Post Job Free

Resume

Sign in

Lead Analyst - CBM program. Vibration, Infrared, Ultrasonic

Location:
Oklahoma City, OK
Salary:
75,000
Posted:
August 03, 2015

Contact this candidate

Resume:

Ricky D. Isbell

****** Deans Ln

Hastings, OK ***48

580-***-****

acq2ra@r.postjobfree.com

Summary of Qualifications

Areas of expertise include:

Maintenance Planning/Supervision

Root Cause Failure Analysis

Vibration Analysis

Oil Analysis

Laser Shaft Alignment

Ultrasonic Inspections

Infrared Inspections

RCM Analyst

Maintenance Technician

Machinist

Shut Down/Project Planning and Supervision

Experience Highlights

Allied Reliability Group, Charleston, SC 2014 - Present

Lead Analyst, Reynolds Army Community Hospital, Fort Sill, OK. September 2014 to present

Responsibilities

Management of the Master Technology Schedule

Maintain schedule with over 560 assets of various types including Electrical and Mechanical Devices and components.

Schedule Compliance and Route Adherence

Maintain route adherence over 95%. Route adherence is crucial in discovery of any potential failures affecting safe and reliable operation of facility equipment.

Data Analysis and Reporting

Analysis of data collected using Vibration, Infrared and Ultrasound technologies has resulted in diagnosis and reporting of faults including:

Electrical fault in variable frequency drive motor controller for air circulating service to critical areas of the hospital. Failure to repair electrical fault would result in loss of essential life service to operating rooms and critical patient care areas.

Detection of eminent bearing failure in motor for air circulating system allowed planning for motor replacement with no interruption in service. Failure to replace motor would result in loss of essential life service to operating rooms and critical patient care areas.

Roanoke Valley Energy Facility Weldon, NC 1993 - 2014

Supervisor/Project Planner

Responsibilities

Planning and supervision of various plant shutdown related projects.

GE and Mitsubishi Steam Power turbine generator: 2011 - 2014

Project required planning, estimating and procuring labor, equipment and repair parts for twice annual shut down periods. Labor for these projects ranged from 5 to 15 persons including technical advisors and supervisors.

Process control valve inspection and overhaul program 1994 – 1998 and 2006 - 2011

Develop repair procedures. Schedule maintenance based on previous inspections and system importance for planned and emergency shutdown.

Flue Gas Desulphurization System, Bag House refurbishing, Pneumatic Ash Conveying System, Boiler miscellaneous systems.

Cooling Tower. 1998 - 2006

Maintenance Technician

Vibration Analysis Program Administer

Perform research and prepare purchase specification for CSI AMS software and CSI 2130 Machinery Health Analyzer/Data Collector.

Perform Operation Deflection Shape (ODS) study of Boiler ID Fans

Findings of ODS study resulted in soil analysis and foundation remediation by grout injection into soil of fan foundations.

Set up and maintain equipment database using CSI AMS and Entek Odyssey software using CSI 2130 Machinery Health Analyzer/Data Collector.

Conduct vibration surveys and perform detailed spectrum analysis.

Conduct training and mentoring for junior analyst.

Recommend scheduled repairs and emergency shutdown based on machine condition analysis.

Accurate analysis of Boiler ID Fan unbalance condition to allow shut down of plant to prevent catastrophic bearing failure.

Analysis of rolling element bearings Riley Atrita coal pulverizer to allow replacement during planned shut down period.

Analysis of Boiler FD Fan motor electrical signal vibration frequencies to predict defects in rotor, allowed motor rebuild during planned shutdown period.

Accurate analysis of Roots lobe style blower identifying advanced bearing failure to allow for planned rebuild of unit.

Analysis of Cooper Turbo 2000 air compressor identifying bull gear bearing advanced stage wear.

Oil Analysis Program Administer

Utilize off site testing laboratory.

Specify purchase of lube oil filter cart for kidney loop filtering of cooling tower fan gearbox.

Develop maintenance procedure for use of lube oil filter cart.

Develop condition based schedule for gear box oil changes resulting in improved reliability and reduced cost of materials and labor.

Cause Mapping/Root Cause Failure Analysis

Committee Member for cause mapping of Mitsubishi Steam Turbine Generator unresolved trip events.

Resulted in returning system to 100% design reliability factor through discovery of root cause and eventual system modification.

Use CMMS program (MAXIMO and MP2) for recording of all maintenance activity

Enter WO’s

Document details of repairs and recommendations.

Enter PO’s

Enter planned maintenance tasks

Rotating equipment field balancing experience.

GE 187MW Steam Turbine

Joy/Greene Boiler ID Fans

Control valve inspection and overhaul program.

Valve manufacturers include Fisher, Copes Vulcan, Mason Elian and ValTech.

Included disassembly, refurbishing or replacing of internal parts and reassembly including setting up pneumatic and digital valve positioners.

Rotating equipment inspection, repair and overhaul program.

Overhaul high pressure Ingersoll Rand multi-stage Boiler Feed Water Pumps, various low pressure vertical multi-stage and horizontal pumps.

.

Safety

36 months Safety Committee Member.

Develop and administer machine shop equipment safety training program.

Review and develop safety procedures for compliance with OSHA requirements.

Develop Job Hazard Analysis procedures for use during task planning and performance.

Attend North Carolina Industrial Commission 30 hour OSHA compliance course

U.S. Navy, Shore Intermediate Maintenance Activity, Charleston, SC 1990 - 1993

Planner and Estimator

Perform on-site inspection to determine scope of repairs to be accomplished.

Prepare plans and estimates for repairs of equipment and systems onboard Naval vessels.

Train new planners.

Machine Shop Production Chief

Supervise the training and production work of 32 personnel.

Perform quality assurance inspections to ensure compliance with standards and procedures.

Machinist/Machinery Repairman

Repair and manufacture parts and machinery.

Operate machine shop equipment.

Use precision instruments.

United States Navy 1979 – 1990

Various assignments to sea and shore maintenance facilities

USS Monongahela 1985 - 1990

Repair Division Supervisor - Supervision of 10 personnel. Prepare equipment PM scheduling.

Shore Maintenance Facility, Little Creek, VA 1983 – 1985

Inside machine shop - Repair and manufacture of equipment and components.

USS Yellowstone 1979 – 1983

Auxiliaries – Responsible for ship board systems including refrigeration chillers, cargo elevators, emergency diesel generator.

Outside machine shop – Remove, rebuild and install various types of equipment

Operate portable machining equipment for in place repair of high pressure steam valves.

Tex Ark Joist, Hope AR 1978 - 1979

Production worker

Operate metal shears and overhead cranes.

Perform MIG welding.

Education and Training

Industry Training and Certifications

April 2015-Airborne/Structure borne Ultrasound Level I (UE Systems, Elmsford, NY)

March 2015 - NFPA 70E Electrical Safety for Qualified Electrical Workers (Shermco Ind., Irving, TX.)

January 2015 - Thermal Infrared Thermography Level I (Snell Group, Barre, VT.)

July 2013 - Scaffold Competent Person Training (Brewer Equipment Co.)

May 2013 – Steam Turbine Fundamentals (Mechanical Dynamics and Analysis, Ltd. 19 British American Blvd, Latham, NY 12110)

May 2011 - Cause Mapping I (ThinkReliability –thinkreliability .com)

March 2008 – 30 hour OSHA safety training (North Carolina Industrial Commission)

April 2007 - United States Department of Labor and North Carolina Department of Labor, Certified Plant Maintenance Technician.

August 2005 - Field Balancing Seminar (Technical Associates of Charlotte) passed competency test.

March 2005 - Rotolign Pro Laser Shaft Alignment (Voelzo & Company)

August 2004 – Vibration Analysis III (Technical Associates of Charlotte) passed certification exam.

April 2002 – Oil Analysis I (Noria Corporation) Certified Level I Machine Lubricant Analyst.

September 2001 - Rotolign Pro Laser Shaft Alignment (Voelzo & Company)

April 2001 – Vibration Analysis II (Entek) passed certification exam.

April 2000 - Vibration Analysis I (Entek) passed certification exam.

Education

Red River VoTech - Hope, AR. 1978-1979

Machine Shop

Eldorado Community High School, Eldorado, IL.

High School Diploma. Graduate class 1978.

References:

Donald R. Keisling

Westmoreland Partners

CEO and President

Roanoke Valley Energy Facility

290 Power Place

Weldon, NC 27890

252-***-**** ext: 230

dkeisling @westmoreland .com

Eric Woods – Roanoke Valley Energy Facility

Weldon, NC 27870

Plant Manager

acq2ra@r.postjobfree.com

252-***-****

Kenny Carter

Team Leader/West Paint/TMMI

523 Abelson Dr.

Carmi, IL 62821

618-***-****

James Sawyer

Allied Reliability Group

4200 Faber Place Drive

Charleston, SC 29405

Director of CBM Operations

acq2ra@r.postjobfree.com

901-***-****



Contact this candidate