MEHDI ABDOLLAHI
***** ** **** ******, *******, FL 33027 954-***-**** acqg5u@r.postjobfree.com
PROFILE
Experienced civil engineer professional with demonstrated success; dedicated, results-oriented, team player committed to continuing success
by fostering a team environment and atmosphere; a versatile and effective-working project leader that can successfully adapt to situations in
order to meet demands; exceptional communicator who collaborates with individuals and teams at all levels; effective in identifying efficient
methods and processes to correct complex issues and problems.
CORE COMPETENCIES INCLUDE:
International Exposure Time Management
Member of Australia Engineering Project Management
Executive Management Dam Construction
Technical and Design Management Monorail System
Method Statement, Analysis, and Reporting Urban Railway
Development and Contract & tender Affairs Expert Hydraulic Tunnel
Employee safety measures – HSE Highway
TBM mechanized excavation methods (Hard Rock & EPB) Fabrication
PROFESSIONAL
EXPERIENCE
June 2013-Present K.T.B. COMPANY/ UMA OYA PROJECT, Sri Lanka
Executive Manager
Create, manage, and roll out method statements
•
Management and coordination of works
•
Plan and manage project and resolve critical issues to minimize project risk factors
•
Responsible for site safety and quality control
•
Establish QA procedures for projects
•
Provide forecasts and resultant schedules pertinent to project
•
Deliver status reports to direct management (daily, weekly, and monthly)
•
Responsible for delivering projects against agreed scope, budget, and schedule
•
Identify resources and requirements, assign responsibilities and coordinate with project staff directly/indirectly to ensure successful
•
completion of project
Liaise with commercial manager to ensure payment applications are correctly submitted
•
Supervise, direct & motivate teams of approximately 250 multi-discipline contractors & employees
•
Supervise sub-contractors as appropriate
•
Liaise with site managers and general foreman regarding labor matters
•
Evaluate performance and functionality – devised ways to improve performance when appropriate
•
Responsible for the Herrenknecht-TBM operations
•
Supervise and coordinate timely delivery of engineering related equipment relevant to the job site and tunnel
•
Input into resolving any design issues or required changes to program as a result of soil conditions encountered
•
Assist in preparation of proposals for possible projects.
•
2010-2013 KAYSON COMPANY / QOM MONORAIL PROJECT, Tehran -Qom, Iran
Technical Vice President and Design Manager
Studied and researched methods of monorail system operation in modern countries
•
Prepared the methodology of monorail system’s different sections
•
Supervised the preparation of the site’s plan drawing by the consultants and the designers
•
Supervised and prepared technical site drawings
•
Cost Estimating and analysis
•
Managed Technical staff of 15 engineers and coordinating with consulting engineers of Sisra Co.of France
•
Held meetings with E&M contractor to review necessary technical and structural issues
•
Prepared documents to develop and expand company expertise in biting similar project in other locations in the field of monorail and
•
subway
Prepared concrete mix design and analysis obtaining acceptable results prior to final production
•
Page 1
Prepared installation method of concrete beams weighing 60 tons
•
Supervised and resolved technical issues concerning precast concrete beams production and curing process
•
Supervised and prepared monthly invoice, daily and monthly reports, and scheduling
•
(http://www.kayson-ir.com)
2009-2010 KAYSON COMPANY, AHWAZ URBAN RAILWAY PROJECT (METRO), Tehran, Iran
Technical Consultant
Published comprehensive method statement and engineering hand book with emphases on tunnel boring machine (TBM)
•
Created manual instructions for excavation operating machinery, contraction analysis, maintenance and grout injection
•
Managed site mobilization, identify necessary equipment to perform specific duties required in construction of 23km of railwa ys
•
Prepared concrete mix design and analysis obtaining acceptable results prior to final production
•
Supervised and prepared monthly invoice, daily and monthly reports, and schedules
•
(http://www.kayson-ir.com)
2007-2009 SABIR COMPANY, Aligudarz, Iran
Project Manager of DEZ-GHOMROOD TUNNEL Plot 1 & 2
Managed staff of 550 technician excavating 12 Kilometer Tunnel Via by tunnel boring machine (TBM Device Hard Rock & EPB)
•
Produced 8800 ring segment in factory by steaming method.
•
Prepared concrete mix design and analysis obtaining acceptable results prior to final production
•
(http://www.sabir.ir)
2006-2007 KAYSON COMPANY, Ahwaz, Iran
Technical Office Deputy of Ahwaz Urban Railway Project (Metro)
Prepared executive plans and cost analysis
•
Prepared operation method statement Including top & down, pile, secondary pile, diaphragm wall, concrete pre-cooling, shut Crete,
•
logistic, segment production, plastic concrete, mixed design concrete and mechanized digging methods by TMB device.
Prepared concrete mix design and analysis obtaining acceptable results prior to final production
•
(http://www.kayson-ir.com)
2005-2006 TABLIEH CONSTRUCTION COMPANY, Tehran, Iran
Development and Contract & Tender Affairs Expert of Int. & Domestic Projects
Prepared operations methodology
•
Participated in domestic and international tenders
•
Estimated conceptual cost analysis
•
Collected tender packages and Documentation for international projects such as Pala Dam in India, Kishakanga Dam in Pakistan,
•
transit highway in Algeria, increased Dam capacity in Zimbabwe, Assi Dam in Lebanon, Karuma Dam and power station in Uganda
(http://www.tablieh.com)
2004-2005 DANESH-FAN COMPANY, Asaluyeh, Iran
Project Manager Deputy/Highway of Asaluyeh
Page 2
Performed 3 tunnel operations, each one being approximately 500 meters long
•
Responsible for lining and opening the tunnels without causing any accident
•
2001- 2004 JOINT VENTURE JTMA & HAMON & BEHAN SAD,Tehran, Iran
Project Manager Consultant & Technical Expert/ Karun IV Dam
Produced and prepared dam method statement with all details such as (supply concrete equipment – spillway – grout curtain – coffer
•
dam – intake – embankment – headrace & tailrace excavation and lining - runway – fix point - dam body - plunge pool - thrust blocks
- diversion tunnels- vertical shaft- manifold - power station-injection galleries, overflow, take, etc.)
(http://www.jtma.ir)
1996-2000 SABIR COMPANY, Iezeh, Iran
Site Supervisor Deputy & Fabrication Unit Supervisor In Karun Dam III
Managed staff of 400 in upper site of project including intake - headrace tunnels- bifurcation – upper bend - vertical shafts – lower
•
bend
Supervised and prepared monthly statements, daily and monthly reports, and scheduling
•
Managed 220 persons at the industrial steel fabrication site – Managing all metal works such as construction of metal frame tunnel
•
Increased experience in construction (power station – transformer tunnel - tailrace tunnel, diversion tunnel - search shafts-vertical
•
shafts- lower bend tunnels- manifold- dam body- injection galleries.
(http://www.sabir.ir)
EDUCATION
1994 Ferdowsi University of Mashhad, Mashhad, Iran GPA:3.2
B.S. Civil Engineering
OTHER CERTIFICATES
Member of Building Engineering System of Tehran - Ministry of Housing and Development Membership No. 10-30-13992
•
Self-Assessment Promoter Training Course Based on EQFM 2010 Model Tehran, July 20, 2010
•
Prime Project Management Fundamentals (Course I.D. 1166-OPM001) Primelearning.com, Sept. 21, 2010
•
AutoCAD 3D Course, Jahad Daneshgahi-Qom Province, July 4,2012
•
ETABS&SAFE Course, Tehran Institute of technology, June 4, 2013
•
Civil 3D Course, Jahad Daneshgahi-Qom Province, November17, 2012
•
Member of Australia engineering (www.engineersaustralia.org.au)
•
Communication between contractor and employee and claiming course
•
Analyzing and managing delayed projects
•
TECHNICAL SKILLS Microsoft Office (included Word, Excel, PowerPoint and Outlook), Microsoft Project (MSP), Primavera (P3, P6 &
Enterprise), ETABS&SAFE, Auto CAD (2D &3D), civil 3D & Internet
FOREIGN LANGUAGE
• English Fluent
• Persian (Farsi) Native
COMMENTS
Good communication skills
•
Time Management expertise
•
Excellent Leadership skills
•
Sound decision Making
•
REFERENCE Available upon Request
Page 3