Employment Objective: To obtain a Well Site Supervisor /Company Man position in a
supervisory or management level with a vison to utilize my professional experience in a renowned organization. I look forward to directing a team and carry out my assignments reflecting the organization’s vision and goals. Executive Summary:
My oilfield career began in 1976. I broke out working floors. The experience and money was self-gratifying. I knew this was my calling. Seen herein is my work history for Operators, and contractors. My work development philosophy began with first training & educating myself. As I advanced in my career, I became responsible for my crew member’s lives, as well as my own, I used what I had learned to ensure everyone would be going home in one piece to their families. Safety is very important to me. I am able to grasp new ideas and integrate them into desired results. I seek a challenging position with progressive opportunities where proven talents in management, negotiation, and problem solving can be effectively utilized to our mutual benefit. QUALIFICATIONS AND HIGHLIGHTS:
Well site supervisor in the Eagle Ford Shale for Anadarko and BHP Billiton
Established reputation as a Rig Manager that will improvise to the equipment or strengths available on location.
Quickly identify problem situations and troubleshooting those problem areas from the wellsite as needed with forward planning & procedures sent to the customer’s work and plan different tasks w/ Operator Rep.
Strong team leadership skills
100% of my supervision has been in Land. This has developed my drilling skills to adapt to various types of drilling conditions including all types of directional wells, extended reach and under balanced drilling
My career has been split in approximately 15 % Well Site Supervisor -rig manager 45% driller 35%- Rest Rig Hand
Maintain industry certifications for well control, and all aspects of safety including Leadership training, Fall Protection, H2S, Confined Space, Respirator Fit, Basic Orientation Plus, CPR, and First Aid
2 years drilling 3 to 6 wells on same location w/ skid package, drill fast wells from 2000’ to 14,000’ wells in 5 to 6 days horizontal wells kick of point from 7500’ to 8000’ from nipple up to release, skid rig in 30 to 1 hour, nipple up & test bop’s in 12 to 14 hours
Promote and practice good communication and professionalism at all times
Monitor full drilling operations & drilling parameters
Coach drillers in good tripping procedures & how to identify and control all well control issues
Humberto Martinez
Home Address: Box 5004
Hidalgo Texas 78557
Cell Phone- 956-***-****
Home Phone- 956-***-****
Email: acqlva@r.postjobfree.com
EXPERIENCE HISTORY
2014-2015:
Well Site Supervisor in the Eagle Ford Shale for BHP Billiton.
Drilled 17,000’-19,000’ Wells At Dewitt County with HP Flex 5
Rigs – Perform Location, Scout Reports, Perform Ground Level Verification
Before Rig Moves – Supervise Rat Hole Drilling, Cellars-Conductors-Mouse Holes.
Fill out Ground Disturbance Permits, Job Risk analysis, Rescue Plans
Supervise Well Head Installation Before Rig Move
Supervise Rig Moves 24 hours Operation Rig Moves. 2013-2014:
Well Site Supervisor in the Eagle Ford Shale for Anadarko drilled 5-7 days wells, worked with Justin stones (Drilling Operation manager), Micheal Arispe
(Senior Engineer), Dan Disser (Senior Engineer). They offered a letter of recommendation if requested. Our main objective was no accidents and spills. Drilled 13,000’-15000’ wells 7500’-8000’ tvd. 2006 –2013:
Rig Manager for HP drilling the last 7 years w/ the same Operator Anadarko.
Work w/ Different Well site Supervisors, Kenny Allen, Harlan King, Allen Frazer, Travis Bradford, Ronald Jackson, Butch Cherry, Sammy Bell in the. Eagle Ford Shale,
Worked for 2 years in West Texas as a Rig Manager with Operator Rep. Mike Coker, Supervised by Bill Ridling
Supervised high pressure gas wells Rig Hands on Rig 246
Started working for Anadarko in Star County, with new personnel (50% had NO oilfield experience)
1998 – 2006:
Nabors Drilling USA, Lp., Rig Manager: Supervised rig, and employees
Operated rig area of cost and budget.
Supervise & operate first Can rigs top drive
Rig Manager for different Operators in Conoco, El Paso, Amerada Hass, Shell, Enron
Rig Manager on Nabors 726; the operator was Total Fina in Hidalgo County, drilling in Mcallen, Pharr, and Mcoock, utilizing city power to operate rig. 1986 – 1998:
Delta Drilling Rig Manager
Driller- Drilled on all types of rigs in all types of wells from 8,100’ wells to 20,000’ mud wells (gas wells)
Supervised 4-5 man crews; drilled all around South Texas from Zapata County to Zavala County
Rig Manager for Wells Drill for UPRC horizontal wells in the Austin chalk
Supervised crewmembers drilling using skimmer tanks from Round Top, TX to Brenham, TX in Washington County.
Drilled on all size & type of rigs up to 3000hp
Rig Manager on wells drilling in downtown McAllen, TX.
Operator Total Fina over 2 years- Responsible for 4 & 5 crewmember’s safety
& accomplished tasks as directed by operator. Responsibilities included servicing all equipment needed and followed directions. 1976 – 1986:
Loffland Brothers Floor to Driller; started drilling in 1980 in Zapata County; followed rig all over Texas
Drill and Supervised 1500 to 2500 hp rigs
Successfully Managed and Drilled wells for various Operators
Rig Manager on HP drilling rigs; last 7 years flexed 3 rigs w/ skid package
Over 30 years working in the oilfield, I have managed to move up from working floors to Well Site Supervisor or Company Man
Worked on 1500 to 2500 hp rigs, top drives can rig, Tesco, Varco TDS 11
Familiar/troubleshoot AC, SCR, VFD, MCC, Ross hill, Omron, IPS,V-ices General electric, PDS pipe delivery System, rig up/down Helmerick & Payne 100’ skid system
Strong leadership in well control & hole problems, plan & direct rig moves EDUCATIONAL AND PROFESSIONAL EDUCATION:
Brenham Tx. High School
Leadership Training & Management Skills
Continuously remain current with industry standards for BOP, Safety, H2S, First Aid.
RMS HP Rig Management Skills
HPL HP High Performance Leadership
Randy Smith leader training- pipe stuck prevention
Well control training since 1984
Bilingual: Fluent in Spanish Language (read & write)
Safe land training
H2s training