Eric D. Brown
Meridian, MS 39307 acqxb8@r.postjobfree.com
Highly experienced well-site supervisor with extensive background in team environment with focus on safety and compliance; skilled at managing rig contractor personnel, third party contractors, and all members of work team to ensure adherence to Operational Excellence, accurate daily reports and cost control; skilled trainer and mentor; excellent communication skills and technologically savvy; extensive experience supervising onsite drilling and workover operations; committed to personal and team education and development.
PROFESSIONAL EXPERIENCE
BHP Billiton. Houston, TX 2014 - Present
CSV(Site Supervisor). Responsible for tubing installation operations with workover rig. Also supervising workover/recompletion jobs, which involve removing old production tubing string and installing new tubing strings. With or without gas lift valves. Also overseeing fishing jobs with workover rig, work involving recovering and laying down parted and or cut tubing strings. Supervising wireline packer setting operations and disc breakage operations utilizing slickline.
BP America Production US Inc. Wamsutter, WY 2012 - 2014
Well site Leader: Responsible for onsite day to day operations within completions group. Duties included: Logistical planning, managing contractors onsite, and implementing well specific procedures in the field. As well as leading all safety meetings and assuring all contractors are in compliance with operators policies and safety programs.
Work Completed:
Multiple frac operations: Multi stage fracking which involves perforating production sands and setting composite bridge plugs between the production perforations. And supervising frac pumping operations to assure compliance with frac design and procedure.
Multiple Coil tubing drill-outs: Milling out composite plugs set during frac operations.
Multiple Flowback operations: Clean-up wells after frac operations have been completed prior to flowing wells to operations production process equipment.
Shell Appalachia. Wellsboro, PA 2011 – 2012
Well-Site Supervisor – Working as OSR(Onsite Representative) Implementing Completions and workover operations with operator in the Marcellus Shale. Managing well site contractor’s as well as leading all safety meetings and assuring all contractor’s are in compliance with operators policies and safety programs
Work Completed:
Multiple frac operations: Multi stage fracking which involves setting composite bridge plugs between production perforations.
Multiple Coil tubing drill-outs: Coil tubing operations consist of Performing TCP(Tubing Conveyed Perforating) prior to performing perforating / frac operations. As well as milling/drilling out composite plugs set during frac operations.
Multiple Snubbing operations: Snubbing 2-3/8” tubing into wells for production. After flowback clean-up has been completed.
ENI US Operating Inc. New Orleans, LA 2008 – 2011
Well-Site Supervisor – Responsible for working as company representative to safely and efficiently execute operator well prognosis; perform drilling, completions, workovers and multiple well plug and abandonments; hold regular safety meetings and review JSAs
Work Completed:
Main Pass 281A #1: Workover with Snubbing Unit: Pulled 12,500’ 2-7/8” Kawasaki tubing and all jewelry, replaced with 12,500’ 2-3/8” BTC tubing and all jewelry
West Delta 89: A #1, #10, #17: 3 – Well Recompletion with 1500hp Platform Rig
A-#1: Pulled all production tubing and all jewelry; set single Weatherford casing patch inside damaged production casing, perforated and installed Baker Hughes completion system; gravel packed, ran production jewelry and tubing, and brought online for production
A-#10: Pulled production tubing and all jewelry; set dual Weatherford casing patches inside previous production casing perforations; ran Schlumberger Triple Combo to locate exact pay sand depths; re-perforated production casing; installed Baker Hughes completion system; gravel packed, ran production jewelry and tubing; brought well online for production
A-#17: Evaluated production tubing for possible leaks; ran Schlumberger’s EM Pipe Scanner; found damaged tubing; cut above damaged tubing with Schlumberger chemical cutter; dump bailed 50’ of cement; set dual Weatherford casing patches in previously perforated production casing; logged with Schlumberger triple combo to locate exact pay sand depths; re-perforated well; ran Baker Hughes completion system; gravel packed well; ran production jewelry and tubing; brought well online for production
West Cameron 100 - Workover Utilized C-116 Jack-up Rig
Pulled 2-7/8” tubing and ran 2-3/8” tubing to bring up well pressure. Brought online and turned over to production
High Island A-1 #1-Plug and Abandonment: Utilized Letourneau C-116 Jack-up
Performed plug and abandonment as required by MMS; cut and laid surface casing; left platform for decommissioning crew
Ship Shoal 246-A #1, #3, #8, #10, #12, #15, #16, #17: Utilized Power Swivel
Provided assistance to well-site supervision for multi-well plug and abandonment program with Halliburton Complete Solutions Group
Main Pass 280 Well C #2:
Milled barium sulfate utilizing Halliburton coil tubing unit with 1-1/4” coil tubing to increase production
Dominion E&P New Orleans, LA 2000 – 2008
Well-Site Supervisor – Managed and lead team to ensure safe and efficient execution of operator well prognosis. Performed drilling & completions. Held regular safety meetings and review of JSAs.
Land Rig Rowan: Rig # 59 – AC Electric 2,000hp triple derrick land rig 25,000’ drilling depth capability
Plaisance #1 Valentine, LA – 16,500’ horizontal well (final deviation 12 ); pay sand and hydro-carbons were
not sufficient to ensure cost efficiency for production
Page 2 of 2 Eric D. Brown 601-***-****
JR Ranch Well #1 Raceland, LA – 15,000’ vertical gas well drilled with 14.5ppg WBM;
Completion: Well non-gravel packed
Land Rig: H&P #72 – SCR 3,000hp triple derrick land rig 30,000’ drilling depth capability
Drilled and Completed 1 Well:
Ridgefield #1 Thibodaux, LA – 13,500’ vertical gas well
Completion: Well non-gravel packed
Land Rig: Rowan Land Rig # 26: SCR diesel electric 2,000hp triple derrick land rig 25,000’drilling depth capability
Drilled and Completed 1 Well:
Lapalco #1 Westwego, LA - 14,000’ horizontal well (final deviation 21 ); oil and gas well; gravel pack completion
with gas lift mandrels implemented
Material Expeditor / Logistics Coordinator – Maintained accurate morning reports; coordinated all logistics for drilling tools and personnel
Extensive use and proficiency with Peloton’s WellView System
Proficient with MGI’s DIM reporting system
Skilled with Epoch’s PERC reporting system
Highly experienced with Landmark OpenWells’ reporting and cost tracking program
Chiles Offshore Houston, TX 1998 – 2000
Floorhand / Derrickhand – Maintained all relevant drilling equipment; operated and maintained all emergency safety equipment; mixed and maintained drilling fluid
Journeyed into drilling rig derrick to rack-back drill pipe and BHA strings
Maintained and properly repaired mud pumps on facility
Properly maintained and ran rig floor
Global Marine Drilling Co. Lafayette, LA 1997 – 1998
Roustabout / Floorhand – Maintained main deck; offloaded and backloaded boats; made up and broke out drill strings; maintained blowout preventer and all equipment on rig floor
CERTIFICATIONS & SKILLS
IADC Well Control Certification, 2014
LSU Live Well Training, 2013
TWIC Card Holder, 2010
Crane Certification, 2013
Safety Certification, 2013
Rigger Certification, 2005
Hazmat Certification, 2014
Hazwoper Certification, 2014
Proficient with Microsoft Office Suite