EDUCATION Elizabeth Orr

**** */* ***** ***** Saint John

New Orleans, LA 70119

504-***-**** cell acqkdg@r.postjobfree.com

B.E. Civil Engineering (Structural Emphasis), Vanderbilt University, 1990

CAREER EXPERIENCE

Tidal Basin Government Consulting - 2013 to 2014

Technical Specialist Santa Rosa County, FL

One of two employees representing the County on the Recovery program after the 2014 Spring Flood. Concentration on road repairs and rebuilds, including approval of Hazard Mitigation measures for use of limestone sub base in lieu of clay as originally constructed.

Public Assistance Consultant New York City, NY

Developed Direct Administration Cost (DAC) staffing plan until completion of FEMA program for all NYULMC departments, anticipated total DAC reimbursement for the Applicant is 35 million dollars as of 2014. Assembled all DAC reimbursement submittals.

Ericsson (contractor) - 2012 to 2013 New Orleans, LA

Construction Manager

Manager responsible for review and approval of all engineering design and construction subcontractor tasks related to 4G install of 70+ SprintPCS cellular sites in the New Orleans Market, ensuring the installations reduced any potential site disruptions. 4G Long Term Evolution (LTE) install included replacement of all radio equipment, installation of new antennas, new hybrid cable, and new tower mounted Remote Radio Unit (RRU) installations (min. 3 RRUs/sector). Moved to Central Louisiana market to oversee 110+ LTE sites.

Conducted site inspections and developed punch lists for new and previously completed sites in Central Louisiana, coordinated with clients’ QA/QC team and contractors to ensure completion of all punch items without disruption of site during peak transmission hours.

Stuart Consulting Group - 2011 to 2012 New Orleans, LA

Program Manager

Team Lead on all FEMA recovery and Hazard Mitigation work in City of Slidell, over 50 million dollars in Federal funds; Development and oversight of all weekly progress reporting to FEMA/State, and monthly progress reporting to Mayor and City Council Executive Committee. Increased federal funding of Katrina affected infrastructure reimbursements to the City by over 4 million dollars.

Coordinated and reviewed all requests for reimbursement on eligible repair scopes, including contact with FEMA/State, client, engineers, contractors, and any third party reviewers to ensure requests complied with The Stafford Act.

MWH Global (contractor to employee) - 2008 to 2011 New Orleans, LA

Sr. Project Manager

Sr. Project Manager for City of New Orleans Katrina Recovery Program. Oversaw the contracting, architectural, and engineering design for 13 sites while supervising 3 MWH Project Managers; Site construction costs ranged from 2 million to 18 million dollars.

MWH local expert on effects of flooding caused by corrosive water on structural building members. Oversaw engineering study on building member corrosion requested by the City of New Orleans.

Quality Assurance/Quality Control (QA/QC) Manager tasked with implementing procedures and processes developed for the MWH City Recovery Program into a model for the Orleans Parish Sheriff’s Recovery Program (OPSO).

Reviews of all revisions of contract documents and specifications for comparison to each bid package in order to notate all discrepancies found in engineering drawings, specifications, and bid clarifications per request from OPSO legal.

Walt Disney Imagineering (contractor) - 2007 to 2008 Anaheim, CA

Construction Manager

Owner’s rep field construction manager for 75 million dollar expansion of luxury hotel on resort property which included an underground parking garage, 200 additional luxury hotel rooms, 50 Disney Vacation Club suites, additional pool, and spa.

Implemented daily job calls with hotel owners’ representative in order to minimize any disruption to existing hotel operations; Coordinated all utility shutdowns and access for construction, led contact with all engineers, architects, and inspectors regarding scheduling, phasing of work, status of jobsite construction, and all inspections.

Responsible for completion of all owners’ daily job reporting including daily site photo documentation; Reviewed daily reports from all contractors and inspectors; Kept as-built record; Logged, reviewed, and prioritized all RFIs to reduce any delays; Ensured general contractor adhered to Disney specifications and regional and national standards, including OSHA and Cal/OSHA requirements.

Worked with contractor to reduce any delays in scheduling or phasing of work due to changes in site conditions or unforeseen issues. Participated in weekly scheduling meetings with both Disney and contractor management; Ensured change orders conformed to actual on site conditions, met all contract requirements, and reduced any delays, particularly related to critical path milestones.

SAC Wireless, Inc. - 2004 to 2007

Program Manager Laguna Hills, CA

Managed San Diego, Central Coast, and Las Vegas markets for SprintPCS/Nextel turn-key consolidation project; supervised 11 employees who aided with this task. Met all 2006 construction goals in each region. Authored training/procedure manual.

Construction Manager /Nextel Irvine, CA

Tracked, reported, and resolved all leasing, zoning, and construction issues for 50+ expansion sites in the Los Angeles Market. Was sole employee remaining on project after managerial decision to scale back operations.

Valiant Products - 2003 Denver, CO

Project Manager

Responsible for on-time design, purchase, manufacture, delivery, and installation of goods to hospitality industry clients, supervising 18 renovation projects from 15 thousand to 1.2 million dollars; Installation scheduled to reduce any disruption. Coordinated design, bid, permitting, and pre-construction of relocation of existing furniture manufacturing facility from Salt Lake City, Utah to Denver, Colorado.

Spectrum/Seattle LLC - 2001 to 2002 Seattle, WA

General Manager

Team Lead managing 7 employees who supervised SprintPCS sites in Washington. Scope included site feasibility walks, construction drawing reviews, permitting, bid/pre-con walks, construction supervision and database entry of all site construction milestones.

Subsequent to installation at GM position, project team increased the number of sites on air per month by 30 percent on average.

SprintPCS - 1997 to 2001

Wireless Implementation Manager Los Angeles, CA

Responsible for all construction milestones in the largest market for SprintPCS with over 700 sites funded and in design or construction phase in Los Angeles, Orange, Ventura, San Bernardino, and Riverside counties. Contracted, hired, and trained four construction management firms to support this build-out. Supervised 5 SprintPCS employees and 25+ contractors on this program.

Reduced average construction timelines in counties listed above from 60 days to 40 days.

Senior Wireless Implementation Engineer Los Angeles, CA

Responsible for all milestones of site development including leasing, zoning, permitting, bidding, and construction. Trained all contractors and 7 Implementation Engineers for transition from Cox to SprintPCS after SprintPCS purchase of Cox cellular.

Washington D.C/ Baltimore, MD

Trained all former APC personnel after SprintPCS purchase of APC, as well as new hires, to comply with SprintPCS requirements. Authored Pre-Construction Process and Co-location Drawing and Construction Guidelines for carriers installing on SprintPCS towers.

Richmond, VA

Promoted to Sr. Engineer after departure of Implementation Manager 4 months before launch, meeting all project milestones and timelines including initial launch date. Utilized a staff of 9 Implementation personnel to aid with this goal.

Wireless Implementation Engineer Richmond, VA

Project engineer responsible for managing the lifecycle of 47 cellular sites through 1-A surveys, FAA assessments, geotechnical investigations, environmental assessments, architectural and engineering design, construction, utility installation, and interconnection.

International Paralympic Committee - Summer 1996 Atlanta, GA

Envoy

Acted as liaison and French-English interpreter for the special-needs athletes of Burkina Faso, their representatives, and the Paralympic

Committee.

Coordinated event registration, transportation, cultural interfacing, and acquisition of necessary equipment and training facilities.

Peace Corps – 1992 to 1993 Republic of Congo, Central Africa

Water and Sanitation Technician

Responsible for the evaluation of community interests, needs, and land features for the design and construction of water and sanitation projects utilizing local resources and manpower. Work included construction of VIP latrines and dam repair and construction.

Duties included fundraising in local communities for project material costs, the administration of records and processes, and developing a training program for future use by Congolese Nationals. Service ended after one year due to civil unrest and evacuation.

ADDITIONALINFORMATION

Computer Literacy: Primavera P6, Visio Technical, Adobe Photoshop, Microsoft Office/Project/Access

International: former daily usage of French (1992/1993), conversant in Spanish, resided/worked in Africa and South America

Certifications: Engineer-In-Training (EIT)/1990, OSHA 30 hour safety course, 2010 LEED Green Associate course completion

References available upon request