Production and Maintenance BIO-DATA
HITESH KUMAR CHAUDHARY
Mobile No:+977-980-***-****, +91-973*******
Email I.D. : acq900@r.postjobfree.com
Passport.: K1436465 25/02/2013 to 27/02/2023
Hitesh Chaudhary S/O Sh. Ashok Kumar,
C/O Himachal Khadi Ashram, Green Field Lakkar Bazaar,
Shimla-171001(H.P)
Professional synopsis
Offer hands on experience in failure analysis and countermeasures (troubleshooting), preventive and predictive maintenance, selection of material,Cost accounting, estimate costing, fabrication erection and commissioning.
3-year exposure in integrated steel plant, Rolling mill 18”, 16” TMT Mill.
Professional Qualification: Mechanical Engineering (B.Tech Degree)
Experience: Total 3 Years (2012 to till date)
S.N
Company Name
Position
Area Of Work
Tenure/ Period
Total Years
Plant/ Equipment Handled
1
Goenka Steels Pvt. Ltd. (Nepal)
Assistant Production Manager
Production and Maintenance
2014 Jan
Till
TMT Rolling Mill Production and Maintenance
2
Amba Shakti Ispat Ltd. (H.P)
Production cum Maintenance Engineer
Production and Maintenance
July 2012 - Jan 2014
18 month
TMT Rolling mill, Induction Furnace, CCM,Section Mill
Rolling Mill:
TMT Mill, Reheating Furnace, Pulverizer,Billet shear, cold shear machine, Tilting Table, Gear box (Reduction and Pinion),Recuperator, Compressor, Pumps, Maintenance of Rotary shear, alignment, Gear Maintenance, Ejector, Pumps, conveyor, Blower, Gear box of conveyor, Butterfly Valve, Gate valve, Cooling tower, Take care of Raw material, equipment for higher stability, Analysis of product.
Responsibility:
Responsible for all production activities (planning and execution)
Minimize the short length issues and obtaining maximum Productivity
Small inventory via substitute elimination procedure
Indent spares
Shut down preparation
Prepare preventive and predictive maintenance plan for machines and equipments
Condition monitoring of machinery and equipment, within design range and domain to eliminate unwanted failure, with proper maintenance
Analyze causes of breakdown of Plants and equipments to carry out remedial measures.
Furnished all planned activities in time frame
Planning optimum men power & inventories
Applied safe working procedure, work permit, proper maintenance of safety promotions and use of safety applications
Reduction in down time in all areas under control and improving equipment availability
Coordination with corporate office and other sister’s plant
Manage and execute the erection, commissioning and testing of all capital projects
Strategic developments and decision-making
Coordination with local authorities for power, water supply like Government/ State Govt. etc
Reduction in work force
Recruitment of locals & expatriates
Responsibility of coordination with main suppliers
Selection and procurement of various equipments and spare parts
Ensure that safety standards are maintained in the factory
Manage professionals and maintain overall responsibility for their development and deployment
Responsible for all improvement / modifications
Objectives:
Reduction of waste
100% availability of machines /equipments of running plant for un interruption production
Continuous improvement
Power saving in KWH
Generate difference in production and Productivity
Skills:
Communication skill
Analytical ability
Planning & organizing skill
Creativity and Innovation
Teambuilding skill
Interpersonal relationship skill
Computer Proficiency:
Design Package: Auto Cad
Package: MS Office(Word, Excel, Power Point Access)
Others: Internet suffering & Introduction to Hardware and Software's
Personal Information:
Father Name : Sh. Ashok Chaudhary
D.O.B : 10-03-1991
Nationality : Indian
Marital Status : Unmarried
At last but not least I assure that if opportunity is provided to me I shall prove worthy and loyal to the assigned tasks during my working with your esteemed organization.
Date:
(Hitesh Kumar Chaudhary)
Place: Nepal