Post Job Free

Resume

Sign in

Project Manager Management

Location:
Fort Lauderdale, FL
Posted:
June 28, 2015

Contact this candidate

Resume:

MEHDI ABDOLLAHI

***** ** **** ******, *******, FL 33027 954-***-**** acqg5u@r.postjobfree.com

PROFILE

Experienced civil engineer professional with demonstrated success; dedicated, results-oriented, team player committed to continuing success

by fostering a team environment and atmosphere; a versatile and effective-working project leader that can successfully adapt to situations in

order to meet demands; exceptional communicator who collaborates with individuals and teams at all levels; effective in identifying efficient

methods and processes to correct complex issues and problems.

CORE COMPETENCIES INCLUDE:

International Exposure Time Management

Member of Australia Engineering Project Management

Executive Management Dam Construction

Technical and Design Management Monorail System

Method Statement, Analysis, and Reporting Urban Railway

Development and Contract & tender Affairs Expert Hydraulic Tunnel

Employee safety measures – HSE Highway

TBM mechanized excavation methods (Hard Rock & EPB) Fabrication

PROFESSIONAL

EXPERIENCE

June 2013-Present K.T.B. COMPANY/ UMA OYA PROJECT, Sri Lanka

Executive Manager

Create, manage, and roll out method statements

Management and coordination of works

Plan and manage project and resolve critical issues to minimize project risk factors

Responsible for site safety and quality control

Establish QA procedures for projects

Provide forecasts and resultant schedules pertinent to project

Deliver status reports to direct management (daily, weekly, and monthly)

Responsible for delivering projects against agreed scope, budget, and schedule

Identify resources and requirements, assign responsibilities and coordinate with project staff directly/indirectly to ensure successful

completion of project

Liaise with commercial manager to ensure payment applications are correctly submitted

Supervise, direct & motivate teams of approximately 250 multi-discipline contractors & employees

Supervise sub-contractors as appropriate

Liaise with site managers and general foreman regarding labor matters

Evaluate performance and functionality – devised ways to improve performance when appropriate

Responsible for the Herrenknecht-TBM operations

Supervise and coordinate timely delivery of engineering related equipment relevant to the job site and tunnel

Input into resolving any design issues or required changes to program as a result of soil conditions encountered

Assist in preparation of proposals for possible projects.

2010-2013 KAYSON COMPANY / QOM MONORAIL PROJECT, Tehran -Qom, Iran

Technical Vice President and Design Manager

Studied and researched methods of monorail system operation in modern countries

Prepared the methodology of monorail system’s different sections

Supervised the preparation of the site’s plan drawing by the consultants and the designers

Supervised and prepared technical site drawings

Cost Estimating and analysis

Managed Technical staff of 15 engineers and coordinating with consulting engineers of Sisra Co.of France

Held meetings with E&M contractor to review necessary technical and structural issues

Prepared documents to develop and expand company expertise in biting similar project in other locations in the field of monorail and

subway

Prepared concrete mix design and analysis obtaining acceptable results prior to final production

Page 1

Prepared installation method of concrete beams weighing 60 tons

Supervised and resolved technical issues concerning precast concrete beams production and curing process

Supervised and prepared monthly invoice, daily and monthly reports, and scheduling

(http://www.kayson-ir.com)

2009-2010 KAYSON COMPANY, AHWAZ URBAN RAILWAY PROJECT (METRO), Tehran, Iran

Technical Consultant

Published comprehensive method statement and engineering hand book with emphases on tunnel boring machine (TBM)

Created manual instructions for excavation operating machinery, contraction analysis, maintenance and grout injection

Managed site mobilization, identify necessary equipment to perform specific duties required in construction of 23km of railwa ys

Prepared concrete mix design and analysis obtaining acceptable results prior to final production

Supervised and prepared monthly invoice, daily and monthly reports, and schedules

(http://www.kayson-ir.com)

2007-2009 SABIR COMPANY, Aligudarz, Iran

Project Manager of DEZ-GHOMROOD TUNNEL Plot 1 & 2

Managed staff of 550 technician excavating 12 Kilometer Tunnel Via by tunnel boring machine (TBM Device Hard Rock & EPB)

Produced 8800 ring segment in factory by steaming method.

Prepared concrete mix design and analysis obtaining acceptable results prior to final production

(http://www.sabir.ir)

2006-2007 KAYSON COMPANY, Ahwaz, Iran

Technical Office Deputy of Ahwaz Urban Railway Project (Metro)

Prepared executive plans and cost analysis

Prepared operation method statement Including top & down, pile, secondary pile, diaphragm wall, concrete pre-cooling, shut Crete,

logistic, segment production, plastic concrete, mixed design concrete and mechanized digging methods by TMB device.

Prepared concrete mix design and analysis obtaining acceptable results prior to final production

(http://www.kayson-ir.com)

2005-2006 TABLIEH CONSTRUCTION COMPANY, Tehran, Iran

Development and Contract & Tender Affairs Expert of Int. & Domestic Projects

Prepared operations methodology

Participated in domestic and international tenders

Estimated conceptual cost analysis

Collected tender packages and Documentation for international projects such as Pala Dam in India, Kishakanga Dam in Pakistan,

transit highway in Algeria, increased Dam capacity in Zimbabwe, Assi Dam in Lebanon, Karuma Dam and power station in Uganda

(http://www.tablieh.com)

2004-2005 DANESH-FAN COMPANY, Asaluyeh, Iran

Project Manager Deputy/Highway of Asaluyeh

Page 2

Performed 3 tunnel operations, each one being approximately 500 meters long

Responsible for lining and opening the tunnels without causing any accident

2001- 2004 JOINT VENTURE JTMA & HAMON & BEHAN SAD,Tehran, Iran

Project Manager Consultant & Technical Expert/ Karun IV Dam

Produced and prepared dam method statement with all details such as (supply concrete equipment – spillway – grout curtain – coffer

dam – intake – embankment – headrace & tailrace excavation and lining - runway – fix point - dam body - plunge pool - thrust blocks

- diversion tunnels- vertical shaft- manifold - power station-injection galleries, overflow, take, etc.)

(http://www.jtma.ir)

1996-2000 SABIR COMPANY, Iezeh, Iran

Site Supervisor Deputy & Fabrication Unit Supervisor In Karun Dam III

Managed staff of 400 in upper site of project including intake - headrace tunnels- bifurcation – upper bend - vertical shafts – lower

bend

Supervised and prepared monthly statements, daily and monthly reports, and scheduling

Managed 220 persons at the industrial steel fabrication site – Managing all metal works such as construction of metal frame tunnel

Increased experience in construction (power station – transformer tunnel - tailrace tunnel, diversion tunnel - search shafts-vertical

shafts- lower bend tunnels- manifold- dam body- injection galleries.

(http://www.sabir.ir)

EDUCATION

1994 Ferdowsi University of Mashhad, Mashhad, Iran GPA:3.2

B.S. Civil Engineering

OTHER CERTIFICATES

Member of Building Engineering System of Tehran - Ministry of Housing and Development Membership No. 10-30-13992

Self-Assessment Promoter Training Course Based on EQFM 2010 Model Tehran, July 20, 2010

Prime Project Management Fundamentals (Course I.D. 1166-OPM001) Primelearning.com, Sept. 21, 2010

AutoCAD 3D Course, Jahad Daneshgahi-Qom Province, July 4,2012

ETABS&SAFE Course, Tehran Institute of technology, June 4, 2013

Civil 3D Course, Jahad Daneshgahi-Qom Province, November17, 2012

Member of Australia engineering (www.engineersaustralia.org.au)

Communication between contractor and employee and claiming course

Analyzing and managing delayed projects

TECHNICAL SKILLS Microsoft Office (included Word, Excel, PowerPoint and Outlook), Microsoft Project (MSP), Primavera (P3, P6 &

Enterprise), ETABS&SAFE, Auto CAD (2D &3D), civil 3D & Internet

FOREIGN LANGUAGE

• English Fluent

• Persian (Farsi) Native

COMMENTS

Good communication skills

Time Management expertise

Excellent Leadership skills

Sound decision Making

REFERENCE Available upon Request

Page 3



Contact this candidate