Post Job Free

Resume

Sign in

Engineer Manager

Location:
Texas
Posted:
July 25, 2015

Contact this candidate

Resume:

Amear Jafer

Houston TX ***** 832-***-****

acqxfy@r.postjobfree.com www.linkedin.com/in/amearjafer

Profile Summary

Client focused, performance driven professional with over 14 years of progressive experience in Engineering, Well planning, Operations, Management and Sales possessing a track record of top performance in a variety of challenging assignments in the oil and gas drilling industry.

Most recent role: Well Planning Manager Baker Hughes for South Texas Unconventional Eagle Ford Shale (Houston)

Previous roles with Baker Hughes: Sales Manager in Kurdistan IRAQ, Drilling Engineer In-House Hess - Unconventional Bakken Shale (Houston), Well planner BP In-House - Gulf of Mexico (Houston), Directional Driller (Middle East Region), Project Engineer Tenders and Contracts (Iraq).

I was a key member of the response team for BP Relief Well #2 (Macando, Horizon rig 2010)

Skills

Team Management Mentoring and Coaching, Project Management, Account Management, Drilling and Evaluation services, Unconventional drilling, Bakken Shale, Eagle Ford Shale, ERD, Application Engineering, Drilling Engineer, Drilling optimization, Reliability, Directional Drilling, MWD, LWD, Coring, RSS Rotary Steerable System, Bits, HPHT, CRM, Sales and Marketing, TAM, Technical Training, Well Planning Well Architect Compass, Survey Management Wellbore Positioning, Tendering and Contract Management, Performance Management, Onshore and Offshore operations, Ultra Deep Water, Coil Tubing

Accomplishment

Well Planning design for BP Horizon relief well, High profile project with talented team of experts.

Performed data collection and statistical analysis that resulted in cost and time saving for Hess by introducing Rotary steerable system to drill laterals saved 2 days of reamer runs.

Professional Experience

Baker Hughes - Jan 2005 to 2015

Well Planning Manager Drilling Services – Houston Tx. 2014-2015

Ensures that well plans package/EOW/Anti-Collision rules are in compliance with Baker Hughes polices & procedures and with customer and local regulations.

Ensures assigned well planners receive training on all aspects of job responsibilities, included but not limited to Well Architect and COMPASS software’s.

Work diligently with the survey management group (IFR/MSA).

Support/Train field personal on well planning and generation of actual versus proposal/collisions avoidance real time monitoring.

Customer meetings to discuss special projects/requests.

Identifies areas where new and cost effective techniques can be applied, handles special projects as assigned.

Sales Manager Drilling Services_ Erbil (Kurdistan-IRAQ Expatriate) 2013-2014

Develops and implements strategic and tactical marketing plans for introduction of business into new geographic area

Win and execute a multi rig drilling contract in Kurdistan for the DD/MWD/LWD, Coring and Mud logging Product lines.

Achieve and exceed Drilling Services revenue plan for Kurdistan, work diligently to support Break Through Revenue goal and applicable pathways as defined by Product Line (PL)

eCRM compliance in establishing all opportunities into Salesforce - active review of opportunities and sales funnel. Adoption and use of the CVR system Establish guideline

Map the Market and update TAM (Total available market) accordingly, set PL field margins and update while project execution, secure required resources in terms of Capex, head counts and workshop set up.

Drilling Engineer - (In House Hess) - Houston Tx (ND Bakken Shale) 2010-2013

Application Engineering and Well Planning for the Williston Basin North Dakota Shale project for Hess with 12 rigs

Hydraulics, Torque & Drag and BHA analysis

Well planning design and executing with 10,000’ laterals

Motors, MWDs, Rotary Steerable system, Bits and other downhole tool optimization to drill wells efficiently and cost effectively

Tool failure reliability analysis and KPI tracking

Well Planner - (In House BP) Houston Tx (Gulf of Mexico) 2008-2010

Relief well plan design and execution for BP Macondo incident

Well planning utilizing Well Architect by Baker Hughes and Compass by Landmark according to BP requirements.

Support MWDs and DDs personal providing (TAC and Structure files)

Plans or re-plans 2D and 3D directional and horizontal wells in GOM and south Texas, monitor surveys and logs, Anti-collision analysis and ellipses report, end of well reports

Design deep water complex wells with collision issues and monitor while drilling

Traveling Cylinder plots using Compass to monitor BP sidetracks with poor ellipses separation every survey till they get clear.

3D model simulation for targets and formations in earth model DGI

Utilizing AutoCAD software to generate lease lines and hard lines

Wellbore positioning and tool error model support

Directional Driller – Middle East Region 2005-2008

Drilling directional J/S wells, Performance drilling, working on the rig floor performing sliding calculations and strapping tools, liaison with Company Man and submit DD morning reports.

Education and Training

Master Degree _ University of Technology, 2001

Civil engineering (Geotechnique) Baghdad – Iraq

Bachelor of Science _ Baghdad University, 1999

Civil engineering Baghdad – Iraq



Contact this candidate