Ahmed Saadallah
Position looking for: Transmission, Microwave & Fiber
Availability : 2 weeks / less
PERSONAL DETAIL
Current Address : California, USA ( willing to relocate )
Email : acqg9x@r.postjobfree.com
Mobile : +1-916-***-****
Work Permit : Authorized to work in the US for any employer (sponsorship not require)
PROFILE
Seeking a new challenging, I believe that I can really make difference; I think I can bring life to my team and people, I am able to add long term value to business, the work for me is more than just a job, it’s a passion
EDUCATION
1998-2002 University/College of electronic and telecommunication engineer
Bachelor's degree awarded with average Degree 70% and Ranked (3) out of (33) and re-evaluated by American Education Research Corporation West Covina, CA
Technology Project involved
2G GSM,3G WCDMA,RAN Strategy Planning, Implementation & Optimization
Network system (Microwave, IP, VSAT,Fiber,WiMax,HSDPA & LTE)
Synchronization Design both Ethernet time / frequency & Synch E
IP routing protocols in cellular networks (OSPF,IS-IS, RIP, BGP & MPLS),
Fiber DWDM: FOC, OTDR, PMD, CD, Attention @1550, 1310/ITUG652, 653,655
10+ Years Technical Skill
Survey, Microwave design, Frequency Plan, capacity plan
2G, 3G GSM/CDMA Strategy and Planning Expert service,
Synchronization Network Design HLD, LLD
DCN –IP Project HLD, LLD
KPI Optimize project
WiMax, VSAT, MW, Fiber WDM solution
CCNA, CCNP,CCDP & IP /MPLS networking
Migration 2G to 3G/4G pre LTE roadmap and business model
Planning tools: TEMS,PathlossV.4/5, Connect, & MapInfo
5+ Years Management Project Skills (as described by the PMBOK)
Business understanding and development, Customer relationship management, Cost, profitability. Tender stage, RFQ, BOQ and PR, PO
Business scenario, case study, financial aspect CAPEX / OPEX
Personal Characteristics (Human Competence)
Dynamic, Enthusiast, self-motivated, work standalone under pressure/deadline
Active listing, negotiation and business presentation, frequently travel and adapt to changing environments, Team leader capabilities, Customer friendly and diagnostic,
ACCREDITATIONS & CERTIFICATIONS
April 2011 PMP- PMBOK® Guide - American University
Feb 2008 TOFEL English TEST–Internet Tofel Based iTB 100 out of 120
May 2007 CANADIAN LEBANESE GROUP
CCNA/CCNP/CCDP Cisco Certified Network/Design Associate &Professorial, Cisco ID: sr2706816
EMPLOYMENT HISTORY & ACHIEVEMENT
Company: ORANGE Korek/ Kurdistan,
Position: Transmission Sr
Date: Jan 2012 – July 2014
Vendor: Ericsson & ALU, NSN, DragonWave
Project Size : 3500 site
Oversaw successful microwave network expansion of more than $40 million in Capex/Opex in the first year and $ 60 million in the second year
Network Planning & Audit & Optimize service according ITU Rec./FCC and suggested guideline
IP LRAN/HRAN Ethernet Networking Migration HLD / LLD for 2000 sites
Fiber WDM solution -Tendering RFI, RFP, RFP and deployment
Company: ALCATEL/ Nigeria, Lagos and Abuja
Position: Microwave Sr
Date: June – Jan 2012 (6 months)
Vendor: Ericsson TN, Hauwie
Project: 7000 Microwave links Size
PROJECT: ETISALAT EMTS
Rollout PH4,5,7&8 Design, planning and deployment 3000 Microwave links
3G Mobile Backhaul Refresh Program MBR - ORANGE GROUP
DCN –IP Basis HLD and LLD
Synchronization Network Design
PROJECT: MTN
Manage 3G ATM Transport stuff Iur,Iub Iu-CS, Iu-PS and Iur interfaces, dimensioning & optimization including QoS and traffic plan
Conducts deep analysis of daily outage 3G HSDP report, Traffic Descriptor TD,AAL2 path failure setup, VP/VC/CID utilization )
Company: Orascom “Mobinil Egypt “/ Egypt, Cairo
Position: IP Microwave Expert
Date: Sep 2009 – 15 Feb 2011 (16 months), Motorola
Vendor: Ericsson TN R4, Nokia Flexi, Alcatel MPR & NEC
Project: 6000 MW links Size
Audit & Optimize 2G/3G service
Auditing Phase independent KPI audit of the transmission network to examine the performance with respect to set ITU availability and reliability
Optimizing Phase to ensure all microwaves PDH/SDH links are designed as per agreed customer objective and ITU criteria. Provide transmission design engineer guideline and survey guideline
Plan and Design Phase SDH Backbone for XPIC,SD space diversity technique, long haul 4 STM-1 hybrid TDM
Design, planning and deployment of IP/Ethernet transport solutions
Evolution project from legacy to Hybrid & Packet backhaul, 3G upgrade project -existing Network analysis+ architecture strategy definition + RFP specification and analysis.
IP MPLS Networking Design - ORANGE GROUP
Tendering Cycle: RFI, RFP & RFP for all packets vendors. Criteria selection,Technical Evaluation, (Synch E, QoS,Adaptive Modulation ..etc)
HLD,nominal plan MPLS Network Diagram L3 BGP/MPLS VPNs,L2 Iub over IP Design, Physical / Logical Connectivity, IP Addressing, IP Routing
3G/4G Mobile Backhaul Refresh Program MBR - ORANGE GROUP
Migration for PDH/SDH traffic to IP/MPLS networking with Deployed HSDPA+ 3GPP release8 & LTE roadmap business module:Design Process, Design Inputs and Assumptions, Traffic Model, Subscriber Distribution, L2/L3 Network for Iub, Iu/Iur IP Address Plan Considerations, Dimensioning assumptions& QoS
Company: Alcatel-Lucent ALU
Position: IP Senior Design / Egypt, Cairo
Date: Dec2008 –Jun2009
AWY, MXC and MPR Alcatel MW,(Connect44 - 6 Month contract)
DCN-IP plan & Dimension project for 3000 MW: IP Radio HLD high level design and LLD low level design, DCN network diagram, Define and propose the DCN network solution recommendations,(eg Routers, Switches, interface converter)
Master DCN plan & IP details specification, DCN parameter, Protocol OSPF, RIP, PPP, LAN & WAN characteristics Support smooth handover of project to Implementation org.
IP Network Design : RAN Infrastructure planning, design and engineering of 3G/4G backhaul systems, IP Transmission Backhaul Plan MPLS, BGP, VPN L2/3, optimization of IP backbone (apply the QoS, traffic separation VFR/VLAN)
Company: ZAIN Mobile /Ghana -Accra 2G/3.5G/HSPA technology
Position: Transport Planning and Optimization
Date: April 2008 _ Dec2008 (Aircom 9 months)
Ericsson & NEC
Pre-sale
Support product engineer at tender stage(RFQ document, drafting BOQ,PR/PO)
Customer interface(Business scenario,financial aspect CAPEX / OPEX)
Network Design TND –according ITU and guideline for 700 sites
Microwave Path engineering, Transmission solution for Access & Backbone Minilink product TN,HC interface (MMU, AMM, NPU, ETU…)
Network Optimize TNO – as per customer KPI for 200 sites
MW Planning, Network Tuning, maintaining availability & reliability, mapping Qos Optimize traffic interface (Iub,Iur and Iu-PS,Iu-CS )
Synchronization Network Design for 10 nodes
HLD and LLD both time and frequency for both Core and backbone
(NTP server/client CBC,Rb,Qz,PRC,SSU,SASE according to ITU-T G811,812,823)
WCDMA RAN High Level Design 200 sites
IP Transport Dimensioning end to end for Iub,Iur for 3G RBS and hub aggregation
Requirements on IP TN solution, L2 QoS P bit, Network Synchronization
3G Traffic module,Iu/Iub Topology, IP Address Plan Considerations
DCN –IP Basis HLD and LLD for 400 sites
DCN rule design (OSPF,PPP,ABSR,ABR,DCN over Traffic,SOM 8.1)
M-PBN Mobile Packet Backbone Network HLD for 20 nodes
LTE long term evolution IP protocol for 4G preparation L3/L2 BGP,MPLS VPN
IP planning M-PBN Ericcson ML-TN solution, Traffic separation (VFR,VLAN)
HLD of RAN GSM for 400 sites
IP connectivity design for Abis over IP
GSM/WCDMA transport sharing,PGWBs, BSS 08A
Company: KALIMAT Tele/ Kuwait
Position: Transmission & RF Planning
Date: Dec 2007 _ Mar 2008
Main Duties: Hauwie OptiX RTN 600 (SDH/PDH)
Definition & Planning for a Transmission Project for 100 sites
Directly responsible for the LOS study and Adjust network design daily based on LOS feedback by evaluating feasibility of LOS and ranked sites priorities.
2G,3G GSM/CDMA Strategy and Planning Expert
Carry out nominal site planning and subsequent field surveys, dimensioning for PDH and SDH link,IP(Ethernet traffic),
Company: “Fanoos Project” /Sulymania
Position: Microwave Network planning
Date: Aug07 _ Dec07
Main activates/ Task / Achievement
Ericsson, NEC (Both SDH/PDH) Provisional contract
Directly manages and supervises all transmission requirements on the basis of cost, time & quality and Complete Transmission planning activities
Undertake Transmission aspects in WiMax Preliminary dimension WiMax Project of backhaul high level design HLD
Company: Orascom
Position: Microwave Planning Specialist (2 yrs Contract)
Date: Jan 2005 – Jan 2007
Main activates/ Task: Alcatel & NEC (Both SDH/PDH)
Conducting site surveys to determine line of sight LOS with Fresnel zone clearance,
Carryout topographical network systems network design (topology, protection mechanisms link budgets, link availability, link Redundancy/diversity
Measure the quality of TX network: Analyzing OMC-R traffic effected daily report coming from NMS and recommend improvements, scheduled maintenance for the Network System and analytical fault resolution.
Company: Diyla University
Position: Microwave Engineer (Permanent)
Date: July 2003 - Dec 2006
Antenna Lab: Contain a sequence of experiments Antenna Receiver (half wave dipole, folded dipole, loop and yagi)
Microwave Lab: Contain study of propagation of wave guide and experiments on (Pin modulation, gun oscillation, Antenna pattern, Attenuation, Reflection coefficient and S.W.R)
All References E-mails, Certifications and details are available on request.