Post Job Free

Resume

Sign in

Power Plant Construction

Location:
United States
Salary:
60.00 hr
Posted:
May 05, 2015

Contact this candidate

Resume:

MILLIE P SICARD

*** ****** ***. ***

Bellingham, WA 98226

Cell 225-***-****

Email: acpjf2@r.postjobfree.com

PROFESSIONAL SUMMARY

Twenty-seven years of experience drafting and designing piping systems for

Petrochemical, natural gas,nuclear and semiconductor facilities. Such facilities

include: North Slope Processing Facilities Pipeline & Drill Sites, Train, Truck &

Dock Loading Terminals, Refineries, Tank Storage Farms, Chemical Plants,

Nuclear Power Plant, Nuclear Clean up facilities, Compressor Stations, Sugar

Mill, and Pipeline Pump Station, Duties have included: 3-D modeling, design and

drafting, board drafting, inking and Leroy, field surveys, fire and explosion

rebuilds, as-built, project construction support. Typical drawings, documents

developed and revised for these projects include: Area Classification, Material

Take-Offs, Equipment Drawings, Miscellaneous Pipe Supports, orthographic

Plans, Sections & Details, Pipe line profiles, Stress Sketches, Pipe Fabrication

Spools, Isometrics, Demo Drawings, P&ID's, EMR's, Line Lists, As-Builds, Tie-In

Schedules, Standards Development, and Shutdown Schedules, Current North

Slope Training and TWIC cards.

COMPUTER SKILLS

Bentley V8i, Acad Rel. 2010, Autocad 2013, Autocad MEP, CadWorx 2013,

Navisworks Freedom & Review 2010, Raster Design 2008, Rebis 3D Auto plant,

Microstation Ver. J, Cad Overlay, Documentium, SAP, and Projectwise.

PROFESSIONAL EXPERIENCE:

May 2013 to Present

Bergalia & Associates

Assigned to Merrick & Companies- Denver, CO

Nana Worley Parsons, Anchorage, AK

Checker for grass roots crude unit in Montana. Responsible for checking

equipment, process, utility, and underground piping and skids units. I’m not only

checking for accuracy but sound design that will suit our client in operation of

their new facility.

Worked on core BP Alaska North Slope medium size projects. Projects include

pipeline replacement, and process facility projects. Projects varied from

appraise, thru execute phases.I worked closely with the client engineers, plant,

field engineers, and contractors. I was the lead designer or checker for most of

these projects. Used Autoplant and Autocad 2012 to model piping and

equipment isogen was used to extract isometrics.

June 2012 to May 2013

IT Network (Contract)

Assigned to GE Water and Process Technologies, Bellevue, WA

Bentley, Autocad 2010

Worked on grass roots waste water treatment plants. Modeled equipment such

as evaporators, pumps, filters and miscellaneous equipment for pretreatment and

process units.

March 2010 to June 2012

Bergalia & Associates

Bentley, AutoCAD MEP Piping Designer (Contract)

Assignments: Nana Worley-Parsons, Anchorage AK

CH2MHill Semiconductor Division, Portland, OR, Phoenix, AZ

CH2MHill Energy and Chemicals Division, Houston, TX

Worked on Alaska North Slope Capital Projects using Bentley software.Was

assigned projects and take it from a work order stage, coordinated with facility

engineers on scope of workwith field assessments and taking field dimensions

with no supervision. Either modifying existing drawings or creating new ones,

supply bill of materials for purchasing, weld bond forms. I was totally responsible

from the beginning of the project to IFC.

Modeled piping in (Autocad MEP) for grass roots semiconductor facility.Initially

joined the project early in the programming phase creating vendor drawings,

equipment arrangements, and building layouts.Responsible for routing piping for

Oil Free Air, Nitrogen, URO systems.

3-D modeled piping (Bentley), Cadworks 2010, extracted isometrics, created

plans, sections and details as well as checked all tie-in packages for existing

Shell Lubricants oil packaging facility. This piping involved piggable lines along

with all aspects of piping in blending and packaging facilities and a few small

engineering projects.

November 2008 to March 2010

Southwest Design Services

Bentley Piping Designer (Contract)

Assignment: Nana-Worley Parsons

ASRC Energy, Anchorage, AK

Modeled new pig launchers and receivers inside module buildings and utility

piping to interface with existing pipelines for BP North Slope projects.Created

plans, sections and details as well as extracted isometrics. Created EMR's for

materials and scope of work documents.

March 2006 to November 2008

Bergalia& Associates

Bentley Piping Designer (Contract)

Assignment:CH2MHill formally Veco Alaska, Anchorage, AK

Lead piping designer for several BP Alaska North Slope piping projects.

Generated new piping models to design piping manifold system located in new

module. On these models I created plans, sections, and isometrics along with

associated tie-in schedules, stress sketches, line list, demo drawings, and

material take-offs. Coordinated with fabrication and construction efforts.

Designed replacement of a water injection pipeline on Alaska North Slope.

Modeled pig launchers and receivers, located tie-ins to the existing piping.

Routed approximately 5 miles of 8 and 10 inch pipelines. Extracted isometrics

from model along with creating plans, sections and details. Compiled BOM’s,

coordinated with other disciplines and construction coordinators on the slope on

material and construction efforts. Also was assigned to pipeline project with

Russian company Rosneft in in the Vankor oil reserves. Interfaced directly with

Russian mechanical engineers to produce pipeline profile drawings.

May 2005 to March 2006

SRI TECHNOLOGIES, Schaumburg, IL

Bentley Piping Designer (Contract)

Assignment: Anvil Corporation, Bellingham, WA

Designed piping for capital projects and as-built units for Conoco Phillips facilities

on the north slope of Alaska.

May 2003 to May 2005

Staffing Technical Services

Rebis Piping Designer (Contract)(Suncor Refinery Expansion)

Assignment: Jacobs Engineering Denver, CO

Routed piping systems on major refinery expansion.

October 1994 to Sept 2001

FORD, BACON & DAVIS, LTD., Monroe, Louisiana

Piping Drafter/Designer(Exxon Mobile Refinery, Shell Chemical Projects, and

PPG)

Design piping projects on various jobs. Exxon Mobile projects involved heavy

field work to locate tie-ins to decommission an existing sphere and associated

piping.

December 1986 to October 1994

JACOBS ENGINEERING GROUP, Baton Rouge, Louisiana

Piping Drafter (Exxon Mobile, Chevron, Ciba, and BASF Projects)

EDUCATION

Completed 2 Semesters (1) Summer Drafting Institute (1) Engineering

Graphics, 1989

Louisiana State University, Baton Rouge, Louisiana

Continuing Education - Pipe Design, 1997

Louisiana State University, Baton Rouge, Louisiana

Completed all courses required, 1974

Glen Oaks High School, Baton Rouge, Louisiana

References shall be furnished upon request.



Contact this candidate