Post Job Free

Resume

Sign in

Project Power

Location:
Dubai, DU, United Arab Emirates
Posted:
July 27, 2015

Contact this candidate

Resume:

RESUME

Name : KAARTHIKEYAN RAJENDRAN

Date of Birth : SEP 18, 1984

Nationality : Indian

Sex : Male

Qualification : B.Tech in Electrical.

Languages Known : English, Hindi & Tamil.

Countries of Experience : UAE & India

Total Years of Experience : 10 Years of Exp., 6 years in UAE, 4 years in India

Additional Literacy : M.Tech (Electrical), CMMS Maximo7.5,

Power System Study Software ETAP

CAREER SUMMARY:

Maintenance/Commissioning of LV/HV/MV/EHV Switchgears and Substations (Up to 400KV)

Maintenance/Commissioning of LV/HV/MV/EHV Transformers up to 370MVA & Motors up to 6.1MW.

Participating in Design reviews of Electrical Power System.

Installation, Testing & Commissioning of Protection Relays.

Worked in Thermal, Power, Coal Handling,Oil & Gas Plants.(Onshore &Offshore)

Can work independently and also with good team orientation.

Worked as Company representative on Brown Field Projects.

AREA OF EXPERTISE:

Coordination with manufacturing, construction, installation, maintenance, support, documentation, or testing activities to ensure compliance with Industry, International codes and standards.

Preparation and review of Power/Control philosophies and SLD drawings.

Preparation and review of Load list, shut down and Maintenance report.

Identification, selection and design of Electrical system/equipment for Projects.

Undertake design verification and calculations.

Review of Power System Analysis using ETAP.

Preparation of As-built drawings, Power/Control philosophies schedules and documents.

Preparation of Tender and Scope of Work.

Preparation and review of Electrical power system calculations.

Preparation of Method Statement, Risk Assesment, Work Schedule, Test Reports & Pre-commissioning & Commissioning Dossiers.

Functional & Scheme checks for 400KV, 230KV, 132KV, 33KV Outdoor Switchyards & 11KV, 6.6KV, 0.4KV Indoor Switchboards with Interlocks.

Familiar with Design Skills as:

Design of SLD and Equipment sizing.

Design of Lighting System, MCC and Power Control Centre.

Sizing of Transformer and Generator.

Cable sizing calculation, Cable selection and preparation of Cable Schedules.

Battery Sizing and Calculation.

Designing of Power factor correction control.

Design of Substation Earthing.

Short circuit calculation of Power System.

PROFESSIONAL EXPERIENCE:

From JAN 2010 to till date:

Company Name : CEGELEC OIL & GAS, ABU DHABI.

Designation : Electrical Engineer

From MAR 2006 to DEC 2009:

Company Name : TECHNOSYS ELECTROMECHANICAL & CO., INDIA

Designation : Commissioning Engineer

Details of Experience:

Preventive, corrective and troubleshooting maintenance and testing of all electrical equipment in the plant to maintain the availability and reliability.

Preventive maintenance activities, skilled maintenance, repair and testing of Electrical equipment.

Planning & co-ordination with plant shutdown activities and ensure timely completion of job activities and to attain plant reliability.

Troubleshoot and perform root cause analysis to resolve Maintenance issues.

Review of Condition Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown.

Maintenance of Fire Water Pump skid, Capacitor bank, Reactor and Variable Speed drives.

Awareness on Hazardous area classifications and selection of electrical equipment.

Preparation of ISO standards and procedures for Energy management.

Operation and Maintenance of Electrical System, Utilities and Machineries.

Operation and maintenance of DG Sets.

Provide work direction and instruction to the contractor craftsman.

Monitoring Contractors in completion of Project activities.

Capable of guiding/leading the electrical maintenance team and implementing the best maintenance strategy for the plant.

Implementation of Maximo Job plan for preventive Maintenance and schedule to generate Work orders.

Details of Experience in CEGELEC OIL & GAS:

Organization : Zakum West Super Complex Offshore, PGP & GG2

Project : Electrical Power System Up gradation.

Maintenance, Pre-commissioning and Commissioning of 11KV Switchboards (Areva) and 6.6KV Switchboards (Areva). Commissioning of Synchronization, Link net and DCS Panels Make: Woodward, Power Transformers – 16 MVA, 8.5 MVA, 6.6 KV Motors 2.6MW, HT Cables, Transformer Stability, Bus bar Partial Differential, Generator Differential.

Transfer of Generator Incomer Circuit from Existing Switchgear to New 11 KV Switchgear, Retrofit of Existing 11KV Switchboards (Areva), 6.6KV Switchboards (Areva), Incomers & Feeders, DCS Signal Transfer from Existing panel to New in Live panel.

Pre-commissioning & Commissioning document Preparation, Mechanical Dossiers,

Method Statement & Risk Assessment for the performing jobs. Preparation & Completion of Documents/Drawing for Shutdown jobs. Prepare Electrical drawings for Approval, Construction and As-built.

Modification and preparation of As-built for Single Line Diagrams, Interconnection diagram, Cable schedule, General Arrangement Drawings, Cable routing, Earthing & Lighting Layout Drawings and Intertrip/Interlock Scheme for 6.6 KV and 11 KV Switchboards.

Protection Relay Testing and Commissioning-Generator Differential, Line Differential, Partial Differential, over current, Earth fault, Motor Protection, Under & Overvoltage Protections.

Organization : Zakum Development Company Offshore, ACPT

Project : Replacement of 2MVA Power Transformers.

Assembling and Installation of New transformers, GIS Switchgears and NERs.

Precommissioning and commissioning of 22KV GIS Switchgears, Transformers and NERs.

Modification and Functional check for Existing 22KV switchgear at PGOR.

Testing of New HV cables and Relay configuration,Testing of Protection relays.

Demolition of Existing Transformers, Line Disconnectors, NER at ACPT1.

Organization : Das Island, ADMA

Project : Modification of 11KV Main Switchboard.

Retrofit of Existing 11KV Switchboards. Removal of Existing circuit and modification of new circuit.Buswiring Modification. Functional test for all Modified panels.

Organization : Zakum West Central, Abu Dhabi Marine Operating Company

Project : Replacement and commissioning of 1MW EDG ctrl. Panel

Transfer of Control and Power cables from Existing Control Panel to new 1MW EDG Panel.Installation, Testing and Commissioning of EDG Control Cabinet. Functional check for Diesel Generator.

Organization : Zakum West Super Complex Offshore, GIP ADMA Project : Replacement of 2.5MVA Power Transformers.

Pre-commissioning & Commissioning of New Power Transformers,Testing of HV Cables,Intertrip & Functional checks,Transformer Soak Test and Transfer of loads.Dismantling of Existing Transformers including accessories,Installation of skirt plate inside transformer bay (Oil Drain Pit),Installation of new oil drain lines,Installation & Assembly of new Transformer,Oil Filtration, Filling & BDV Testing,Installation of Transformer LV Terminal adaptor box installation and bus bar connection.

Organization : Zakum West Super Complex Offshore, PGP, ADMA

Project : Replacement of Emergency Diesel Generator Control Panel

Transfer of Control and Main Power cables from Existing Control Panel to new 365KW EDG Panel in Live (control supply).Testing and Commissioning of EDG Control Cabinet.Synchronisation of PGP Main Bus, Emergency Bus, Grid & EDG Supply.

Organization : Bunduq Plant.

Project : Routine Maint. Test for Protec. relays and Battery testing

Carried out Battery Charging and Discharge test. Routine Maintenance test of Protection relays.

Installation of New Battery Banks and supports.

Organization : Zakum West Super Complex Offshore, GIP & GG-2

Project : Installation and Supply of Mitigation Power Cable

Installation of Control and Power cables for Temporary Mitigation Supply from GG2 Platform to GIP Platform. Functional test for Upstream and Downstream breakers. Power up of LV Incomer through Transformer-4 from 6.6kv Feeder.

Organization : Zakum West Super Complex Offshore, ADMA

Project : Replacement of Lightning Arrestor in WIP

Installation, testing and commissioning of New Lightning Arrestors and Copper strips.Replacement of Existing Lightning Arrestors.

Details of Experience in TECHNOSYS:

Organization : West Bengal Power Development Corporation

Sagardighi, West Bengal.

Project : Sagardighi 2x300 MW Thermal Power Plant.

Testing & Commissioning of 415V Switchboards (Merlin Gerin),6.6KV Switchboards (BCC China make),PCC,MCC,ESP Panels, Power Transformers – 370 MVA,Dry Type (2MVA),Rectifier Transformers(.415 KV AC-72KV DC),LT Motors (up to 200 KW), HT Motors (up to 6100 KW), HT Power Cables, Transformer Stability, As Build Drawings & Protection Relays-Overcurrent,Earthfault,Motor Protection, Under & Overvoltage Protections.

Organization : Bhusan Steels and Strips Limited, Dhenkanal, Orissa.

Project : HSM & SMS, Furnace-1

Testing & Commissioning of 415V Switchboards (Tricolite/L&T), Power Transformers (2MVA), Soft Starter Panels,LT & HT Motors,LT & HT Power Cables, Isolators(Astrands Bond)Preparation of Control Cable Schedule in LTSS-1,LTSS-2,Caster,Stacker cum Reclaimer.As Build Drawings, Protection Relays-Over current & Earthfault,Under & Overvoltage(Cable,Motor,Busbar& Transformer).

Organization : Reliance Onshore Gas Plant, Kakinada, AndraPradesh.

Project : KGD-6.

Testing of Commissioning of 415V Switchboard (L&T), 33KV Switchboards (Siemens), 6.6KV Switchboards (Siemens).Digital and Analog Loop Checking for Instrumentation and Electrical Cables. Operations in DCS, ECS, PLC &SCADA systems, DI &DO for Variable Speed Drives in Areas ECS-1,ECS-5,ECS-6.Make:Invensys.

Instrumentation Testing for Digital & Analog Transmitters such as PT,PDT,FT,TT,LT,PCV,FCV,TCV etc.

Instrumentation Testing of Digital & Analog outputs for DCS, Signals such as Current, Voltage, Power, Frequency and Circuit Breaker signals.

Organization : RR Energy Limited 15MW Thermal Plant, Chattisgarh

Project : 11/132KV Substation.

Erection, Testing & Commissioning of 11/132KV System,11KV Swbd.(Areva), 33KV Swbd. (Areva) Outdoor Switchyard Equipments such as CT,CVT,Circuit Breakers, Isolators, Earth Pit,Scheme Check with Interlock. Functional Check of Control Panel, InterPanel wiring checking, and Local & Remote operation of CircuitBreaker from Control Relay Panel and Interlock/Intertrip Check.

Power Transformers (45MVA), Protection Relays- over Current, Earthfault, Over/Under Voltage, Trafo differential, Cable Hipot, Control Cables.

Organization : Power Grid Corporation of India Limited,

Udumalpet, Tamilnadu.

Project : 400/230KV Substation.

Testing & Commissioning of 400/230/33 KV Transformers,400KV(Areva), 230KV(Areva) Outdoor Switchyard Equipments such as CT,CVT,Circuit Breakers,HV Isolators, Earth Pit,Scheme Check with Interlock. Checking of Control Panel, InterPanel wiring checking, and Local & Remote operation of CircuitBreaker from Control Relay Panel with Interlock. Power Transformer (315MVA).

Organization : Nalco CPP 2nd Phase Expansion, Angul, Orissa.

Project : 2x120 MW Thermal Power Plant

Testing &Commissioning of Siemens MCC & PCC.Equipment such as PT, CT, Circuit Breakers, Earth Pit, and Scheme Check with Interlock. Checking of Control Panel, Inter Panel wiring checking, and Local & Remote operation of CircuitBreaker from Control Relay Panel with Interlock. Testing of Dry Type Transformers (2MVA).

Organization : Indian Oil Corporation Limited, Panipat.

Project : MSQ Up gradation Project.

Testing and commissioning of 415V Switchboard (L&T), 6.6KV Switchboards (Siemens).Digital and Analog Instrument Checking for Instrumentation and Electrical Cables. Operations in DCS, PLC &SCADA systems and Loop checking. Make: Yokogawa.

Organization : Jamshedpur Utility Services Company Limited, TataNagar.

Project : 132/11KV Substation.

Client : Siemens.

Tan Delta Testing of 45 MVA PowerTransformers, CVT and CT’s.

Organization : Bokaro Steel Plant, Bokaro.

Project : RLA Project.

Client : Siemens.

Routine testing of 80MVA Three Winding Power Transformers and Six Winding Rectifier Transformers including Tandelta Testing.

Organization : Cairn Limited.

Project : Barmer to Salaya Pipeline Project, Gujarat.

Maintenance of Remote Substation, Testing and Commissioning of 415V Switchboard (GE), 6.6KV Switchboards(Siemens),Scott-Tee transformer Testing,6.6kv Vacuum Contactors,6.6kv Isolators, Earth Pit,HTCable High Voltage Test.

PASSPORT DETAILS:

Passport Number: M8955175 Date Of Issue : 28.06.2015

Place of Issue : Abu Dhabi Date Of Expiry: 27.06.2025

CREDENTIALS:

In Emirates Technical and Safety Development Centre UAE:

BOSIET-Basic Offshore Safety Induction and Emergency Training.

HUET-Helicopter under Water Escape Training.

ADMA Safety Induction -Sea Survival Completion.

Holding Valid Work Permit to work in Offshore.

Authorized to work in Zakum Platform, Umm shaiff Platform and Das Island, UAE.

CONTACT DETAILS:

Mail :- acqxxs@r.postjobfree.com, acqxxs@r.postjobfree.com

Mobile No. :- UAE [ 00-971-**-******* ], INDIA [ 00-91-90920 57861 ]

Date:

Kaarthikeyan Rajendran



Contact this candidate