Post Job Free

Resume

Sign in

I&C - Automation Engineer

Location:
Saudi Arabia
Posted:
April 30, 2015

Contact this candidate

Original resume on Jobvertise

Resume:

RESUME

Satyajeetsingh H Gour

E-mail: acpgff@r.postjobfree.com

Mobile No.: +82-10-314*-**** (South Korea)

Company Duration and Role Work summary

Daelim Feb-2012 to Till Engineering coordination with IPCS Vendor.

Industrial Date Detail Engineering for SADARA - TDI Plant

Co., Ltd. Process Automation Project

Seoul, South Engineer Co-ordination with Client & Vendor,

Korea.

WestingHouse Apr-2011 to Logics Implementation, Functional allocation,

Engineering Feb-2012 System Architecture, Functional Requirement

Centre- Team Lead Capturing.

Infotech

Enterprises

India Ltd.,

Samsung Apr-2010 to Vendor/ Licensor / Client Coordination at Vendor

Engineering Apr-2011 facility,

India Ltd., Control System FAT, Dual Feed Ethylene Cracker Logics

Noida Engineer Implementation, Complex Loop Narratives, Cracker

Operating Manuals.

Honeywell July-2006 to Functional Design Specification for DCS, ESD and

Automation Apr-2010 F&G.

India Pvt. Engineer Detailed Hardware Engineering for DCS, ESD and

Ltd., Pune F&G Systems.

FAT (Factory Acceptance Test )

SAT (Site Acceptance Test )

Erection & commissioning of Systems.

Training / Certifications:

. TUV Certified as Functional Safety Engineer. TUV ID No. 2820 /

10

. Honeywell Experion PKS SCADA & Controller Implementation

. Honeywell DCS -- TPS (HPM) and C-200 controller

. Honeywell Fail Safe Controller (FSC) and Safety Manager (SM)

Controller

. Six Sigma (Green Belt) Certified at Honeywell.

. Safety training for offshore.

Key Skills:

. Kick-off Meeting & Scope of Work, Schedule

. DCS and Safety System(ESD & FGS) Hardware and Software Functional

Design Specification and Detail Design

. Power and Heat Load calculation for Control system

. System, Marshalling & Power Cabinets GA drawing

. IO Assignment and Marshalling Cabling Database

. Third-party system interface, communication configuration & testing

(Serial - RS232/RS485, Modbus TCP/IP)

. EPC Inter-disciplinary Document review

. Licensor / Client Meeting and design clarification

. P&ID review & Markup Updates

. Management of Design input Change and thorough Documentation

. Prepare Cause & Effect (C&E), Control Narrative.

. Develop & Implement Logic as per P&ID, C&E, Control Narrative in

Control System.

. Plan Pre-FAT and FAT as per project Schedule

. Cold and Hot Loop Check and Pre-Commissioning & Commissioning

Activity

. Site Installation, Erection and SAT (Site Acceptance Test)

Present Employer:

Daelim Industrial Co., Lt., Seoul -South Korea

1. SADARA Isocyanates Plant- Al Jubail, KSA (Presently Working on

Engineering)

Licensor: Dow Chemicals Company.

System: ABB 800xA DCS Control and Safety System.

. Co-ordination with Daelim Process and DOW for design documents

. Detail Engineering with good understanding of TDI plant

. Define and Implement Control Strategy & Interlocks

. Intense testing of Dynamic Model (RSI-France) and Control logic

for CV-OTS -- TDI Plant.

. SIS logic implementation and testing

. Vendor prints Review & coordination with IPCS Vendor.

2. SAHARA and Ma'Aden Petrochemical Company (SAMAPCO) - Al Jubail, KSA

System: Yokogawa Centum VP DCS, ProSafe RS ESD/ FGS.

. Co-ordination with Daelim Process Team, Logic Preparation and

Pre-SAT

. Co-ordination with Vendors

. Conducting Site Acceptance Test (SAT) for Yokogawa DCS / SIS /

FGS and successfully completed.

Previous Employers:

Westing Engineering Centre, Infotech Enterprises India Ltd., Hyderabad

1. Sanmen Nuclear Power Station, Sanmen, China

System: Ovation DCS - Emerson

. Functional Requirement Capturing.

. Logic Implementation in Ovation

Samsung Engineering India Ltd. (SEIL), Noida

1. ONGC Petro additions Ltd. (OPaL Ethylene Project), Bharuch (USD 1.4

Billion)

System: Honeywell C300 DCS, Safety Manager (SM) ESD/ FGS.

. Primary Link between System Vendor & Samsung

. Responsible for all Coordination activities like

o BPCS / SIS / FGS Engineering

o BPCS / SIS / FGS Integrated Testing

o I/O Assignment

o Troubleshooting for Technical queries

. Responsible for Hardwire design issues for

o System Cabinet

o Marshalling Cabinet

o Hardwired Console Layout

o Power Supplies

o IO Database preparation

. Power and Heat Load Calculation

. Conducted FAT (Factory Acceptance Test) for Ethylene Cracker

Unit

. Lead a team of 3 engineers as area lead for Cracker for detail

Control System engineering.

. Control Room Layout

. JB Grouping

. Logic development as Licensor P&ID, Control Narratives and

Interlock(C&E) for Dual Feed - Ethylene Crackers Units.

Honeywell Automation India Ltd. (HAIL), Pune

1. Sulphur Recovery Unit-3 - HPCL, Vizag.

System: - Honeywell Fail Safe Controller (FSC) with

Honeywell High Performance Manager (HPM).

. Logic Implementation in FSC Controller.

. FSC interface with Honeywell HPM(TPS) system.

. Conducting FAT of the total integrated system: Complete Hardware

and software & Loop checking.

2. LPG Mounded Bullet - IOCL, Baroda

System: - DCS C-200 with Plantscape Scada with

FSC safety system (ESD system) On MODBUS.

. Third party communication with Enraf and E&H CIU on MODBUS.

. Logic Checking along with Graphics Linking and Hot loop checking

and commissioning of the plant.

3. Gas Receiving Terminal - IPCL, Nagothane

System: - Honeywell High Performance Manager (HPM).

. Involved in FAT: Hardware check, software Logic check, IO Loop

check.

. MODBUS communication with RTU: installed a BOW networks protocol

converter, that Converts Nokia Connitel 2025 protocol to MODBUS

protocol.

. Panel Installation, Powering Up system and Pre-commissioning.

4. Green Fuel Emission Control - HPCL, Chembur (Mumbai)

System: - EPKS (C-200 release 301) on FTEB and FSC safety system

. DCS C-200 and FSC system powering up.

. On site Logic Checking along with Graphics Linking & Loop

Checking.

. Pre-commissioning of the plant.

5. ONGC - SH Complex OFFSHORE (ONGC-South field).

System: - EPKS (C-200 release 210) on FTEB and SM

& FSC safety system (ESD and Fire & Gas system).

. Logic checking and graphics linking with logic.

. HART Maintenance system: configuration of transmitters

(Cornerstone software).

. Commissioning of DCS, ESD & F&G system.

6. Successfully completed SAT at MRPL - LPG Mounded Bullet Storage

Facilities

7. Hindustan Oil Exploration Corporation Ltd. - Cuddalore

. Logic Understanding and Implementation in Honeywell Safety

Manager System as ESD system.

8. LPG & Propylene Mounded Bullet Storage Facilities Project - HPCL,

Vizag.

System: - Safety Manager (Safety Builder release R131.5)

. Preparation of Functional Design Specification for ESD System

. Detail Engineering: BOM preparation, System Hardware Designing

. IO Assignment, Wiring Database Preparation

. Logic understanding & development

. Panel Installation, Powering Up system and Pre-commissioning

. Planning, Erection & installation of field instruments & F&G

detectors and accessories (Cable tray routing, Glanding)

. Planning, Erection & installation of Junction Boxes and

accessories (Cable tray routing, Glanding)

9. New DCS for BPCL KRL Unit Project.

. Preparation of Wiring Database.

. Logic development as per Process write-up.

Academics:

Education Institution Year of % Of Remarks

Passing Marks

BE S.G.G.S I & T, Nanded. June-2006 70% Distinctio

(Instrumentation) n

H.S.C (XII) M.G.M College, Ahemdpur, Dist. June-2002 89.46% Distinctio

Latur. n

S.S.C. (X) Gyan Mata Vidya Vihar School, May-2000 80.80% Distinctio

Nanded n

Personal Details:

. Marital Status - Married.

. Nationality - Indian.

. Languages known: English, Hindi

. Date of Birth: 06th August 1984.

. PASSPORT NO: F9872913

Present Address:

Room no. 1305, Hansan Officetel, 121-44 Dangsan-dong,

Yeongdeungpo-gu, Seoul, South Korea.

Mobile: +82-10-314*-****.

Permanent Address:

C/o Heerasingh Gour, Renuka Niwas, A-1, Madhuban Residency,

Opp. Shama Gas Agency, Purna Road, Nanded - 4310605 (MS) India.

Mobile: +91-904******* (India)



Contact this candidate