Post Job Free

Resume

Sign in

Construction Project

Location:
Henderson, NV
Salary:
65000
Posted:
May 22, 2015

Contact this candidate

Resume:

Rameses Sorrell, *** N. Genesee Ave. Los Angeles, CA, 90036, 323-907-

****, acptpx@r.postjobfree.com

Jah Jah Productions- Los Angeles

September 2005 - Present

Project Manager/Project Coordination/Transportation/Design/Build/BIM/CAD

Drawing Coordination

Client: Kroger for LazerCAD

December 2014 - Present

. Building survey assessments of mechanical structures and

equipment

. Duties: Made physical survey assessments of building elements

including placement of structural elements such as columns, beams,

joists, decks, racks, and mechanical equipment

Client: O'Reilly's Auto Parts for The Trinity Group

June 2012 - December 2013

. Building survey assessments of mechanical structures and equipment

. Duties: Made physical survey assessments of building elements

including placement of structural elements such as columns, beams,

joists, decks, and mechanical equipment

Client: Mona Metwalli for Thomas Halstead Interiors

December 2012 - February 2013

Site survey, as built and remodel

. Recently completed site survey for high-end condominium in

Beverly Hills

. Created new As-builts of existing floor design then created new

construction document sets including electrical layout for newly

remodeled condominium designs

. Use AutoCAD for 2D drawing creation

Client: Ray E. Brown AIA & Associates

January 2006 - December 2011

BIM/CAD Manager/Drawing Set Coordination/Structural Details/ Hospital

Remodel

Architect Assistant /Surveys Work/Field Measurements/Fixtures

. With Ray E. Brown we surveyed the site and produced a

completely new set of accurate as-built drawings

. Ensured no error when the time came for construction of the

project

. Completed project turned out so good we were asked to upgrade

the existing area to new remodel standards

Client: Guller Padilla Designs

June 2006 -

September 2006

BIM 3D Renderings/CAD Management/Low Income Housing Resolution

. Commissioned me to produce and manage a full set of BIM 3D

Design layouts and drawings

. BIM 3D Computer generated renderings were produced to convey the ideas

for a new housing project in Palm Springs

. Based on steel containers this series of designs will

revolutionize the low income housing development dilemma

. Responsible for supervision and delegation of work to other

drafters on team

Wyzant Tutoring Services

December 2012 - 2015

Tutoring services in AutoCAD and Revit

. Assisted several Engineering and Design students at USC, UCLA, CSUN,

etc. with the completion of BIM related AutoCAD and Revit assignments

. Use Revit and AutoCAD to create complex 3D building geometries

. Proficient with Revit and AutoCAD

. Proficient with Auto CAD

. Experience in 3D design

Contract Work

Client: Disney Imagineering for Cunningham Group(Contract)

January 2012 -March 2012

MEP CAD Architect

. Budget: $1,000,000,000

. Hired as contractor on the Paradise Cove/Treasure Island team to

produce construction document sets and structural details using BIM

AutoCAD software for Pirates of the Caribbean area ride and

surrounding facilities

Client: Chipman Adams Pacific- Pasadena (Contract)

September 2006- December 2006

Tenant Improvement/Architect Assistant

. Junior Associate/CAD Work/Retail/Fixtures Projects- Ulta Hair Salons-

Meza, AZ, Phoenix, AZ, etc.

. Sketchers Retail Shoe Stores- Florida Tenant Improvement, Model Store

Roll-Outs, Fixtures

-Helped minimal staff produce and complete Construction

Documents sets for the Ulta Hair Salons and Sketchers Retail

shoe stores in Florida

. These documents sets included Tenant Improvement Floor Plans, Finish

Plans, Reflected Ceiling Plans, Lighting Layouts, Fixture Plans and

Furniture Plans, Interior Elevations, and Exterior Elevations for

stores in Mesa, AZ, Phoenix, AZ, etc.

Client: Nadel Architects, Los Angeles, CA (Contract)

July 2005-September 2005

Retail Site Planning/Civil/ AutoCAD Draftsperson

. Projects- Apple Valley, Hesperia, Perris, etc.,

. Tenants- Target, Wal-Mart, Lowes, Home Depot, Kohl's, Bank of America

. Produced site plans for large 1,000, 000+ S.F. Retail shopping centers

which included parking facilities

. Working from satellite images and CAD generated Civil drawings

. Produced multiple preliminary site plans

. Compiling data analyses for planning and completion of accurate

drawings after initial design

. Ensuring proper presentation of site layout according to civil

calculations

. Designs are based on tenant/ developer negotiations, translated to me

and then put into CAD drawings

Client: Lee+Burkhart+Liu Architecture/Planning/Interiors (Contract)

April 2005 - June 2005

Award Winning Project/Hospital Master Planner Assistant/Structural/AutoCAD

Draftsperson

. Projects- Santa Barbara Cottage Hospital, 2000+ Sheet Drawing Set

Coordination/Structural Details, $100,000,000+ Budget, architects of

the new LAC+USC hospital, Produced Construction Documents and

structural details

. I worked closely with the Master Planner producing custom structural

details for steel wall interfaces; assisted with the conception of

ideas into reality for the remodel of the Santa Barbara Cottage

Hospital; meeting the goals of easy patient care & OSHPD guidelines

. The SBCH is an award winning project

Architects: Wolcott Architecture Interiors (Contract)

December 2004 - March 2005

Projects: THQ/Trammel Crow/Larry Flynt

. Created full construction document sets which included floor, lighting

and fixture plans

. Drawing sets included reflected ceiling plans for placement of lights

. Signage, emergency lighting, etc.

. Created construction documents detailing cloud duct systems that would

be used in the corporate office remodel of THQ

. Also produced numerous construction document sets showing locations of

power, thermostat, light controls and telephone connections within the

many tenant improvement projects

. Worked from Engineer's markups and sketches under minimum

supervision

. Learned new programs as required by individual projects

JAH JAH PRODUCTIONS MEP Project List

Hospital Projects

Architects: Ray E. Brown & Associates

January 2006 - January 2009

Project: Huntington Hospital

. Worked on several different projects with Huntington Hospital

. Produced several drawing sets which included work on MEP facilities of

the hospital

. Work often included creating generator layouts, plumbing line systems,

details for anchoring of equipment, etc.

Architects: Lee Burkhart Liu

April 2005

- June 2005

Project: Santa Barbara Cottage Hospital

Budget: $300,000,000+

Sheet Set Size: 2000+

. Responsible for drawing set coordination

. Responsible for putting together and coordinating the many floor

plans, interior elevations, sections, etc. for this multi-level,

phased construction project

. Duties included working with the Master Planner to meet OSHPD approval

comments (Drawings were approved)

. Ensured outputs met the required standards and agreed deadlines

. Created Structural details for steel frame construction staircases,

handrails, pneumatic message system, walls, etc.

. Also coordinated and designed Interior Design layouts for nurse

stations, Critical Care areas, Surgery areas, Post-Partum, etc.

. Worked on the design and floor plan arrangement of Physicians area,

Exam rooms, Pharmacy, Patient Recovery areas, Patient Pavilion,

Admitting, Radiology, and multiple work rooms

. Responsible for drawing the heli-pad on the roof top area of the multi-

level hospital

. Created details of steel framed wall types, doors types etc. in the

drawing that represented the proper rating for these elements

according to OSHPD regulations

. Also input information about most advanced medical equipment, beds,

medical devices, lighting and instruments that would be first used in

this award winning hospital to create both a patient and doctor

friendly hospital that services the entire community

Entertainment/Tenant Improvement

Architects: Ray E. Brown & Associates

January 2006 - January 2012

Project: Inglewood Unified School District Adult School

. Worked on the revamping of the Inglewood Unified School District Adult

School

. This project required MEP consultant usage of AutoCAD files which I

prepared and often translated for clients use

. Worked with consultants to create HVAC layouts for projects

. Took responsibility for own work produced to a high standard.

. We created a new plan which includes school district administrative

offices, a beautician school with custom work stations, furniture

fixtures and amenities, lawyer's office, and computer center

. We produced several construction document drawing sets which included

placement of duct systems and multi-ton roof top air conditioning

units

. Developed lighting and electrical scheme that would serve the three

story educational facility

. Drawing sets included reflected ceiling plans for placement of lights

. Signage, emergency lighting, etc.

. Set up power and track layout for hairdresser units on first floor

. Created details for stud wall systems that would be used in the new

construction of the building

Architects: Ray E. Brown & Associates:

January 2009 - January2011

Project: SCE

. Created multiple details for generator units and anchoring systems for

several residential homes and facilities within the Southern

California and Arizona areas

. Use AutoCAD for 2D drawing creation

Architects: Lexington, USA

June 2007 - September 2007

Projects: Ferrari Land theme park in Abu Dhabi, United Emirates.

. Lexington was responsible for creating and designing three Ferrari

Theme park rides for the park which included trams, special effects,

visual amenities and custom props. I was

. Responsible for implementing the scene by scene transitions of the

ride into an information matrix. From this information matrix we were

able to give the conceptual ideas developed by designers a formal

structure. This enabled the ability for us to create construction

documents.

. Formal structure of information documentation lead to the further

development of ride scenes

. Conveyed a better understanding of the stage by stage transitions

through which the ride progressed

. Information matrix structure also allowed for the ride to be

constructed accurately according to designer plans and concepts by

overseas contractors in the field

Education

Santa Monica College, Santa Monica, CA

June 1994 - June 1997

Program: Associate of Arts Degree

. Concentration : Architecture

. Awards: Selected by School of Art and Design to display design

. Recipient: Alpha Gamma Sigma Honor Society, Certificate of Merit

. Certificate of Achievement in Mathematics

. Certificate of Outstanding Academic Achievement 3.49 GPA

. Certificate of Appreciation for completing transfer requisites

. Recipient: Black Collegians Academic Award

. Recipient: Wilson Brothers Building Award

University of Southern California, Los Angeles, CA

September 1997 - December 2000

Program: Bachelor of Arts Degree

. Concentration : Architecture/Religion

. Acquired Architectural and Graphic Design skills

. Including the use of Adobe Photoshop, Illustrator, AutoCAD, Form Z,

and other computer art working programs.

California Polytechnic State University, Pomona, Pomona, CA

September 2001 - October 2003

Program: March1

. Acquired Environmental Design, Graphics skills, and website

design

. Including the use of Adobe Photoshop, Illustrator, AutoCAD, Form Z,

and other computer art working programs.

. Completed case studies for Claremont Colleges proposed new

dormitories,

. Case Studies; Louis Kahn Erdman Hall, Hakuei Residence, etc.,

Mt. San Antonio College, Walnut, CA

September 2004 - June 2009

Program: 3D BIM Illustration

. 3D Modeling/Illustration, Civil Engineering Tech Courses,

. Actively involved in Graphic Design and 3D BIM Computer rendering

courses at the college

. Including the use of Adobe Photoshop, AutoCAD, Viz, Revit and other

computer art working programs.

East Los Angeles College, Monterey Park, CA

February 2011 - December 2011

Program: BIM/Revit

. 3D BIM Modeling/Illustration

. Acquired 3D Building Information Modeling skills

. Including the use of Revit computer Modeling programs and 4D

application of software.



Contact this candidate