Manuel Aguirre
Crystal Lake Il 60012
acqfo7@r.postjobfree.com
Cell phone 815-***-****
Profile - Industrial Engineer Manager with 14 years Industrial Engineering experience
-Strong background in Industrial Engineering, Quality control, Machining center operations, and tooling activities.
-Experienced in manufacturing processes, and manpower for advance program time and motion studies development of standard work and standard data, using MODATS or another standard system ceritification, time control (MTM Ticon) evaluation and budgets.
-Auto cad,solid work and FMEA’s experience
-Able to effectively communicate with individuals at all, levels of an organization
-Proficient knowledge of MS office, including Word Excel, Power Point and Lotus Notes or equivalent
-Familiar with QS-9000/ISO/ and ISO 1400 requirements and procedures
-Assembly launch experience
Experience
Image Industries (2013-2015)
CNC Programmer
Wrote machine programs, set up and operated miyano machines
-Determined points of intersection and all necessary data to manufacture quality production to tolerance as close as +- 0.0005
-Coordinated service and warranty work with equipment companies
-Designed new maintenance program, with reduced down – time 35 % and enhanced ability to meet customer schedules
John Crane (2011-2012)
Responsible of Impregnation Department
Start up and manage manufacturing and assembly facility for differents manufacturing proce-
sses of impregnation
Designed, organized and set up new manufacturing facility vassel machine impregnation
Exceed all production, quality, and cost goals in a fast- paced environment
Electronics Specialties Inc. (2011-20120
Shipping and receiving Manager
-Designed and implemented new electronics products
-Developed plant lay outs,work intructions,process flow lay out, set up procedures while adhering to safety,quality and productivity procedures and policies
-Created new format for annual and monthly inventory
Revcor co (1998-1999)
Supervisor Quality Control (welding)
Supervise quality control in manufacturing of fans
-Manage internal quality of manufacturing records, certifications, and requirements of individuals customers
-Handle internal and supplier audits and implementation of SPC
-Recommended and implemented new processes, which increased production by 25% without jeopardizing quality
-Wrote new quality manual,which established product specifications and standards bnecessary to meet customer requirements
D.B. Hess (1996-1997)
Responsible of machines like binders,stitchers, punch press, conveyors and some toolings for production
-Established bin balance system
-Designed new maintenance program,which reduced down – time 33% and enhanced ability to meet customer schedules
Chrysler Corporation Mexico
Assembly Truck Plant (1992-1993)
Proyect (Move assembly truck plant from Mexico to Coahuila State)
Industrial Engineer (Chassis line)
The main purpose is to remove assembly truck plant out to big city
-Traveled to U.S.A. for visiting some assembly plants for getting information about that new plants, process,equipments,facilities,procedures,etc,etc.
-Developed new budget with standard data and another time study
-Calculated new productive line with man assignment data,number or workstation, flow distances of running for each operator etc.
-Creating, designing and modifying old chassis line into a new chassis with more productivity and more efficiency with the best technology
-Created the new budget model year based on motion studies, development of standardized work, manpower estimation, and standard data
K- FRAME Plant (1989-1991)
Chief Industrial Engineering
-Created the new budget for crossmember 4,6,and 8 cylinders
-Calculated and designed the productive line for 4,6, and 8 cylinders
-Developed and planned man assignment, lay outs and process standards
-Implemented of lean principles in manufacturing
-Provided Industrial Engineering support to all manufacturing, Engineering operations through the application of lean manufacturing/kaizen principles
-Coordinated assembly launch
Assembly Car Plant (1979-1988)
Industrial Engineer (Metal finished,Paint shop,Chassis line)
-Developed the budget for differents models year
-Calculated man assignments for differents volumes of production
-Calculated new dress motor line next to chassis line
-Implemented productivity meeting with all departments that support to production
-Planned and developed new proyect in advance working together with staff
-Coordinated launch for differents model year car
Education
1974-1979 B.S. Mechanical Engineer
1993-1996 M.S. Mechanical Engineer
Organizational Memberships
SAE Society of Automotive Engineers
Additional languages
Spanish (fluent) Portuguese (fluent) French (basic speaking and reading)