Post Job Free

Resume

Sign in

Manager Supervisor

Location:
United States
Posted:
July 24, 2015

Contact this candidate

Resume:

Forrest A. Davis III

*** ** ****

Decatur, Texas 76234

940-***-****

I seek employment that will enable me to optimize my ability and skills as well as furthering my knowledge in various aspects of drilling and work over completions. I have worked closely with all level of oil field employees from well hands, to supervisors, company representatives, and directional contractors in drilling of wells ranging from 2900 to 20,000 feet. I am a self-starting problem solver with exceptional planning and organizing skills. I work hard to achieve goals, meet deadlines, and trouble shoot problems while working well under pressure. I also possess the ability to deal successfully with all types of people under complex scenarios as a team player with a “can-do” attitude.

PROFESSIONAL EXPERIENCE

Sept 2014- January 2015

Sandridge Oil and Gas Oklahoma

Wellsite Supervisor

Perform well maintenance Change out and install ESP pumps. Install rod pumps, Fish parted rods. Do well clean outs using tubing bailer or coil tubing wash outs. Manage daily operations and cost control. Preform pre job safety meetings with crews. Install new tubing stings and test tubing. Daily reporting on Wellview. Worked well with company reps and venders to ensure quality of work. Watch daily cost. Wells horizontal Mississippi formation. 9000’- 10,000’ wells

January 2014- Sept 2014

Interstate Explorations

Well Site Supervisor

Manage Daily operations in Montana. Supervised work over rigs and Production crew. Completed and worked over wells in the Red River formation and Bakken. 12,000’- 14,000’. Managed budget on 4 locations at one time. Oversee daily production reports. Preform drill outs and TBG installs. Trouble shoot down hole problems. Work closely with Engineers and Company employees. Insure safe working environment. Use XL format well reporting. Worked 130 days straight to meet deadlines and lease obligations. Continue to work to increase well production and watch cost.

August 2013- December 2013

Encana Oil & Gas USA

Well Site Supervisor

Drilling and Completions, Worked on wells in the Boiser, 19,000’Woodford 16,000’ Hayesville 13,000’ Preform work over operations Tbg change outs, Well bore clean outs,Fish stuck pipe,Set packers Snubbing in Tbg while well still flowing to sales Bottom hole pressure’s 7000-11000 surface pressures’ 2500- 9700 psi. Preform all types of well control. Working closely with company Engineers and Field Superintendents managing daily cost control. Insure safe working environment and follow safety plan’s safety meetings and hazard identify. Use Wellview reporting system.

April 2013- August 2013

Hilcorp Energy Company

Well Site Supervisor

Drilling and Completions, Work on cased hole Intervention and work over .Managed daily work over operations. Work closely with company engineers and management. Managing cost control and work site safety. Well depth ranging from 12,000’ to 16,000’ vertical and horizontal completions. Fish coil tbg stuck or failed packers. Gravel packs, tbg change out and gas lift mandrels, drill outs. All types well control. Using WellEZ program. Inland waters and Land based rigs.

December 2011 to April 2013

Conoco/Phillips Lower 48 Eagle Ford Shale

Well Site Consultant (Supervisor)

Drilling and Completions in the Eagle Ford Shale. Managed daily operations while working closely with company engineers and area managers and contractors. Worked on work over Snubbing and drill out and well intervention. Fish stuck packers and coil tbg well ranging’s from 16,000’ to 20,000’.Work with wells with high bottom hole pressure using oil base mud 16-18.5#. Frac Prep Frac Tree placement and testing. Mix acid for frac jobs. Working close with crews on JSA and job procedures. Ensure cost control and safe working environment. Go card Safety meetings. While using The Well View program.

June 2011 to December

Talisman Energy USA Cotulla, Texas

Well Site Consultant

Drill in the Eagle Ford Shale. Maintain and managed daily drilling operations. Work closely with directional drillers, company engineers and drilling contractors, drilled wells from 16,000’-20,000’ Using water base and oil base drilling fluids (Mud). Utilize 9.0-14.0 # Mud while working with the latest top drive rigs. Ensure cost control and safe working environment. Meeting or working behind the curve.Wellview program. Encourage crews to continue progress in a timely manner.

May 2010 to June 2011

EOG Resources, Bowie, Texas

Work-over and Completion Consultant

Work over wells that needs tubing change, Pump change and install new pumps per well plan. Fish pumps,rods,packers.Hot oil wells as needed. Coil tubing, drill outs, work-over and well completions. Run in gas lift valves, plungers, nitrogen and acid fracs. Experience snubbing, general well work-over and completions. Maintain daily work records and cost control. Formation experience includes upper and lower Barnett, and other sand pays. Complete daily reports using the Perc Reporting Program. Have experience with well depths of 8000’ to 13,500’ and KOP’s from 12,000’ to 13,500’ MD.

April 2008 to 2010

Pioneer Natural Resources

Well Site Consultant

Significant experience with work-over, completions, coil tubing wash out, foam air, drill out. Run production string per engineering specs. Trouble shot down-hole problems. Down hole pump changes and rod replacement, Space out pumps. Work-over oil sands and Barnett Shale gas. Work with double and triple work-over rigs. Work well with company engineers. Maintain daily work records and costs. Experience with directional drilling wells to depths of 6000’ to 12,000’ MD. KOP’s of 6,000’ to 7,200' shale and sand pays.

January 2005 to March 2008

Carrizo Oil and Gas, Houston, Texas

Well Site consultant

Managed daily drilling operations, cost control and directional drilling using water and oil base drilling fluids wells were drilled using SCR and mechanical rigs in the Barnett Shale. Well Depths of 6,500’ Start KOP of 11,000’ - 13,000’ with 9#-13# mud weight. Work closely with MWD and directional drilling contractors and company engineers; ensure the most cost effective and safe working environment.

January 2003- January 2005

Range Resources, Barnett Shale

Drilling Consultant

I have worked with employees and managers at all levels. I worked as a team member to ensure the most cost effective and safe working environment while keeping the well operational and on the appropriate time line as directed. Using can rig top drive to well depths of 9,700’ to 10,500’ with mud weight 9.0 - 11.0. Drilled and completed the 10th best producing well in the Barnett Shale.

April 2001 to December 2002

Sundown Energy, Dallas, Texas (Pointalhash Field Inland Waters)

Drilling and Completions Consultant

Managed daily operations drilling and work over gravel packs and general well workover and completions. Work with rotary rig, work closely with company engineers and service companies. Ensure close safety guidelines. Coordinate well plans and daily cost work closely with MWD and Directional contractors. We Drilled and completed these wells using the same rig. Well Depths 0f 10,000’ to 15,000’ and ISP of 2000 PSI to 3500 PSI.

January 1999- May 2001

North Texas Llano, Amarillo, Texas

Drilling and Completions Foreman and well site supervisor

Completing wells in the Barnett Shale play. Drill and complete vertical and horizontal wells of 8,000’ to 9,000’ vertical and 11,000’ Horizontal. Work closely with company engineers on drilling and completions of wells. Plan and set up appropriate frac equipment for hydraulic fracing and bring wells online. Supervised construction of gathering system. Flow wells back turn down to sales line. This work was performing with 900 hp rotary rig. Completion work was performed with a double triple. Drilling out plugs for 6-10 stages.

June 1997-January 1999

Flint Energy Services

South Texas Area Manager

Managed daily operations and oversee pipeline construction and field supervisors ie

Pipeline Welders, Rightway crews, Pipeline inspections 6" 8" 10" 12' 24" Transition and Sales lines from 200'- 20 miles. Oversee gathering facilities construction and general oil field contruction ie Compressor station construction, Gathering Faclities. Manager job cost control and AFEs, Enforce and teach safety practices. Daily JSA. Work closley with City and County goverments on ordience and public safety. Follow city and county and state rules and regulations.

October 1983 September 1997

City of Fort Worth, Fort Worth, Texas

EMT Fire Fighter

Fire and Ambulance protection for approximately 600,000 people. Worked in all types of emergencies needs protect and serve the residents of Fort Worth. Raised to the rank of Distric Manager.

May 1981 September 1983

Baker Oil Tools

Tool Hand Shop Help

Repaired and built parts for down hole tools, IE Packers, plugs, bailers, redressed overshoot’s and Model R Packers. Work to learn repair of all types of down hole tools.

EDUCATION & PROFESSIONAL DEVELOPMENT

WSC Well Control

Management Diversity and Conflict Resolution Training

Jobsite Safety

Confined Space Entry

Rig Safety and JSA Evaluations

H2S Training

Tarrant County Junior College, Fort Worth, Texas

Western Hills High 1981

IADC Well Control Supervisor level

WSC Supervisor level Snubbing and Coil Tubing

BOP Training

EMT Training North Texas Medical School

Perc Reporting System (Can Rig

Well View Reporting System

Certified Texas Fireman Texas A&M



Contact this candidate