Jerrel J. Lognion
E-mail acqy1g@r.postjobfree.com
Home 337-***-****
Cell 337-***-****
SUMMARY OF QUALIFICATIONS
Synopsis of Employment:
Accomplished in excess of 35 years experience in the fields of I/E, Structural, Vessel, Rotating equipment
Managed and consulted multiple industrial projects.
Engineering, Inspections (QA, QC), I/C Commissioning and Start up Engineer in Oil & Gas Refineries, LNG, Power Plants (Gas, Diesel and Coal Energy), Gas Compressor Stations/Leaching storage, and Production processes.
Planning and scheduling, estimating, bidding, shipping and receiving of materials for project completion.
Maintained Quality Assurance/Quality Control in all project areas. Supervised installation, checkout and start-up of motor control centers, electrical sub-stations, PLC, UPS, and DCS systems.
Substation conversions and line upgrades
Troubleshooting and problem resolution of plant systems during start-up and maintenance.
Recognized for project completions made prior to scheduled dates.
Developed personnel packages for Quality Control and production enhancements.
On the job training for personnel in operations of project equipment and tools.
Instructed project personnel on rules, regulations, and requirements of the EPA and OSHA.
Documentation of projects upon completion.
Experience Highlights:
Chemical Plant Gas, Diesel Co-Generation Turbines Demil/Chemical depo Pipe Line
LNG/Gas Plants Offshore Production & Sub-sea Environmental units/ Wastewater
Compressor Stations Power Plants/Coal, Gas, Diesel fired Petrochemical / Refineries/ Polly Propalin
Work Experience:
06/11 to Present Shell/Intertek
Port Arthur, TX 600K Barrel a Day Refinery
I/E QA/QC Senior Inspector Manager project wide Over a Staff of 140 inspectors
Eagleford Shell upstream….. Q/A for North America
Permian Basin Shell upstream….. Q/A for North America
03/11 to 6/11 Duke Energy/Blue Water
Degasification Coal power plant Indiana
QA/QC Documentation, Technical Specialist
11/10 to 2/11 Technical Diagnostic Services/Bechtel
TransCanada Keystone XL Pipe Line Dakotas, Nebraska, & Kansas
QA I/E, Commissioning/Start Up
04/10 to 10/10 Pro Energy Services/Derwick
Tocoa, Venezuela South America Energy
QA/QC I/E Manager 2 ea. GE 2500 and 2 ea. GE 6000 and all B.O.P.
07/08 to 02/10 Mustang Engineering/Kinder Morgan Pipeline
Paris, Winfield, and Atlanta, Tx.
QA/QC Utility Inspector, Traceability of 30/42 inch in various wt,s along with documentation
08/07 to 03/08 Tulsa Inspections/Pine Prairie Gas Handling Facility
Pine Prairie, La.
Lead I/E QA Inspector, Consultant, Commissioning/ Start-up, Packages for turnover to client
Dyno Nobel/MEI
04/07 to 07/07 Cheyenne, Wy.
QA/QC Inspections of Vessel sets, Steel erections, rotating equipment, and Painting
10/05 to 10/06 FEMA/CH2M Hill/HKA
New Orleans, La.
QA/QC Inspections, Debris and Property assessments for new electrical services. Assisted in
field training and 100% documentation of other inspectors throughout the project
05/05 to 09/05 Barlow Group:
Harrisburg, Pa. Trash Burner Power plant
I/E QA/QC, Commissioning and Start up, Systems turnovers. Power house
02/05 to 03/05 Atlantic Group:
Perry, Ohio/ Nuclear
I/C Technical/ Outage with the shop personnel in the control rm. and drywell areas
07/04 to 10/04 Perini/Aerotek, Iraq:
Nasiriyah,Iraq, LM6000 and Fuel Oil Treatment Plant (Diesel fired)
I&E Commissioning and Start-up Eng.
11/03 to 04/04 Hudson Global:
Demil/Chemical Depo/ Indiana
I/C Commissioning and Document Control
06/01 to 06/03 Calpine Corporation:
High Desert Project, Siemens Westinghouse 501F combine cycle
Carville Energy Center, GE Frame 7FA combine cycle
Los Medanos Energy Center, GE Frame 7 combined cycle
Acadia Energy Station, Siemens Westinghouse 501D-F2 combined cycle
Ontelaunee Power Station, Siemens Westinghouse 501D-F2 combined cycle
I&C Start-Up and Commissioning Engineer/QA/QC
01/01 to 06/01 Siemens Westinghouse Power Corp /Spec
McIntosh unit 5 Lakeland, FL.
Lake City Power 255MW Natural Gas Power Generation
Siemens Westinghouse Prototype 501G Gas Turbine (Diesel Fired)
Commissioning Start-Up Engineer, including CT reliability runs
06/00 to 12/00 Siemens Westinghouse Power Corp/Spec
Rockingham Power, Reidsville, NC
Dynegy 850 MW Duel fuel 501 FD Siemens Westinghouse
I & C Start-Up Engineer, including CT reliability run
03/00 to 06/00 Enron
Gleason Power 1, LLC Gleason, TN
Enron 520 MW natural gas power generation
3 Siemens Westinghouse 501F gas turbines
01/00 to 03/00 Enron
Wheatland Power, Wheatland, IN
Enron 380 MW natural gas power generation
4 Siemens Westinghouse 501D gas turbines
I & C Start-Up and QA/QC
07/99 to 10/99 Power Industry Consultants
Eco Electrica, Puerto Rico
Enron 507 MW 2 Westinghouse 501F multi fuel Turbines with HRSG’s
1 Toshiba 207 MW steam turbine Start-Up I&C
02/99 to 05/99 Power Industry Consultants
Caledonia Power, Caledonia MS
Enron-6 GE Frame 7E Gas Turbines/Mark V Comm. System
Start-up Electrical and I&C
10/98 to 12/98 American Instruments
Huntsman, Odessa, TX
QA/QC I/E field installations of Foxboro IA Systems in Olefin Refinery
01/98 to 10/98 Operators & Consulting Services/ Genesis
Chevron USA Morgan City, LA/Gulf of Mexico
Genesis Offshore Productions Project, Turnover, acceptance, and Inspection
TA,QA,QC
1975 to 1997 Worked construction, management, commissioning and start-up, and maintenance in
Various Refineries (Olin, Conoco, Shell Oil, DuPont, Huntsman,Certainteed,Monsantos,Exxon,
Lake Charles Refinery,PPG,Louisiana Pigment, Vista, Jupiter Chemical, Citgo, Mobil, Chevron )