LUIS GOMEZ
CIVIL ENGINEER
Msc. CONSTRUCTION MANAGEMENT
acqyfg@r.postjobfree.com
North Bethesda, MD
QUALIFICATIONS
More than 13 years of experience as an engineer, managing different projects most of them related to maintenance and construction of roads and bridges. For the past 4 years I’ve been working in the D.C. Metropolitan area in different projects, but mainly in the Dulles Corridor Metrorail Project.
EDUCATION
Construction Management Technology (August 2011- August 2012)
Northern Virginia Community College (NOVA)
Master in Construction Management (November 2003- May-2005)
Mexican Association of Construction Industry (CMIC), Queretaro, Mexico.
B.S. Civil Engineering 1998
Monterrey Institute of Technology and Higher Education (ITESM) Monterrey, México.
Language Proficiency:
Native: Spanish
Advance: English
Intermediate: French*
EXPERIENCE
Independence Excavating – Waldorf an Fort Meade MD
November 2014 – Present
Put Pipes, pour concrete, put fence, etc.
Engineer, Daniel G. Schuster – Rockville, MD and Alexandria, VA
June 2013 – September 2014
Do the layout and leveling for different buildings
Dulles Transit Partners (DTP) – Northern VA area, VA
Project: Construction of the Dulles Corridor Metrorail Project August 2010 – May 2013
Excellent knowledge of the tool room procedures and operations.
Supervise the working facilities and analyze the relevant issues
Analyze and interpret the blue prints and precision gauge.
Knowledge and proficiency in AutoCAD.
Manufacturing process and appropriate costs of project
Clark Concrete – Different locations in the DC Metropolitan area.
September 2009 – May 2010
Project: Construction of different buildings
Superintendent of Roads and Bridges Maintenance, ICA (Ingenieros Civiles Asociados) August 2008-January 2009
Guadalajara, Jalisco. Mexico.
Routine maintenance of the Highway from Guadalajara, Mex. Oversaw more than 25 employees.
Responsible for verifying the condition of more than 150 bridges and roads structures. Prepared the reports for each structure and programmed their reparation.
Site Construction Manager, Control and procedures in Ken Construction Group
January-August 2008
Queretaro, Qro. Mexico.
Construction of a Vehicle Distribution Center (VDC) for General Motors, in an area over 200 acres. This area was made of Pervious Concrete, with a capacity for 25,000 vehicles. Responsible for overseeing 5 subcontractors activities’ (Approx. total cost more than 6.9 millions US dollars)
Site Construction Manager – Canteras Peninsulares Group
May-November 2007
Yucatán, Mexico
Chief Resident of construction of roads in an enclosure in Caucel, Yucatan. Responsible for overseeing 2 subcontractors and 15 employees. (Total cost more than 1.3 million US dollars)
Resident of construction in the Yucalpeten Bridge, with a length over 600 meters mostly over sea. Responsible for verifying the topographic points and levels, pylons construction and collocation, as well as the supervision of the excavation for pylons. Oversaw 2 subcontractors and 30 employees. (Total cost more than 3.4 millions US dollars)
Superintendent of Projects, CEMEX (Cementos Mexicanos)
December 2006-February 2007
Cancun, Mexico.
Administrative control of the construction of a concrete platform, (Terminal 3 of the Cancun International Airport).
Handled and oversaw 1 subcontractor and 25 employees.
Urbanism Resident (EDITUR) of MAYAN GROUP
August-November 2006
Puerto Peñasco (Rocky Point), Sonora, Mexico.
Resident of construction of Central Park roads, main and secondary roads
Prepare the estimates of the construction of module III.
Site Construction Supervisor COYOCAP, (Road & Bridges maintenance and operation)
April – August 2006
Santa Rosa Jauregui, Qro. Mexico
Supervised of the construction of roads, bridges, and complementary structures in the road to avoid pass through the city Santa Rosa Jáuregui in Querétaro
Superintendent of Bridges of Delegation III Center-North, CAPUFE (FEDERAL ROADS AND BRIDGES)
July 2001- August 2005
Queretaro, Qro, Mexico.
In charge of the maintenance, reparation and construction for more than 700 structures divided in 9 highways in the states of Queretaro, Guanajuato, Mexico city, State of Mexico, Hidalgo, Jalisco, Aguascalientes, Michoacán and Guerrero.
Successful Emergency Repair of “Infiernillo II Bridge”, in the states of Guerrero and Michoacán. I oversaw 2 subcontractors.
(Total cost more than 3.4 millions US dollars)
Construction of “Celaya Distribution Vial” in Celaya, Guanajuato. I oversaw 2 subcontractors.
(Total cost more than 2.7 millions US dollars)
Resident Supervisor in COPECSA (Construction, Bridges and Structures of Center)
February 2000- July 2001.
Mexico City, Mexico.
Resident in the construction of 3 spatial structure bridges in Michoacán and Tabasco
Supervised the launching of 3 steel bridges in Michoacán and Guerrero
Assistant to the General Supervisor of Bridges, SCT (Transport and Communications Ministry)
October- December 1999
Berriozabal, Chiapas, Mexico.
Construction of the “Chiapas” Bridge, more than a mile over the Malpaso Dam.
Working Training in Sweden - Terrestrial Routes in Vägverket (Swedish National Road Administration)
March-June 1999
Börlange, Jönkoping and Växjo, Sweden.
Comprehend the SNRA procedures for designs, maintenance and construction of roads and bridges
Assistant Coordinator of Supervision Reconstruction of Federal Bridges. SCT (Transport and Communications Ministry)
October1998- February 1999.Chiapas, Mex.
Reconstruction of 17 bridges on the highway of Arriaga- Huixtla and 2 structures on the highway of Tapachula to Belisario Domínguez, in the resident office of SCT in Tapachula, Chiapas.
TRAINING
Forklift Safety and Operations, May 13 Laborer’s Training Fund, Washington, DC, USA
OSHA 10, May 13 Laborer’s Training Fund, Alexandria, Virginia, USA
Electricity I and II, Jun – Aug 2009 ASTRACOR Alexandria, Virginia, USA
Blueprint Reading Advance Level, Building Codes and Construction, Estimates, Scheduling, Business Plan, Administrative plan, Accounting and Contracting Law January-May 2009, ASTRACOR Alexandria, Virginia, USA
Diploma in Public Construction, September-December 2001
Engineering College UNAM, Continuous Education Division, Cuernavaca, Morelos
“Process Qualification of Welding and Welders”, May-June 2001
COMIMSA, Saltillo, Mex.
Diploma in Quality Systems in Project and Construction Engineering, August-September 1999.
Module I “Quality Assurance in the Construction Industry”
Module II “Construction Supervision”, UNAM, Continuous Education Division, Mexico D.F
COMPUTER SYSTEMS
AutoCAD, Fortram, STAD III, Microsoft Office: Excel, Word, Internet, Risa2de.
LANGUAGES
Northern Virginia Community College (NOVA), (ESL) English as a Second Language (Advanced)
English level 550 (Advanced), ESL, Clarendon Institute, Arlington VA, USA
French I, II and III, Education Canada, Montreal Canada
TOEFL Training Course, Professional English Institute, Queretaro, Mexico.
German I (Basic) I.T.E.S.M., campus Querétaro, Mexico.