrouma High School, Baton Rouge, La.; Jefferson Military College,

Washington, MS.; LSU Baton Rouge, La., Bachelor’s Degree for Electrical

Engineering and minor in Mechanical Engineering, interrupted by military

service (A.B.C. electrical schools) Special Forces - U.D.T. nine years

Honorable discharge. While in high school and college,

worked for parents electrical contracting business, wired housing and

commercial buildings also pumping stations, street and school lighting.

Served local contractors until entering armed services . Worked

for Montana-Dakota utilities as lineman and certified cable splicer, Mile

City, Montana. Took electrical contractors exam

license # 81 for Louisiana, retired license because of conflict of interest.

Received certificate as an instructor for electrical and instrumentation from

Bailey Institution, Lamar, TX, 1971, and OCHA Standard, taught night classes

On most of my jobs I have been Project Manager, QA-QC Engineer and or

Chief Inspector.

WORK HISTORY:

2014, August 11 - October 10, 2014

Magellan - Allen, Oklahoma, W-Grade Blending Project.

Installation of butane tanks, valves, instruments, structural, welding,

painting, civil, all piping, electrical and instrumentation.

Responsibilities: issue all permits for the construction. Sign off and except for

Magellan. Keep cost of materials and time sheets separate from contract portion

of this job. Excavation and trenching of all underground work, maintain job log

(purchase orders, delivery of all materials, etc.) Hydro-test verify and except,

electrical and instrumentation (fiber optic) check out and test with operation

through Tulsa. Also responsible for all permits as required for safety by

Magellan. Completed all testing as required by Magellan for certifications.

2014, April 15 - May 31, 2014

Electrical instrumentation of Flair Stack in Tulsa, Ok for Explorer

Tank Farm (inspections, only). Represented Explorer’s engineering

for complete installation of Flair Stack (piping, welding, painting and

structural).

2013-September - March 2014

Chief QA Engineer for CHS Terminal Project, Madison, WI. Responsibilities

for all civil, ENI, structural, welding, piping, building and mechanical. Interfacing

new construction with existing plant. All certified welders had to retest on job

site and witnessed by me. All prints from design engineering reviewed by me prior

to bid packages going out. All concrete poured had to be witnessed and tested by

me. Built and rebuilt compressor stations.

2000 - 2013 SELF EMPLOYED:

An appraiser for individuals, attorneys, court systems and insurance companies.

Katrina in 2005 in New Orleans, La., QC for FEMA, inspections for commercial

and residential also power distribution throughout South Louisiana including

damages to industrial sights, paper mills, oil & chemical and air handling products

2000-2004

IEC (Industrial Electrical Contractors and Engineers) Baton Rouge, La

One of the jobs for IEC was at Shell Norco Chemical Plant in Norco, La.

My responsibility was instillation of fiber optic systems. After the explosion

at Shell Norco, I made flow sheets, wiring diagrams, clean, repair and test all

instruments and electrical circuitry. Furnished prints to Shell as built.

1997 - 1999

Gulf Interstate Engineers in Houston, TX

My responsibilities upon arrival at job site for Chevron as QA were for all crafts,

including welding, piping, civil and electrical instrumentation. As other QA arrived,

I was responsible for all electrical instrumentation, start up and check out until

completion of project in 2000. Built compressor stations and air handling units.

Built substations for power to Chevron (Cedar Bayou Plant).

1992 - 1997 SELF EMPLOYED:

Contracted work as QA - QC. with Georgia Pacific paper mill, Port Hudson, La.

My responsibilities at GP were all electrical and instrumentations for two new

paper machines and all related equipment. In 1996-1997, started new contract

with River Bend Nuclear Power Plant at St. Francisville, La. My responsibilities

were QA - QC inspections, reactor and related electrical sand instrumentations

including control room. In 1992-1996, contracted with Teneco Pipeline in

Houston TX as QA-QC in North Louisiana and Alaska. Responsibilities were

inspections of electrical and flow meters and related equipment. Revised prints

as necessary for Teneco (as built).

1987-1992

Richardson Engineers in Houston, TX

Responsibilities were inspections of several pipelines, industrial sites, QA at

Exxon Chemical Plant at Texas City, TX.; QC for Mobil Chemical Plant at

Palestine, TX. Built several air handling and compressor stations.

1985-1987

Worked for IEC (Industrial Engineers and Contractors) .

Responsibilities were all electrical and instrumentations inspections,

check out and start at Texaco Plant.

1981-1985

Delta Electric in Baton Rouge, La.

Project manager for all maintenance and construction for industrial and

commercial projects.

1968-1981

Payne and Keller Engineers and Contractors in Houston, TX and Baton Rouge, La.

Responsibilities were all electrical and instrumentation for all of Joe Payne’s

companies. Became general manager Payne and Keller. Responsible for

contractors, construction and maintenance of all projects. Also, became VP

of Cardinal Engineers, one of Joe Payne’s firms. We specialized in engineering,

maintenance and construction of chemical plants and paper mills. My

responsibilities also ranged from contracts administration to procurement

as well as actual construction of all necessary instillation and maintenance.

To list a few, GP paper mill in Port Hudson, La. (built plant from ground up).

Big Three air handling unit in Norco, La. and Big Three plant in Plaqumine, La.

chemical Plant for Amrada Hess in St. Croix. This project was mine as project

manager. Too many projects to list for maintenance and construction, 20 plus

years with Payne and Keller until it was sold to a German firm in 1981. Built

compressor stations, air handling units, substations and all heavy industrial

projects as contracted by Payne-Keller Engineers and Contractors.

OTHER WORK HISTORY:

National Maintenance and Construction in Baton Rouge, La.

Responsibilities were start up and check out engineer at Georgia Pacific

Chemical Plant in Plaquemine, La. for all electrical and

instrumentation in phenol and caustic units. Built compressor stations in

Addis, La, substations for port of Port Allen, La., and Community Coffee.

Exxon Chemical in Baton Rouge, La.

Responsibilities were maintenance engineer for pipe stills 1 & 2, instillation

and up grade of piping and controls for all routine operations.

Kralor MFG. Company in Dallas, Tx.

Responsibilities were building an extruder instillation and project manager

of all automated equipment and related instruments.

R Jones Engineers and Construction, Dallas, TX. Responsible for government

projects as electrical superintendent for installation of power plant and

Substations.



Contact this candidate