CONSTRUCTION PROJECT MANAGER
Extremely capable individual who has substantial knowledge and experience of directing, managing and
monitoring of various scale civil engineering projects.
Engineer, planner, builder and developer with diversified experience in several engineering fields. 25 years
construction experience.
AREAS OF EXPERTISE • Bidding • Project management • Financial management
• Planning • Cost control • Business development
• Budgeting • Programming • Schedule coordination
• Accounting • Purchasing • Estimating
EDUCATION Civil Engineering, Univesidad Javeriana, Bogota, Colombia. Bachelor Science
Executive Certificate in Project Management (PMP). Florida Atlantic University. FAU
LICENSE General Contractor No. CGC1509840 (Florida 2005)
LANGUAGE English/Spanish
SKILLS Analytical, innovative, organized, motivated, calm, logical, clear thinking,
Accounting, Finance and Economy, Project Evaluation.
Computers: Software Microsoft Office, Word, Excel, Power Point, Microsoft Project,
QuickBooks, AutoCAD, Sketch Up, OneNote, Outlook, TeamViewer, skype, Adobe,
Street and Trips.
EXPERIENCE Vicepresident
TEYCOSA LLC, Weston _2014-present)
Remodeling Projects
Manage all aspects of construction projects, submitting bids, creating budgets,
scheduling construction and overseeing field operations. Direct personnel operations,
conduct hiring, manage staff. Schedule subcontractors and develop criteria needed
for subcontractor assignments.
Project Manager /Superintendent
ENTEK CONSTRUCTION, Miami (2014)
Luxury Estate home
Manage all aspects of construction projects, luxury homes, scheduling construction
and overseeing field operations, task coordination. Direct personnel operations,
conduct hiring, manage staff. Schedule subcontractors and develop criteria needed
for subcontractor assignments.
Task developed: Excavation, land leveling, Foundation, reinforcing bars, Installing
sewer lines, Inspections, concrete blocks, plumbing, electric network, Air
Conditioned A/C network, masonry, Pipework, low voltage, carpentry, closet,
baseboard, framing, finishing, drywall, paint, Crystal shower, Mirrors, Marble, tile,
Wood floors, doors, Hurricane Impact Windows, tile bathrooms, stone columns,
Furnishing, Septic Tank, sprinklers, stainless steel kitchen, BBQ, Landscaping,
Garage doors, stairs, Iron doors, Roof, Gas network, gas tank, lights, Swimming
Pool, Stone pavers, Baby fence, PVC Fence, Chain Fence, Punch-out, paving, lawn,
Appliances, marble countertop, iron railings & Chicago Pavers Driveway.
Project Manager
CONDOMINIO LA TOSCANA, Sopo, Colombia - (2012-2013)
Infraestructure community Estate Homes
Manage all aspects of construction luxury homes projects, including initial designs,
acquiring permits, submitting bids, creating budgets, scheduling construction and
overseeing field operations, task coordination. Direct personnel operations, direct
heavy machinery, conduct hiring, manage staff. Schedule subcontractors and
develop criteria needed for subcontractor assignments.
• Infrastructure “Condominio La Toscana” project of 2’500.000 sqf
Roads, sewer, wastewater, storm water, electrical network, sidewalks, curbs,
sinks, concrete pavers, plant wastewater, electrical substations. Earthmoving.
Condominium of 63 luxury houses 3500-4500 sqf/house 65 MM.
Achievements: Reduced cost by 24.1% in $700.000 of $2.900.000
investment during 12 month. negotiated with suppliers and subcontractors,
and improved yields personnel and heavy equipment. Revised a more
efficient electric and hydraulics designs.
Project Manager
IDEAS Y PROYECTOS S.A. – Colombia (2011-2012)
Structuring of commercial and residential real estate projects.
Regulations in northern Bogota were studied and areas of interest were defined
to develop condominium projects, stratum 4 and 5. Building Department was
consulted.
Lots that meet the conditions were sought, an analysis of the batch and batch
potential was realized, budgeting and programming of work were defined, an
economic and financial study was conducted with study of supply and demand to
determine the feasibility of the project. Risk analysis of the project was
performed and how it affected the budget.
EXPERIENCE ADDITIONAL Project Manager
MORE THAN 4 YEARS TEYCOSA LLC Weston, FL (2005-2011)
Remodeling Projects
Manage all aspects of construction projects, submitting bids, creating budgets,
scheduling construction and overseeing field operations. Direct personnel operations,
conduct hiring, manage staff. Schedule subcontractors and develop criteria needed
for subcontractor assignments.
Manage projects realized financial analysis, negotiating lots, Structure and evaluating
new projects to build warehouses, office buildings, residential buildings, hotel
buildings, shopping centers and community house projects.
Project Manager
TEYCO S.A. Neiva, Colombia (1990-2004)
Commercial, residential and civil construction Projects
Conducted all project related operations including organizing job sites, developing
schedules, submitting bids, creating budgets, and overseeing field operations.
Maintaining quality control, ensuring projects were completed on time and on budget
. As Construction Manager, oversaw all superintendents, in addition to conducting
the hiring.
Among others the following projects were built:
• Bayer Pharmaceuticals Warehouse and office
• Aventis Pharma Warehouse and office (2 buildings)
• Terpel Oil Company Infrastructure Industrial Park 1.100.000 sqf 3.8MM
Warehouse-Office (1 building)
4 Gas Stations
• Triacon Ltda. Warehouse-Office (1 building) 8000 sqf 0.4 MM
• Building “ Hotel Holiday In Bogota” project of 250.000 sqf, piles, metal
structure, 13 stories, 360 suites, Bogota, Colombia. 250.000 sqf 7.0 MM
• Building "Cafam Supermaket" Project of 125.000 sqf, shoe foundation,
concrete structure, basement, 3 stories. Colombia 125.000 sqf 3.75 MM
• "Casa de Campo" of 14 houses and club house. 2500-4200 sqf/house
Colombia. 1.000,000 sqf 6 MM
• Building "Montepinos" 5 stories. Bogota, Colombia 20.000 sqf 2 MM
• 3 concrete Channels Himat Colombia.
• 3 Aqueducts “SOP del Huila” Colombia.
• Bridge Steel L 600 Ft
• Bridge concrete L 300 Ft.
• Box Culvert
Achievements: built a Gas station, with office, wash station in 30 days under
budget. Time record in this sector.
ADDITIONAL EDUCATION
Courses: OSHA Certification
Project Management
Wind Mitigation Methods
Overview of Building Contractor Operations.
Advance 2004 FBC-Building/Structural
Wind mitigation strategies for protecting openings
Making Job-site safety profitable
Financial Basics for Contractors
Florida Construction Regulations
The Estimate – Where cost control begins