Power Plant Construction, oil refinery, certified welder. pipe fitter

Location:
United States
Posted:
July 24, 2015

Contact this candidate

Resume:

Gary A. Landers

**** *** ***** *** ****

Pleasant Prairie, WI. 53158

262-***-****

acqwfq@r.postjobfree.com

Current status: Journeyman Pipe fitter (33 years) ( OSHA-30) (TWIC)

Experience: Certified welder: Heli-arc, Stick, Mig and Butt joint Fusion

Refrigeration: Industrial-Ammonia, Freon, Freezers, Chillers, etc.

Boiler Installation: Industrial, Hydronic and Steam, Operate and Maintain

Natural Gas and LP: Process and Heat

Machinery Moving: Heavy Rigging and Installation

Pneumatics: Controls and Operation

Hydraulics: Operational and Installation

Instrumentation: Controls and Process

Industrial Compressors: Install, Operate and Maintain

Plant Maintenance: Industrial Machinery and Plant Support Services

Mechanical Drafting: Creating and Proof Reading

Job Foreman: Organize, Execute, Document, etc.

Work History: Fluor Constructors 2010 and 2011

BP Oil Refinery and

Conoco Phillips Oil Refinery (Construction)

I worked on the installation of

pipe for steam and process systems

for the new Coker projects to refine

Canadian Oil sands.

Day & Zimmerman 2007, 2008, 2010 and 2011

Pleasant Prairie Power Plant

I worked on the building of the

Prototype 1 10th scale Carbon

Capture system for plant emissions.

Also installed a new Natural Gas

System for plant burners and

Clad pipe for Coal feed systems.

Bechtel Construction Company 2008, 2009, 2010 and 2011

Oak Creek Power Plant and

Prairie State Power Plant (Construction)

Installed and welded the pipe

for the Feed Water systems and

steam supply for the Feed Water

heaters. (Heavy Wall Hot weld)

Daimler Chrysler 1996 through 2007

Kenosha Engine Plant (Maintenance)

I operated and maintained all the

Plant services equipment: Boilers,

Chillers, Compressors and Water

Treatment facilities. Repaired

and maintained all production equipment,

machinery and Hydromation systems.

Martin Peterson Company 1991 to 1996

Kenosha, WI. (Construction)

I was a foreman in charge of

installing all Refrigeration and

AC systems. We also installed

Industrial boilers and heating

systems of all types. HVAC

(Factories, Hospitals, Banks and Schools)

AC & R Specialists 1990 and 1991

Sioux City, IA. (Construction)

I was a foreman: we built a 6 650 ton

Compressor Ammonia Refrigeration

system for freezers and chillers for cold

storage for the SuperValu warehouse.

Also installed Ammonia systems for

Oscar Meyer (Madison, WI)

Bain Nelson 1987 to 1990

Kenosha, WI. (Construction)

I was a foreman: we built the largest

vertical rotor car shredder in the United

States. I also built a 40,000 gal. Ware tank

. for General Electric Plastic Division in

Ottawa Ill. Moved the Young Radiator

Factory from Racine, Wis. to Lexington,TN

American Industrial Refrigeration 1986 and 1987

Watsonville, Ca. (Construction)

I installed an Ammonia Chiller system

with heat exchangers for the new tank

farm and installed a new juice box filler

machine with steam supply. We also built

a new blend tank room. (tanks and pumps)

with sanitary stainless steel pipe. (Ocean Spray)

Powers – Azco – Pope 1984 to 1986

Byron Nuclear Power Plant (Construction)

I was a Nuclear Instrumentation foreman,

Unit 2 Containment building. I was in

charge of installing all the instrumentation

for the 1 million gal. Emergency Reactor cooling

water system. I was also in charge of installing

the Rock River water level transmitter recorder

system at the river pump house station.

Wisconsin Associates 1978 to 1983

Pleasant Prairie Power Plant (Construction)

I attended a 6 month on site welding school

and received my welding certifications.

I installed all the main steam support hangers

and installed all of the condenser pumps and

piping in Unit 1 and Unit 2

Memberships: Plumbers and Steamfitters Local #118 and U.A.W. Local #72

Update: AMS MECHANICAL SYSTEMS INC. 2012 and 2013

BP OIL REFINERY, WHITING INDIANA.

I worked on installing the new piping systems, (tanks, filters, pumps, etc.) for the 12 pipe still, new Coker, and the OSBL part of the system.