Mr. Rauseo has over 22 years of experience overall in Civil Engineering, including the last 11 years in Construction Engineering Inspection Services (CEI) in the State of Florida, USA. He has participated and been responsible for most interdisciplinary phases of quality control, management assistance and field operations of major roadway/bridge projects.

BS Civil Engineering, I.U.P.F.A.N, Venezuela, 1992. 108 Credit Hours Civil Engineering School: University of Florida, Gainesville, Florida. 1985-1986. Engineering Associate in Arts Degree: Manatee Junior College, Bradenton, Florida.1983-1984. CTQP Asphalt Paving Technician - Levels 1 & 2 Troxler Safety Training CTQP Earthwork Construction Inspection - Levels 1 & 2 ACI Concrete Field Testing Technician Grade 1 CTQP Concrete Field Technician - Level 1 Stormwater Management Inspector CTQP Drilled Shaft Inspection MOT Intermediate & Advance CTQP QC Manager CTQP Final Estimates Level 1 & 2

ACI Concrete transportation Concrete Transp. Level 2 CTQP Pile Driving Inspection Hazmat Certification Critical Structures Construction Issues - Self-Study Course Civil Engineering Unit Coast Guard, Miami, Florida-Professional Engineer Design Support (April 2015 to Present) Contractor: Strategic Management Solutions, LLC; Employer: Bolton Perez & Associates – Miami, Florida Full time onsite assignment to provide assistance in performing quality assurance reviews, developing draft plans and specifications, and reviewing contracting documents being readied to be issued to the Contracting Branch, provide administrative support to the design and engineering team, under the direction of the Civil Engineering Unit Technical Director, review procurement documents (plans & specifications) for completeness and accuracy. FDOT District 6– Bridge Grouping Project-Rehabilitation program –Contract support Specialist (Feb- April 2015) Employer: Bolton Perez & Associates – Miami, Florida Exercise independent judgment in planning work details and making technical decisions related to the office aspects of the project, Prepare and process progress / final pay estimates and construction contract changes. Track submittals, plan revisions, and requests for information. Input data into the Site Manager and Laboratory Information Management System (LIMS) programs. Assist with Equal Employment Opportunity (EEO) and labor compliance. Maintain project files. Receive general supervision from the PA and Senior Project Engineer. FDOT District 6– Bridge and Overhead signs Inspection Contract-CBI support (October204 - January 2015) Employer: Bolton Perez & Associates – Miami, Florida Mr. Rauseo performed inspection support on Overhead Signs, In-Service Bridges, Mast Arms and High Mast Structures. Inspection methods complied with federal regulations in accordance with National Bridge Inspection Standards (NBIS) and following AASHTO Guide Manual for Bridge Element Inspection. Management support included performing inspection reports according to the National Bridge Inventory Standards (NBIS) and using PONTIS application software.

Miami Dade Transit- Lehman Center Test Track & Yard Rehabilitation - Expansion Phase 1, Miami, Florida Field Engineer assistant and Construction Sr. Inspector (July – Sep. 2014) Qualifications and Certifications

Education

Project Experience

Registered Professional Engineer,

State of Florida # 77577

Tin # R250013644620

14911 SW 80 St Apt 204

Miami, Florida 33193

786-***-****

acqjfj@r.postjobfree.com

Alfredo Rauseo, PE Page 2 of 3

Employer: Bolton Perez & Associates (Parsons) – Miami, Florida

$14.5 Million project to construct a new test track (2,500 feet long) and $10.6 Million project that will construct five storages and two maintenance of way (MOW) tracks; both at the existing Metrorail Lehman Center Facility. Mr. Rauseo was part of the Quality assurance group, led by Field Engineer Derrick Chang from Parsons, during Final stages of the Civil Construction. Responsibilities: Field inspection of Train Tracks and Service Building Construction. Contact: Malka Rodriguez (MDT Construction Manager III: acqjfj@r.postjobfree.com) & Derrick Chang (Parsons 786-***-****)

MDX –SR 874 Mainline Reconstruction- Work Program No 87409.050, Miami Florida - Bridge and Roadway Sr. Inspector (Sep. 2012 – Jun. 2014)

Employer: Bolton Perez & Associates – Miami, Florida

$46.4 Million Design-Build, it consisted in the widening of a 3.3 Mile segment from 4 to 6 lanes. Main characteristics included 10 bridges widening and retrofits,15000 +SF of MSE walls, 19’ and 14’ noise walls, overall lightning, drainage improvements and milling and resurfacing of entire segment Contact: Jose Morales, PE, Sr. Project Engineer 786-***-**** FDOT District 6– NW 27th Ave from NW 11th Street to NW 43 Terrace. Milling & Resurfacing Project. Senior Roadway Inspector (June 2011 – August 2012)

Employer: Bolton Perez & Associates – Miami, Florida Milling and resurfacing project with sidewalk and curb reconstruction along with drainage improvements. Mr. Rauseo is responsible for all field inspection and keeping track of all documentation as to guarantee both the construction and final estimates process. Contact: Ivan Hay, PE FDOT District 6-305-***-**** FDOT District 6 North Dade CEI Residency – NE 82nd St from SR 5/ Biscayne Blvd. to NE Bayshore Ct. Roadway Improvements Senior Roadway Inspector (April 2011 – June 2011. Employer: Bolton Perez & Associates – Miami, Florida Milling and resurfacing project with sidewalk and curb reconstruction along with drainage improvements and guardrail installations. Mr. Rauseo is responsible for all field inspection and keeping track of all documentation as to guarantee both the construction and final estimates process. Contact: Ivan Hay, PE FDOT 305-***-**** FDOT Turnpike Enterprises -All Electronic Open Road Tolling Conversion - Roadway Inspector (2010 – 2011) Employer: American Engineering Group, Inc.

Project consisted on demolishing existing toll facilities and installing open road tolling structures. The project included the drilled shaft construction, gravity walls, guardrail installations, milling and resurfacing operations, drainage improvements, and general building construction activities for the new building facilities holding all electronic equipment for the toll collection system. Contact: Sr. Project Engineer Willy Garcia, PE 305-***-**** FDOT District 6 - NW 5th St. Bascule Bridge Construction - Senior Roadway Inspector (2008 – 2010) Employer: Bermello & Ajamil Construction Services (ba), Miami, Florida The work consisted on the relocation of utilities and installation of new water and sewer system. 1 mile of Roadway reconstruction, 3 MSE walls, a sheet pile wall, 6 gravity walls. Asphalt with polymer placement. Mr. Rauseo was responsible for flatwork operations including sidewalks, curbs, and ADA ramps. Lightning and signalization, including drilled shaft supervision, landscape, railings, striping and fencing was also part of Mr. Rauseo’s duties. The final delivery of project including final estimate process, field books and quantities entry in Lims System. Contact: Sr. Project Engineer Art Perez, PE 786-***-**** / Project Administrator Evelio Hernandez

786-***-****

FDOT District 6: 12th Avenue / SR 933 Bascule Bridge Construction - Senior Roadway Inspector (2006 – 2008) Employer: Bermello & Ajamil Construction Services (ba), Miami, Florida This Project required Mr. Rauseo to coordinate and monitor 8 MOT phases scheduled for this project. Project entailed 4 MSE walls with temporary wire walls. Mr. Rauseo had to coordinate roadway operations for drainage installations with utility owners as well as business and building owners as well as asphalt inspection operations. Mr. Rauseo was also assigned inspections in bridge construction, such as the supervision of electrical and Alfredo Rauseo, PE Page 3 of 3

mechanical operations, coating, bolting, railings, and control tower finishing and submarine cable installation across the river using directional boring. Contact: Sr. Project Engineer Art Perez, PE 786-***-**** FDOT District 4 - SR 820 / Hollywood Bridge Rehabilitation - - Senior Bridge Inspector (2006) Employer: Bermello & Ajamil Construction Services (ba), Miami, Florida Challenging rehabilitation project as an overhaul to the whole system bridge and road components; including bridge metallic structure, mechanical and electrical components, new control towers and roadway structures such as architectural railings, guardrails and barrier walls. Other aspects included whole coating rehabilitation and removing existing lead paint. Reinforced concrete quality control, including sampling and testing such as pull test operations were also performed. New signing, drilled shafts and architectural detailing included. Mr. Rauseo took care of environmental control duties, due to operations on the intercostal waters; including erosion control and manatee watch. Contact: Project Administrator Evelio Hernandez 786-***-**** FDOT District 4 - SR 870 (Commercial Boulevard) from SR 845 (Powerline Road) to NE 19th Avenue Sr. Roadway Inspector (2005 – 2006)

Employer: F.R ALEMAN & associates, Miami, Florida

Complete rehabilitation of 2 mile long road, including road widening under state road I-95. Construction of retaining walls included geotechnical operations such as anchoring systems on existing embankments. Mr. Rauseo supervised the reinforced concrete operations for this operation as well. Roadway widening operations included embankment, stabilization, base and asphalt, as well as sidewalks, curb and gutter and traffic separators. Lighting and signalization needed drilled shafts and directional boring. Mr. Rauseo was also involved in the traffic control, environmental and utility relocation operations.

Contact: Sr. Project Engineer Arturo Perez, PE (786) 251- 8059 DERM- FEMA – Drainage Improvements on Miami Dade County - Miami-Dade County Roadway Inspector (2004 – 2005)

Employer: EBS Engineering INC. Miami, Florida

Review and interpret plans, site layouts, specifications, and construction methods to ensure compliance to legal requirements and safety regulations. Inspection and monitoring of construction site to ensure adherence to management of traffic standards. Inspection of drainage structures; materials to determine soundness, and compliance with specifications and standards. Maintain daily logs and supplement inspection records.