Sean Jamal Cardell
*** *** *** *****, *******, TN 37013– 423-***-**** –acqugr@r.postjobfree.com
Education Vanderbilt University, Nashville, TN
Bachelor of Science, Dec 2010
Major: Engineering Science (with focus on Civil and Environmental Engineering)
Minor: Engineering Management
Middle Tennessee State University, Murfreesboro, TN
Master of Science, Aug 2013
Major: Engineering Technology
Experience Fire Sprinkler, LLC (Nashville, TN)
Helper, Aug 2014-Mar 2015
Kept working areas clean
Created sprinkler parts for installation
Helped sprinkler installers with pipe adjustments
Lay out and install metal and cpvc pipe
Used Blueprints to install lines
Martinrea Automotive Heavy Stamping (Springfield, TN)
Junior Quality Engineer, Dec 2013-Jun 2014
Performed APQP procedures for reorganizing plant part information
Built up part PPAP for C489 Program
Coordinated with customers to acquire PPM scorecards
Coordinated with customers to resolve quality issues
Performed Control Plan Audits for Ford Parts produced
Began turning over Work Instructions, Poke-Yoke, and Gauge Instructions to a more unified format
Coordinated with Quality Auditors to fix current Quality issues with parts
Coordinated with Maintenance to create Poke-Yokes for part assembly cells
Audited Control Plans and PFMEAs to be more consistent
Middle Tennessee State University (Murfreesboro, TN)
Graduate Assistant, Mar 2012-August 2013
Deployed and Recovered Campus Computers for Repairs
Repaired campus computers
Performed updates on campus computers
Greytree Partners (Chattanooga, TN)
Flashing Specialist, Jul 2011 – Sep 2011
Contracted by Volkwagen of Chattanooga
Inspected car alarm and starter systems
Reflashed Bluetooth systems
Skills: Structural Design, Risk Evaluation, Project Management, Computer Programming, Engineering System Design, Engineering Company Management, Transportation Design, Six Sigma, LEAN, Project Management (40 Hour Classroom Instruction), Design of Experiments, OSHA 30 Hour Certification, APQP, Ford SIM training, Gage R&R, SPC, PFMEA, Correlation, CPK/PPK, Root Cause Analysis
Memberships Society of Manufacturing Engineers (2012-Present), American Society of Civil Engineers (2013-Present)
Software Proficient in MATLAB, AutoCAD, Java, ProEngineer, Blender. Extensive experience in Microsoft Excel, Word processing programs, C++, Microsoft Office Vizio, Microsoft Office Project. Experience in CORE, SpinFire
Project Solar Energy & Fuel Cell Proposal, Aug – Dec 2009
●Wrote an analysis of a company and the market for a device that uses Fuel Cell and Solar Power technology
●Wrote about the development of a Fuel Cell/Solar Power device, including market environment, prototyping, etc.
Solar Panel Feasibility Study, Jan – May 2010
●Acquired plans for Vanderbilt University’s Featheringgill hall to plan location of Solar Panels, and created a modified CAD drawing with the proposed locations
●Planned out GANTT Charts and Work Breakdown structures for the study, as well as Executive Summary
ARx Bin System Design, Jan – May 2010
●Designed a system for electronically organizing medical records
●Wrote proposal documenting proposed changes in the current Bin System
●Planned out GANTT Charts for designing and programming the new System.
Nissan Run-Out/Boil-Out Issues – Jan 2012 – Aug 2012
Investigated problems on Nissan of Smyrna’s paint lines
Used Six Sigma techniques to attempt to find patterns in eCoat boil techniques
Determined that there was conflicting data in previous door audits vs current specifications
Nissan Door Facia Line Issues – Jan 2012 – May 2012
Investigated issues with waste along the facia lines of the Nissan plant in Smyrna
Used Lean Manufacturing Techniques
Determined batch sizes needed to be standardized
C489 PPAP Project – Feb 2014-June 2014
Collected previous project information after previous owner left
Performed Attribute Gage R&R on C489 Parts, and organized Variable Gage R&R with CMM operators to send to customer.
Coordinated Materials testing for certification
Bought off on part modifications for capability studies
Organized capability study and part layout data
Checked and updated control plans, and PFEMAs as needed
Initiated GP-12 for part inspection before launch
Gained material certifications
Updated work, Packaging, and Gauging instructions
Acquired Gauge certifications for PPAP requirements