Post Job Free

Resume

Sign in

Project Engineering

Location:
TN, 37013
Salary:
50000
Posted:
July 21, 2015

Contact this candidate

Resume:

Sean Jamal Cardell

*** *** *** *****, *******, TN 37013– 423-***-**** –acqugr@r.postjobfree.com

Education Vanderbilt University, Nashville, TN

Bachelor of Science, Dec 2010

Major: Engineering Science (with focus on Civil and Environmental Engineering)

Minor: Engineering Management

Middle Tennessee State University, Murfreesboro, TN

Master of Science, Aug 2013

Major: Engineering Technology

Experience Fire Sprinkler, LLC (Nashville, TN)

Helper, Aug 2014-Mar 2015

Kept working areas clean

Created sprinkler parts for installation

Helped sprinkler installers with pipe adjustments

Lay out and install metal and cpvc pipe

Used Blueprints to install lines

Martinrea Automotive Heavy Stamping (Springfield, TN)

Junior Quality Engineer, Dec 2013-Jun 2014

Performed APQP procedures for reorganizing plant part information

Built up part PPAP for C489 Program

Coordinated with customers to acquire PPM scorecards

Coordinated with customers to resolve quality issues

Performed Control Plan Audits for Ford Parts produced

Began turning over Work Instructions, Poke-Yoke, and Gauge Instructions to a more unified format

Coordinated with Quality Auditors to fix current Quality issues with parts

Coordinated with Maintenance to create Poke-Yokes for part assembly cells

Audited Control Plans and PFMEAs to be more consistent

Middle Tennessee State University (Murfreesboro, TN)

Graduate Assistant, Mar 2012-August 2013

Deployed and Recovered Campus Computers for Repairs

Repaired campus computers

Performed updates on campus computers

Greytree Partners (Chattanooga, TN)

Flashing Specialist, Jul 2011 – Sep 2011

Contracted by Volkwagen of Chattanooga

Inspected car alarm and starter systems

Reflashed Bluetooth systems

Skills: Structural Design, Risk Evaluation, Project Management, Computer Programming, Engineering System Design, Engineering Company Management, Transportation Design, Six Sigma, LEAN, Project Management (40 Hour Classroom Instruction), Design of Experiments, OSHA 30 Hour Certification, APQP, Ford SIM training, Gage R&R, SPC, PFMEA, Correlation, CPK/PPK, Root Cause Analysis

Memberships Society of Manufacturing Engineers (2012-Present), American Society of Civil Engineers (2013-Present)

Software Proficient in MATLAB, AutoCAD, Java, ProEngineer, Blender. Extensive experience in Microsoft Excel, Word processing programs, C++, Microsoft Office Vizio, Microsoft Office Project. Experience in CORE, SpinFire

Project Solar Energy & Fuel Cell Proposal, Aug – Dec 2009

●Wrote an analysis of a company and the market for a device that uses Fuel Cell and Solar Power technology

●Wrote about the development of a Fuel Cell/Solar Power device, including market environment, prototyping, etc.

Solar Panel Feasibility Study, Jan – May 2010

●Acquired plans for Vanderbilt University’s Featheringgill hall to plan location of Solar Panels, and created a modified CAD drawing with the proposed locations

●Planned out GANTT Charts and Work Breakdown structures for the study, as well as Executive Summary

ARx Bin System Design, Jan – May 2010

●Designed a system for electronically organizing medical records

●Wrote proposal documenting proposed changes in the current Bin System

●Planned out GANTT Charts for designing and programming the new System.

Nissan Run-Out/Boil-Out Issues – Jan 2012 – Aug 2012

Investigated problems on Nissan of Smyrna’s paint lines

Used Six Sigma techniques to attempt to find patterns in eCoat boil techniques

Determined that there was conflicting data in previous door audits vs current specifications

Nissan Door Facia Line Issues – Jan 2012 – May 2012

Investigated issues with waste along the facia lines of the Nissan plant in Smyrna

Used Lean Manufacturing Techniques

Determined batch sizes needed to be standardized

C489 PPAP Project – Feb 2014-June 2014

Collected previous project information after previous owner left

Performed Attribute Gage R&R on C489 Parts, and organized Variable Gage R&R with CMM operators to send to customer.

Coordinated Materials testing for certification

Bought off on part modifications for capability studies

Organized capability study and part layout data

Checked and updated control plans, and PFEMAs as needed

Initiated GP-12 for part inspection before launch

Gained material certifications

Updated work, Packaging, and Gauging instructions

Acquired Gauge certifications for PPAP requirements



Contact this candidate