Post Job Free

Resume

Sign in

Engineer Project

Location:
United States
Posted:
June 28, 2015

Contact this candidate

Resume:

Ahmed Saadallah

Position looking for: Transmission, Microwave & Fiber

Availability : 2 weeks / less

PERSONAL DETAIL

Current Address : California, USA ( willing to relocate )

Email : acqg9x@r.postjobfree.com

Mobile : +1-916-***-****

Work Permit : Authorized to work in the US for any employer (sponsorship not require)

PROFILE

Seeking a new challenging, I believe that I can really make difference; I think I can bring life to my team and people, I am able to add long term value to business, the work for me is more than just a job, it’s a passion

EDUCATION

1998-2002 University/College of electronic and telecommunication engineer

Bachelor's degree awarded with average Degree 70% and Ranked (3) out of (33) and re-evaluated by American Education Research Corporation West Covina, CA

Technology Project involved

2G GSM,3G WCDMA,RAN Strategy Planning, Implementation & Optimization

Network system (Microwave, IP, VSAT,Fiber,WiMax,HSDPA & LTE)

Synchronization Design both Ethernet time / frequency & Synch E

IP routing protocols in cellular networks (OSPF,IS-IS, RIP, BGP & MPLS),

Fiber DWDM: FOC, OTDR, PMD, CD, Attention @1550, 1310/ITUG652, 653,655

10+ Years Technical Skill

Survey, Microwave design, Frequency Plan, capacity plan

2G, 3G GSM/CDMA Strategy and Planning Expert service,

Synchronization Network Design HLD, LLD

DCN –IP Project HLD, LLD

KPI Optimize project

WiMax, VSAT, MW, Fiber WDM solution

CCNA, CCNP,CCDP & IP /MPLS networking

Migration 2G to 3G/4G pre LTE roadmap and business model

Planning tools: TEMS,PathlossV.4/5, Connect, & MapInfo

5+ Years Management Project Skills (as described by the PMBOK)

Business understanding and development, Customer relationship management, Cost, profitability. Tender stage, RFQ, BOQ and PR, PO

Business scenario, case study, financial aspect CAPEX / OPEX

Personal Characteristics (Human Competence)

Dynamic, Enthusiast, self-motivated, work standalone under pressure/deadline

Active listing, negotiation and business presentation, frequently travel and adapt to changing environments, Team leader capabilities, Customer friendly and diagnostic,

ACCREDITATIONS & CERTIFICATIONS

April 2011 PMP- PMBOK® Guide - American University

Feb 2008 TOFEL English TEST–Internet Tofel Based iTB 100 out of 120

May 2007 CANADIAN LEBANESE GROUP

CCNA/CCNP/CCDP Cisco Certified Network/Design Associate &Professorial, Cisco ID: sr2706816

EMPLOYMENT HISTORY & ACHIEVEMENT

Company: ORANGE Korek/ Kurdistan,

Position: Transmission Sr

Date: Jan 2012 – July 2014

Vendor: Ericsson & ALU, NSN, DragonWave

Project Size : 3500 site

Oversaw successful microwave network expansion of more than $40 million in Capex/Opex in the first year and $ 60 million in the second year

Network Planning & Audit & Optimize service according ITU Rec./FCC and suggested guideline

IP LRAN/HRAN Ethernet Networking Migration HLD / LLD for 2000 sites

Fiber WDM solution -Tendering RFI, RFP, RFP and deployment

Company: ALCATEL/ Nigeria, Lagos and Abuja

Position: Microwave Sr

Date: June – Jan 2012 (6 months)

Vendor: Ericsson TN, Hauwie

Project: 7000 Microwave links Size

PROJECT: ETISALAT EMTS

Rollout PH4,5,7&8 Design, planning and deployment 3000 Microwave links

3G Mobile Backhaul Refresh Program MBR - ORANGE GROUP

DCN –IP Basis HLD and LLD

Synchronization Network Design

PROJECT: MTN

Manage 3G ATM Transport stuff Iur,Iub Iu-CS, Iu-PS and Iur interfaces, dimensioning & optimization including QoS and traffic plan

Conducts deep analysis of daily outage 3G HSDP report, Traffic Descriptor TD,AAL2 path failure setup, VP/VC/CID utilization )

Company: Orascom “Mobinil Egypt “/ Egypt, Cairo

Position: IP Microwave Expert

Date: Sep 2009 – 15 Feb 2011 (16 months), Motorola

Vendor: Ericsson TN R4, Nokia Flexi, Alcatel MPR & NEC

Project: 6000 MW links Size

Audit & Optimize 2G/3G service

Auditing Phase independent KPI audit of the transmission network to examine the performance with respect to set ITU availability and reliability

Optimizing Phase to ensure all microwaves PDH/SDH links are designed as per agreed customer objective and ITU criteria. Provide transmission design engineer guideline and survey guideline

Plan and Design Phase SDH Backbone for XPIC,SD space diversity technique, long haul 4 STM-1 hybrid TDM

Design, planning and deployment of IP/Ethernet transport solutions

Evolution project from legacy to Hybrid & Packet backhaul, 3G upgrade project -existing Network analysis+ architecture strategy definition + RFP specification and analysis.

IP MPLS Networking Design - ORANGE GROUP

Tendering Cycle: RFI, RFP & RFP for all packets vendors. Criteria selection,Technical Evaluation, (Synch E, QoS,Adaptive Modulation ..etc)

HLD,nominal plan MPLS Network Diagram L3 BGP/MPLS VPNs,L2 Iub over IP Design, Physical / Logical Connectivity, IP Addressing, IP Routing

3G/4G Mobile Backhaul Refresh Program MBR - ORANGE GROUP

Migration for PDH/SDH traffic to IP/MPLS networking with Deployed HSDPA+ 3GPP release8 & LTE roadmap business module:Design Process, Design Inputs and Assumptions, Traffic Model, Subscriber Distribution, L2/L3 Network for Iub, Iu/Iur IP Address Plan Considerations, Dimensioning assumptions& QoS

Company: Alcatel-Lucent ALU

Position: IP Senior Design / Egypt, Cairo

Date: Dec2008 –Jun2009

AWY, MXC and MPR Alcatel MW,(Connect44 - 6 Month contract)

DCN-IP plan & Dimension project for 3000 MW: IP Radio HLD high level design and LLD low level design, DCN network diagram, Define and propose the DCN network solution recommendations,(eg Routers, Switches, interface converter)

Master DCN plan & IP details specification, DCN parameter, Protocol OSPF, RIP, PPP, LAN & WAN characteristics Support smooth handover of project to Implementation org.

IP Network Design : RAN Infrastructure planning, design and engineering of 3G/4G backhaul systems, IP Transmission Backhaul Plan MPLS, BGP, VPN L2/3, optimization of IP backbone (apply the QoS, traffic separation VFR/VLAN)

Company: ZAIN Mobile /Ghana -Accra 2G/3.5G/HSPA technology

Position: Transport Planning and Optimization

Date: April 2008 _ Dec2008 (Aircom 9 months)

Ericsson & NEC

Pre-sale

Support product engineer at tender stage(RFQ document, drafting BOQ,PR/PO)

Customer interface(Business scenario,financial aspect CAPEX / OPEX)

Network Design TND –according ITU and guideline for 700 sites

Microwave Path engineering, Transmission solution for Access & Backbone Minilink product TN,HC interface (MMU, AMM, NPU, ETU…)

Network Optimize TNO – as per customer KPI for 200 sites

MW Planning, Network Tuning, maintaining availability & reliability, mapping Qos Optimize traffic interface (Iub,Iur and Iu-PS,Iu-CS )

Synchronization Network Design for 10 nodes

HLD and LLD both time and frequency for both Core and backbone

(NTP server/client CBC,Rb,Qz,PRC,SSU,SASE according to ITU-T G811,812,823)

WCDMA RAN High Level Design 200 sites

IP Transport Dimensioning end to end for Iub,Iur for 3G RBS and hub aggregation

Requirements on IP TN solution, L2 QoS P bit, Network Synchronization

3G Traffic module,Iu/Iub Topology, IP Address Plan Considerations

DCN –IP Basis HLD and LLD for 400 sites

DCN rule design (OSPF,PPP,ABSR,ABR,DCN over Traffic,SOM 8.1)

M-PBN Mobile Packet Backbone Network HLD for 20 nodes

LTE long term evolution IP protocol for 4G preparation L3/L2 BGP,MPLS VPN

IP planning M-PBN Ericcson ML-TN solution, Traffic separation (VFR,VLAN)

HLD of RAN GSM for 400 sites

IP connectivity design for Abis over IP

GSM/WCDMA transport sharing,PGWBs, BSS 08A

Company: KALIMAT Tele/ Kuwait

Position: Transmission & RF Planning

Date: Dec 2007 _ Mar 2008

Main Duties: Hauwie OptiX RTN 600 (SDH/PDH)

Definition & Planning for a Transmission Project for 100 sites

Directly responsible for the LOS study and Adjust network design daily based on LOS feedback by evaluating feasibility of LOS and ranked sites priorities.

2G,3G GSM/CDMA Strategy and Planning Expert

Carry out nominal site planning and subsequent field surveys, dimensioning for PDH and SDH link,IP(Ethernet traffic),

Company: “Fanoos Project” /Sulymania

Position: Microwave Network planning

Date: Aug07 _ Dec07

Main activates/ Task / Achievement

Ericsson, NEC (Both SDH/PDH) Provisional contract

Directly manages and supervises all transmission requirements on the basis of cost, time & quality and Complete Transmission planning activities

Undertake Transmission aspects in WiMax Preliminary dimension WiMax Project of backhaul high level design HLD

Company: Orascom

Position: Microwave Planning Specialist (2 yrs Contract)

Date: Jan 2005 – Jan 2007

Main activates/ Task: Alcatel & NEC (Both SDH/PDH)

Conducting site surveys to determine line of sight LOS with Fresnel zone clearance,

Carryout topographical network systems network design (topology, protection mechanisms link budgets, link availability, link Redundancy/diversity

Measure the quality of TX network: Analyzing OMC-R traffic effected daily report coming from NMS and recommend improvements, scheduled maintenance for the Network System and analytical fault resolution.

Company: Diyla University

Position: Microwave Engineer (Permanent)

Date: July 2003 - Dec 2006

Antenna Lab: Contain a sequence of experiments Antenna Receiver (half wave dipole, folded dipole, loop and yagi)

Microwave Lab: Contain study of propagation of wave guide and experiments on (Pin modulation, gun oscillation, Antenna pattern, Attenuation, Reflection coefficient and S.W.R)

All References E-mails, Certifications and details are available on request.



Contact this candidate