Post Job Free

Resume

Sign in

CAD Engineer

Location:
Algeria
Posted:
May 05, 2015

Contact this candidate

Resume:

JORGE CAYABAN LAMADRID

*** ****** ******* ************

Bo. Paciano Rizal, Calamba City

Laguna 4027, Philippines

Tel No. : +639**-***-****

E-Mail address : acpizj@r.postjobfree.com

SUMMARY Almost 23 years of experience working in multi-discipline

such as production supervisory, plant & building maintenance

supervisory, project monitoring, scheduling & control, and

proficient in producing high quality AutoCAD technical

drawings.

WORK EXPERIENCE

Sept. 15, 2010 Senior AutoCAD Engineer

present Taisei Phils.Construction, Inc.(TPCI)

Consortium Japonais Pour L' Autoroute Alg rienne (COJAAL)

Said Bousbaa, BP71, El-Harrouche

21400 Skikda, Algerie

. Preparation of temporary work autocad drawings of access

roads, yards and temporary facility.

. Preparation of section alignment and profile.

. Preparation and revisions of autocad drawings of steel

support fabrication of Tunnel re-bar arrangement and bar

bending schedule for invert and lining of Tunnel

Junction/intersection.

. Prepare volume calculation for excavation works and others.

. Preparation of surveyor guide for erection in site.

. Prepare shop drawing of Disposal area using Civil 3D

software.

. Prepare drawing list and distribution drawing to Site

Engineer and owner for construction approval.

. Prepare as-built drawing.

Nov. 3, 2008 CADD Engineer

Aug. 31,2010 K Engineering

No. 2 Sun Andres Street

Sun Valley, Para aque City

. Coordination of activities concerning Civil, Mechanical,

Electrical and other section for proper execution of drafting

works. Mainly detail drafting of fire protection system

drawings including the quantity take-off, plus drawing scale

design work, production of isometric from fire protection

piping layout drawings. Aside from the designated job also

perform duty for preparation and do small scale of scheduling

and continuous update / revise project construction schedule

in Bar Chart using Microsoft Project 2007 software as a tool.

. Responsible for all drawings need for entire projects such as

Piping and Instrument Diagram (P&ID), Electrical, Mechanical,

Civil, Piping and Fire Protection drawings. As built finish

project actual in field and incorporating revision to AutoCAD

2009. Assistant to planning engineer: Functionally

responsible for planning and scheduling to update monthly

progress chart.

. Responsible for the computer maintenance of different job

sites, upgrading and software's installation including

repairs and troubleshooting.

Oct. 1,2006 Senior AutoCAD Operator

Sept. 5,2008 SkyOryx Joint Venture

Asiakonstruk Development Corp.

New Doha International Airport Project

Doha, State of Qatar

. Involve in the preparation of electronic drawings based on as

built on-site condition for submittal and approval of client.

. Responsible in reviewing construction and shop drawings

prepared by the client prior to implementation by site

engineer supervisors. Any discrepancies on present site

situation will be immediately reported to the construction

manager for coordination to the client.

. Calculate and prepare concrete pouring estimate and sequence

using AutoCAD 2008 software.

. Perform other job assigned such as the following:

a) Monitor and prepare daily, weekly, monthly project

accomplishment including manpower loading monitoring.

b) Prepare two weeks rolling schedule utilizing Microsoft

Project 2007 software with all its components and other

schedules needed for the project as envisaged right from

the Primavera software prepared schedule in close

coordination with the Construction Manager.

c) Regularly updates Resident Project Manager regarding

project schedule and progress.

d) Responsible in monitoring and preparation of dayworks

accomplishment reports. This also includes daily time and

labor report preparation and submission.

e) Monitor and prepare project accomplishment report

utilizing AutoCAD 2008 and Microsoft Office 2007

software.

Aug. 6,2003 Maintenance Supervisor / Pollution Control Officer

Sept 15, 2006 Storck Product Inc.

Silangan, Airstrip Street

Canlubang, Calamba City, Laguna

. Manage and supervise the operation and maintenance of the

plant & all major facilities including its accessories and

support machinery this includes wastewater treatment plant.

. Planning and implement the solid waste and water waste

programs as per government standards and regulations.

. Regularly review all maintenance reports, checklists and

preventive maintenance procedures done by the section heads.

. Regularly check and review performance of staff especially

that of mechanical, electrical heads and project engineer.

. Recommend training for engineers and maintenance technicians

when the need arises.

. Conduct a regular plant and building inspection.

. Prepare electronic plans any additional or innovative ideas

necessary for the improvement of the system using AutoCAD and

Microsoft Project software's.

. Review / monitor the preparation and implementation of

projects, such as pre-construction documentation and plans,

construction progress, completion of punch lists, completion

of post-construction requirements and performance review of

accredited contractors and suppliers.

. Manage and supervise the housekeeping of semi-common areas,

common areas and exterior perimeter of the plant.

. Implement an effective pest-control program for the plant.

. Implement fire and safety programs.

. Implement an effective solid waste disposal and waste water

treatment plant operation.

. Prepare preventive and corrective maintenance schedules

utilizing Microsoft Project w/ all its components.

. Designated as company Pollution Control Officer (PCO) with

duties & responsibilities as DAO 26 series of 1992

2000-2003 PROJECT CONTROLLER / COORDINATOR

V-LINK Construction Corporation

Blk 3 Lot 4 San Andres Street

Brgy. Sun Valley, Para aque City

. Prepare cost estimate in all discipline (Civil, Mechanical,

Electrical, and Architectural) to guide the Owner in

budgeting to ensure that the project as conceived is within

his financial resources.

. Develop work programs to provide realistic basis for

establishing target dates for project, utilizing suitable

programming tools as Primavera Project Planner. Prepare

plans, scheduling and monitoring of all activities, such as

Civil and Architectural, Electrical, Plumbing, Sanitary,

Mechanical and Fire Protection works utilizing Microsoft

Project Software.

. Evaluate bids received from contractors/suppliers to

determine the offer most advantageous to the Owner.

. Ensure close compliance of the contract documents by the

General Contractor and specialty contractors and sub-

contractors and report violations, if any to the Owner.

. Inspect materials delivered to ensure that they conform to

the quality specified in the contract.

. Conduct coordination meeting for both management and

technical with the Owner and all contractors concerned with

the project. This includes preparation of minutes, agenda,

and weekly, monthly accomplishment reports.

. Undertake regular inspections to ensure that the work is

executed in accordance with the contract and approved plans

and specification. Prepare status report to reflect the state

of the contract up to date including cost of all authorized

variations and/or change orders.

. On completion of work as per contract documents, conduct

inspection to ascertain that the project on the whole has

been executed in accordance with the contract and approved

plans and specification.

. Prepare necessary working drawings and details using AutoCAD

for any revisions needed prior to execution of the project

this includes also analysis of the approved plans for any

discrepancies that have been found prior to construction.

. Prepare a certificate of acceptance to the Owner for their

approval before the Owner releases all final payments.

. Attend pre-qualifying meeting and submit cost proposal to a

possible client.

July - Nov MAINTENANCE SUPERVISOR

1999 Haribon Industries, Inc.

Citibank Center Building Corp.

8741 Paseo de Roxas, Makati City

. Perform direct personnel supervision and disciplining.

. Supervise regular and periodic maintenance procedures on all

major equipments its accessories and support machinery.

. Compile all maintenance reports and checklist and prepare a

monthly report to be submitted to the Building Engineer.

. Prepare up-dated equipment records; this includes proper

documentation and record filling of equipment manuals,

preventive maintenance routine checklist and other pertinent

data.

. Prepare necessary working drawings and details using AutoCAD

for any revisions needed on additional projects in preventive

maintenance activities that are performed assigned by the

building engineer.

. Attend to tenant calls and service request to be coordinated

with Maintenance Foreman for proper response.

1996 - 1999 PRODUCTION SUPERVISOR

Asia Brewery, Inc.

Bo. Sala, Cabuyao, Laguna

. Provide leadership and supervision to the assigned production

areas.

. Effectively motivate, train and communicate to the assigned

team to assure superior level of safety, reliability,

sanitation and quality.

. Insure individual and team level of performance meet or

exceed goals and expectations.

. Prepare and conduct daily team meetings as necessary for

proper communications and development of team.

. Communicate with the Maintenance and Quality Assurance staff

and create a cooperative environment on the assigned shift.

. Develop an intense knowledge of the production process and

all associated equipment.

. Analytically and systematically trouble-shoot manufacturing

issues and develop the team to be self-directed in the same

activities.

. Perform daily checks and report to insure the highest quality

of product produced within good manufacturing practices.

. Participate on the lead project teams that improve safety,

quality, reliability, sanitation and waste reduction.

. Prepare the daily, weekly, monthly and annual production

inventory stocks.

. Responsible also in the preparation of weekly production

schedule prior to the given schedule of the production head.

. Responsible in the operation, preventive maintenance check,

monitoring of all production forklift and supervision of all

production forklift operators.

Jan - Mar PRODUCTION TECHNICAL STAFF

1996 Nugget Food Corporation

SMI Compound C. Raymundo Av.

Bo. Maybunga, Pasig City

. Provide technical information to the Plant Manager such as

necessary revision and addition of equipment's, etc.

. Provide technical information to Production Officers

regarding proper standard operating procedures of equipment's

and plant operations.

. Provide technical drawings using AutoCAD in preparation to

any given or proposed projects needed in the production and

maintenance activities.

. Coordinate to the Maintenance Department any reported

troubles encountered during operation for necessary

alterations or repairs needed to ensure smooth and continuos

flow of production.

Jan 1995 SALES ASSISTANT / MACHINE SHOP QUALITY CONTROL

Jan 1996 Ebara Benguet, Inc.

Canlubang Industrial Estate

Bo. Diezmo, Canlubang, Laguna

. Prepare quotations based on the estimate of Engineering

Department and submit to Sales Manager for approval.

. Conduct arrangement of meeting to the Clients and set

appointments.

. Prepare weekly, monthly sales report and perform other jobs

that may be assigned from time to time.

. Responsible in all inspections of given specifications of

rough castings and machined castings such as the surface

quality, dimensions, defects, hydrostatic pressure testing,

etc.

. Analyze and prepare necessary revised inspection drawings

using AutoCAD, plans that are found having discrepancies

against inspection specification.

. Make a necessary report any discrepancy found during

inspection of such castings by evaluating and classifying

casting defects or failure during the process and provide

information to the machine shop for the repair needed if any.

Jan 1991 SHIFT SUPERVISOR / AutoCAD Operator

Sept 1993 Visayan Brewers Company, Inc.

Asia Brewery, Incorporated

El Salvador, Misamis Oriental

. Perform direct personnel supervision and disciplining.

Strictly implemented Company Rules & Regulations. Prepare

monthly evaluation performance report of subordinates to be

submitted to the Process Head.

. Responsible for the preparation of detailed work assignment &

properly implemented to sub-ordinates.

. Supervise proper brewing operation procedures to ensure

smooth and continuos flow of production such as corrective

measures needed, trouble shooting, etc.

. Coordinate to Utilities Department for the supply needed of

the process by preparing schedules. Also give information of

the equipment's performance during operation so that

preventive maintenance will be properly monitored.

. Prepare inventories of all Brewing materials and forecasted

report based on the brewing schedules given by the Process

Head.

. Perform other jobs that may be assigned from time to time

such as preparing mechanical plans using AutoCAD including

piping layout, equipment design and P&ID. Provide detailed

design and fabrication drawings. Supervise any additional

installations of pumps, motors re-piping and electrical

instrumentation's and controllers.

. Responsible in the preparation of all conversion of drawings

such as mechanical, electrical, civil, architectural by

coordinating to the respective departments any revision made

in the approved plans given and perform necessary computer

maintenance if there are any adjustments or additions that

will help for the advancement of the system.

EDUCATIONAL ATTAINMENT

BS Aerospace Engineering / Airframe & Powerplant Mechanic Course

Airlink International Aviation School

Domestic Road, Pasay City

Class of 1990

TRAINING AND SEMINARS

COMPREHENSIVE COMPUTER Crescent Technologies Institute, Inc., Manila

TECHNICIAN COURSE August 7 - September 19, 1993

COMPREHENSIVE COMPUTER General Engineering & Computer Training Ctr.

AIDED DESIGN & DRAFTING August 15 - September 10, 1990

BASIC FIRE SAFETY SEMINAR SPI Corporation, Canlubang, Calamba City

March 16, 2005

HOW BOILER COMPLY with the CIMECH Boiler

CLEAN AIR ACT held at PICC Forum, Manila

June 23, 2005

ENVIRONMENTAL REGULATIONS, Laguna Lake Development Authority

WASTE MINIMIZATION and held at Camelot Hotel, Quezon City

POLLUTION PREVENTION August 17-19,2005 (equivalent to 40 Hours)

INDUSTRIAL WASTE WATER Yana Chemodities, Inc.

MANAGEMENT YCI Bldg. 151 Kaliraya St., Quezon City

August 24,2005

ENVIRONMENTAL COMMUNICATIONS Department of Environment and

Natural Resources

and SELF-MONITORING REPORT Calabarzon Region, Pollution Control

Association of the

FAMILIARIZATION Philippines, Inc, Region IV (PICAPI-Region IV)

Technopark Hotel, Green Field Auto Park,

Sta. Rosa, Laguna

September 28 - 30, 2005

KNOWLEDGEABLE SOFTWARE

AutoCAD 2015 (Advance)

AutoCAD Civil 3D 2010 (Moderate) Microsoft Visio 2007 (Advance)

Microsoft Project 2007 (Advance) Microsoft Office 2010 (Advance)

Primavera Project Planner, P6 (Intermediate) Adobe Photoshop, CS5

(Intermediate)

Solidworks 2013 (Intermediate)

PERSONAL INFORMATION

AGE : 47 years old

CIVIL STATUS : Married with three children

HEIGHT : 172 cm

WEIGHT : 64 kgs.

RELIGION : Protestant (Evangelical)

CITIZENSHIP : Filipino

DATE of BIRTH : January 15, 1968

SSS No. : 04-0784642-7

TIN No. : 109-689-300

PASSPORT No. : XX3192555

[pic]



Contact this candidate