Gary A. Landers
Pleasant Prairie, WI. 53158
acqwfq@r.postjobfree.com
Current status: Journeyman Pipe fitter (33 years) ( OSHA-30) (TWIC)
Experience: Certified welder: Heli-arc, Stick, Mig and Butt joint Fusion
Refrigeration: Industrial-Ammonia, Freon, Freezers, Chillers, etc.
Boiler Installation: Industrial, Hydronic and Steam, Operate and Maintain
Natural Gas and LP: Process and Heat
Machinery Moving: Heavy Rigging and Installation
Pneumatics: Controls and Operation
Hydraulics: Operational and Installation
Instrumentation: Controls and Process
Industrial Compressors: Install, Operate and Maintain
Plant Maintenance: Industrial Machinery and Plant Support Services
Mechanical Drafting: Creating and Proof Reading
Job Foreman: Organize, Execute, Document, etc.
Work History: Fluor Constructors 2010 and 2011
BP Oil Refinery and
Conoco Phillips Oil Refinery (Construction)
I worked on the installation of
pipe for steam and process systems
for the new Coker projects to refine
Canadian Oil sands.
Day & Zimmerman 2007, 2008, 2010 and 2011
Pleasant Prairie Power Plant
I worked on the building of the
Prototype 1 10th scale Carbon
Capture system for plant emissions.
Also installed a new Natural Gas
System for plant burners and
Clad pipe for Coal feed systems.
Bechtel Construction Company 2008, 2009, 2010 and 2011
Oak Creek Power Plant and
Prairie State Power Plant (Construction)
Installed and welded the pipe
for the Feed Water systems and
steam supply for the Feed Water
heaters. (Heavy Wall Hot weld)
Daimler Chrysler 1996 through 2007
Kenosha Engine Plant (Maintenance)
I operated and maintained all the
Plant services equipment: Boilers,
Chillers, Compressors and Water
Treatment facilities. Repaired
and maintained all production equipment,
machinery and Hydromation systems.
Martin Peterson Company 1991 to 1996
Kenosha, WI. (Construction)
I was a foreman in charge of
installing all Refrigeration and
AC systems. We also installed
Industrial boilers and heating
systems of all types. HVAC
(Factories, Hospitals, Banks and Schools)
AC & R Specialists 1990 and 1991
Sioux City, IA. (Construction)
I was a foreman: we built a 6 650 ton
Compressor Ammonia Refrigeration
system for freezers and chillers for cold
storage for the SuperValu warehouse.
Also installed Ammonia systems for
Oscar Meyer (Madison, WI)
Bain Nelson 1987 to 1990
Kenosha, WI. (Construction)
I was a foreman: we built the largest
vertical rotor car shredder in the United
States. I also built a 40,000 gal. Ware tank
. for General Electric Plastic Division in
Ottawa Ill. Moved the Young Radiator
Factory from Racine, Wis. to Lexington,TN
American Industrial Refrigeration 1986 and 1987
Watsonville, Ca. (Construction)
I installed an Ammonia Chiller system
with heat exchangers for the new tank
farm and installed a new juice box filler
machine with steam supply. We also built
a new blend tank room. (tanks and pumps)
with sanitary stainless steel pipe. (Ocean Spray)
Powers – Azco – Pope 1984 to 1986
Byron Nuclear Power Plant (Construction)
I was a Nuclear Instrumentation foreman,
Unit 2 Containment building. I was in
charge of installing all the instrumentation
for the 1 million gal. Emergency Reactor cooling
water system. I was also in charge of installing
the Rock River water level transmitter recorder
system at the river pump house station.
Wisconsin Associates 1978 to 1983
Pleasant Prairie Power Plant (Construction)
I attended a 6 month on site welding school
and received my welding certifications.
I installed all the main steam support hangers
and installed all of the condenser pumps and
piping in Unit 1 and Unit 2
Memberships: Plumbers and Steamfitters Local #118 and U.A.W. Local #72
Update: AMS MECHANICAL SYSTEMS INC. 2012 and 2013
BP OIL REFINERY, WHITING INDIANA.
I worked on installing the new piping systems, (tanks, filters, pumps, etc.) for the 12 pipe still, new Coker, and the OSBL part of the system.