Luis A. Itriago
**** ********** **. **** # ***, Dallas, TX 75206 –USA
Phone: 214-***-****/ 214-***-**** Email: acqi96@r.postjobfree.com
SUMMARY
I possess over 36 years of experience in the downstream sector of the oil and gas industry. Seasoned Professional with wide experience in management, with national and international organizations. Creative problem solver with ability to drive working team members to execution commitment.
High Background as process engineer, design engineer, Project and Engineering Manager, operation supervisor and Operation Manager, for Gas processing Cryogenic plants, including, gas treating, cryogenic Temperatures liquids recovery (C3+) and Gas Methane Liquation (LNG), Liquids fractionation, storage and delivery, sales of Gas. Also as Commissioning and start up Manager. Knowledge of General Specs ( OPERCOM Methodology) and Commissioning Control Software called ICAPS belong to TOTAL Oil&Gas French Company.
Proficient Professional with high experience in oil Refineries, in process as atmospheric distillation, Catalytic Cracking, Alkylation, LPG. Also in Petrochemical Process and Gas Processing
Experience include LNG projects design in Venezuela (Conceptual and Basic Engineering), and the biggest LNG trains (2) in Qatar (Raslaffan Industrial area) 8 MM Tons/year per train. Also as LNG consultant in Bolivia to monitor Engineering, Construction, Precommissioning, commissioning, start up and performance test for a new YPFB Plant. This include work with Cryogenic Process Through Expander, Cold Box, and 3 refrigeration levels, getting temperatures from – 45 F up to – 161 C for obtain NGL and LNG.
Design for underground Gas piping through long distance public spaces, underground pipe laying under international and national specs, piping protection and coating, Right of way, rules for routing, piping security strip, remote valve station and supervision,etc.
Solid background in planning coordination and execution of multidisciplinary facilities projects, field engineering, construction coordination, contract administrations, specifications and bids packages preparation and evaluation.
Work experience includes Process Engineering, Plant Operation, Design, Project Manager, Construction coordination, Commissioning and Start up; Project and Training Manager specialized in natural gas. I’m knowledgeable about process engineering, health, safety and the environment.
I’m proficient in enhancing productivity levels and introducing process improvements. My main achievement during my career is making “NO ACCIDENT” my first priority. Other achievements bring deliveries and milestones on time or before, thus saving project cost and getting production in advance.
CAREER HIGHLIGHTS
Engineering Manager for new businesses (1999-2003). Reviewed Gas field developments in Anaco and Punta de Mata (Venezuela) for the design of new Fractionation and Extraction plants. Conducted technical- economical analysis (Gas, VAN, TIR). Prepared bidding process for execution of EPCC (ACCROVEN Project). Supervised all EPCC process up to successful start-up of plants in 2002 (800 MMSCFD/ 1500MMUS$ Cryogenic Extraction plant and 50MBD/1000MMUS$ Fractionation Plant). Analyzed new development to Furreal and Pirital field Gas reserves. Prepared all required bidding specifications for new extraction (1000MMSCFD) and fractionation (100MBD) plants.
Involved in Design criteria and basis for LNG project, conceptual and Basic engineering, in Venezuela, related to technology, plant location, feed and markets. Execution of FEED.
Involved as Responsible in monitoring as specialist consulter, in engineering, construction, commissioning, start-up and LNG project and hand Over of the project to the client YPFB in Bolivia.
Design revision and approval, right of way completion, to start up 300 Km 30” NGL underground pipeline
Between extraction and fractionation plants. Successful achievement.
Safety Manager. Lowest Safety Incidents Award two years in a row (1998, 1999) in PDVSA Gas. No accidents due to excellent preventive strategies implemented. Operations included a gas pipeline network (5000 Km) and gas plants (1800 MMSCFD, 130 MBD) with over 5,000 workers.
Start-up Manager and Operation Manager for the Santa Barbara Extraction Plant (1991-1996). Reached $7MM advanced profit on commissioning and start-up through the use of construction strategies in parallel with commissioning activities. Obtained 1.4 million of LNG production in advance. Successful achievement for accomplishment of production and Budget plans every year, including Investment plan execution.
Preparation and execution of safety procedures and training requirements for operators and engineers. Developed operations, commissioning, training, and start-up books. Result success plants start up.
Preparations of first time GLP load procedures for GLP facilities to receive storage and delivery by bottles and trucks. Lead in commissioning and start up activities in ECUADOR (Guayaquil-Monteverde)
DESIGN EXPERIENCE
FEED Revision. Execution, revision and approval of engineering detailed drawings. Design of underground, aboveground, Piping and routing calculations. Equipment calculations (fractionation towers, vessels, compressors, exchangers, pumps, flare and network release including blow down, others), instrument control loops improve recommendations for the Jose fractionation plant (100 MBD of NGL, 2.5 MMUS$) and Santa Barbara extraction plant (50 MBD of NGL, 800 MMSCFD, 2MMMUS$). PDVSA-Venezuela.
Revision and approval of engineering detailed drawings, equipment design and control loops for commissioning test and startup in a Gas recovery plant (150 MMSCFD/ 10 MBD condensate/ 600 MMUS$). ARAMCO-KOC in Abudhabi.
Calculations and developed engineering detailed drawings for Tecnicas Reunidas EPC. ADNOC project in Abudhabi. Polyethylene and Polypropylene plants (2MMTY and 4MMTY/ 3MMUS$).
Design criteria, engineering detail and calculations revision in a LNG plant (8 MMTY/ 5MMUS$) for Qatar Gas in Qatar. Improvement in rotating equipment loops to facilitate precommissioning, commissioning and start up activities.
Experience from conceptual engineering up to detail engineering, including pipe line routing, layout, plot plan and required safety area of the facility.
WORK EXPERIENCE
October 14- February 2015 Commissioning Manager in FO TOTAL Team. Incahuasi Project Bolivia,
Using OPERCOM Methodology and ICAPS for preparation and execution of Precomm and Commissioning .
Prepare all Internal commissioning Documentation for TOTAL Field Operation Management group, Internal guide- rules Doc, about Roles and responsibilities and interactions with PMT (Project Management Team), Commissioning execution plan, mobilization plan, Hand over procedure, Startup sequence, etc., review and approval of Comm Docs. Prepared for EPCC Contractors (Precomm and comm. Engineering Docs.). Order and prepare procedure about all project phases completion, with requirements and formal documents and certificates, establishment of startup sequence integrating all contractor package, coordination meetings with contractors, advance revision and request, System and subsystem revision. Project Budget 1500 MM US $, Gas VOLUME conditioned 20 MM m3/D, condensate Production 7000 MBD, established in three Project Phases. Mobilization by TOTAL instruction for oil price down and freezing of some projects, staff TOTAL employee were available.
October13- sep 14 LNG Consultant in Bolivia. Bureau Veritas-YPFB, FISCAL(Monitoring) Manager Monitoring from engineering phase, construction, precommissioning, commissioning, start up and performance test, to
validate, specs and quality accomplishment of the new LNG, plant in Bolivia, to be
certificate the contractor payments by specials document signed as approved and
accepted the plant quality and performance.
April 13 – Sept. 13 Lead Process for GLP facilities Commissioning Ecuador. Leader to conduct
commissioning and Start up activities in Guayaquil Ecuador for 2 LPG plants and 125
Km X 12” Underground piping, previous design specs and quality of construction
revision, to receive, storage and delivery by bottle and trucks.70 MBD LPG, 400 MM
US$. Including utilities as firefighter system, power distribution, flare, air, water,
treating close drain, etc.
June 12- March 2013
March12-May 12
March 10-March12
April 09 -FEB 10
Project Manager. In ProU (Process Unlimited International) Bakersfield- California. Managing Oil production engineering design, facilities and piping, including water disposal and Gas processing. Including all required info for construction permits. Projects engineering up to 1 MM US$, Oil production up to 25 MBDO, Water production up to 300 MBDW and 80 MMSCFD wet gas. This includes all utilities system required.
Commissioning Manager Responsible for all Commissioning plan preparation and start up execution(System, subsystem, engineering revision, required workers, budget, field procedures and safety, Document procedures up to hand over, using TOTAL Opercom procedure and activities advance program, ICAPS) including engineering support to facilitate commissioning activities for a new 300 MMSCFD gas conditioning plant( sweetening, dehydration, sulfur recovery, using amine and glycol loop circuit) for Industrial and domestic market and 10 MBD NGL recovery in yucal placer Venezuela-TOTAL. Project cost 800 MM US$. Hire Company: ENGINEXT USA. Giving priority to start up in advance all utilities systems related with the Gas processing facilities. Mobilization for disagreement between TOTAL and PDVSA, about investment participation and price of Gas conditioned.
Independent Consultant. For design, Gas network industrial and domestic distribution. Private support for gas Plant shutdown, maintenance, startup in VENEZUELA. By temporary contract.
PMC Superintedent, Technip-Chiyoda, Qatar. LNG Cryogenic Plant
Responsible for the execution of all required activities for start-up certificate. This included blowing, flushing, leak test, chemical loading, black start-up, drying, and other related methods of pre-commissioning.
Highlights: 2 LNG trains 8 MM Tons years, each, 5 MMM US $.
Supporting and improvements to Process engineering team as commissioning process engineer.
Revision of FEED documents, and issued comments for design improvements under client satisfaction. Planning Execution in parallel, Long lead items, Fractionation start up procedure.
Revision of equipment and systems with Qatar Gas (client) for the handover to be accepted. Beginning start up with all utilities and off sites systems brought all of them in normal operation before start up gas process systems.
Mar 07 -March 09
Project Manager – Tecnicas Reunidas EPC, Borouge-UAE
Managed development of engineering and construction activities for the Borouge 2 Project (ADNOC) - Expansion of Ethylene and Propylene plants (2MMT and 4MMT per year plus utilities system, a 3 Billion US$ project.
Highlights:
Reported to Madrid Board Managers for the development of the new detailed engineering for Borouge2 (EPC contract). Execution of Engineering on site condition the existing Plant in advance
Revision and correction of detailed engineering on site through mark-up to provide feedback to Madrid.
General supervision of weekly statements by discipline departments and completion of the final report.
Oct 06 – March 07
Pre-Commissioning & Commissioning Advisor – Aramco-KOC, Abudhabi-UAE
Responsible for the development and execution of all technical preparations for pre-commissioning, commissioning, start-up, training and acceptance test, including technical support to the engineering team for the AlKhafji project, Saudi Arabia for gas and liquids recovery and all associated utilities systems . 500 MM US$, 150 MMCFD of gas.
Highlights:
Deliverables were executed under high standards for health, safety and environmental concerns, schedule, resources and budget compliance.
Revision of the detail engineering drawings to recommend commissioning requirements.
Aug 04 – Aug 06
Commissioning Site Leader – TOTAL, Neuquen, Argentina
In charge of preparation and execution of commissioning plans. Execution of activities for the handover to be accepted by the client (TOTAL). Using OPERCOM Methodology and ICAPS Software.
March 79 – Feb 03
Process / Operation /Superintendent/ Manager Engineer, PDVSA (Venezuelan Oil Company), Anzoátegui, Venezuela.
Starting in PLC oil Refinery and EL CHAURE Refinery, supervising Process distillation, Cracking, Alkylation, LPG recovery and Distribution, etc.
Supporting Ammonia, Urea and MTBE, petrochemical Plants, during some revamping and Start Up.
Project Manager and operation Manager during more than 15 years managing all Cryogenic Process to get NGL, Gas treating, extraction, fractionation and delivery of NGL and Dry Gas, in Jose fractionation plant, San Joaquin extraction plant, Santa Barbara Extraction Plant, ACCRO fractionation Plant, ACCRO Extraction Plant. From 1979 up to 2003. This includes all Utilities Facilities required to support gas processing. Utilities area conformed by : Fuel Gas System, Flare, Firefighter, water treating, air, burn pit, power generation, steam generation, close drain, etc.
EDUCATION
2001 Post Graduate Degree: Handling and Organizational Control - CIEDIS- Venezuela
1980 Certified: Chemical Engineering Specialist (Post grade) - Universidad de Oriente, Venezuela
1978 Bachelors of Science in Chemical Engineering, Universidad de Oriente. Venezuela.
2013. Training course about LOTO procedures and application.
OTHER SKILLS
Bilingual: Fluent in Spanish and English.
Leadership: Able to direct and lead in any given situation.
Technology: Proficient in Microsoft Word, Excel and Power Point to. Proficient in various Engineering software.
Team Work: Shows respect for other team members. Communicates and motivates team to achieve higher results.
Diversity: Worked with people from many different cultures and backgrounds.
ASSOCIATIONS : 1) Colegio Ingenieros de Venezuela……2) AICHE ( USA)