Lawrence P Mitchell
[pic]
***** ***** *** ******* #***, San Antonio, TX 78258 acpc7x@r.postjobfree.com Tel
Personal Statement
[pic]
I am currently a Regional Manager with over 15 years Engineering and
Project Management, Project Engineering and Estimating experience in
positions of increasing responsibility in material handling project based
companies. I am an effective communicator and facilitator; I know how to
get the job finished on time and under budget.
Career Objective
[pic]
I am looking to advance my career growth in a Project Management or Project
Estimating Manager position in a material handling based company that will
be provide challenging project opportunities and will promote personal
advancement opportunities and education.
Transferable Work Experience
Regional Manager Texas Division / Sr. Project Manager
(June 2013 - Present)
Ergo Mechanical Industrial, San Antonio, Texas
. Responsible for the Management and Profit and loss for all the
projects in the Texas region. Expected Sales for the Region were
$500,000 in 2014. Actual sales for the region for last half of year
were in excess of $3,000,000 dollars.
. I am the main contact for the customers in our region, Caterpillar,
Toyota, Futaba International Texas, John Deere
. I handle all financial reporting for the projects with monthly (EAC's)
Estimate at completion.
. Track all deliverables for the project with milestone reporting
. Additionally, I participate in the sales and supply of custom material
handling equipment for our company and the installation of the
equipment in the plants.
. To accomplish the installations, I manage a group of (4) Site
Managers, (8) General Foremen, (4) Safety Managers and numerous sub
contract Union Labor.
. Create schedules needed for all the construction sites as needed.
. I perform as General Contractor on work in the area of Earth Moving,
Civil projects for stamping die press pits, and heavy machinery
installation and relocations which require HVAC, Electrical and
Controls, Concrete forming, and Piping installations
. Work with the Site Managers to help with Onsite Supervision of jobs as
necessary to help with overflow work.
. Responsible for creating and implementing the site specific Safety
plans for each individual construction site location
Project Execution Manager / Project Manager Large Projects (Apr
2013 - June 2014)
FlexLink Systems, Richardson, Texas
. I manage multiple complex industrial automation solution conveyor
projects; including planning, execution, control and close-out ranging
from $1,000,000 - $7,000,000 USD.
. Execute highly technical fast turn-around projects on-time, within
budgets while meeting contractual obligations, with a high degree of
focus on customer satisfaction.
. Track all deliverables for the project with milestone reporting
. I handle all financial reporting for the projects with monthly (EAC's)
Estimate at completion.
. I lead cross functional project teams that include internal and
external team members.
. Maintain quality of projects by adhering to the company's internal ISO
processes and standards.
. I manage a group of (3) Designers, (2) Project Engineers and (1)Junior
Project Manager day to day to insure all of the required projects in-
house are on track with the scope and schedule as submitted and agreed
to with the customer.
. During project execution I handle any scope or contractual changes by
proposing, selling and managing the change from start to finish.
. I manage installation crews of varying size during the installation of
a complex system, start-up and I direct any necessary changes needed
while installation is being performed.
. Occasionally, I develop design concepts, which includes costing and
detailed proposals during the bidding stage.
. I review and approve proposals and costing in relation to the Project
Management and technical and or contract feasibility before a proposal
is submitted to the customer.
Program Manager Category X Airports (Contract) (Jan
2012 - Apr 2013)
Boeing / NACC, Inc., Arlington, Texas
. As the Program Manager representing Boeing, I performed work on the
Task Order 19 material handling projects for the Western Region of the
United States, which encompasses more than (150) Airports, ranging in
value from $10,000,000 - $100,000,000 USD. I performed the following
duties during a typical deployment:
. Represented Boeing/NACC during the meetings with the TSA Regional
Deployment Manger meetings.
. Point of contact for Boeing/NACC to the all Air Carriers, TSA
Management and Airport, City and or County Authorities.
. Site survey of the existing checkpoint screening equipment to
determine customer needs
. Perform duties as Site Manager by managing a team of onsite
personnel, including CCTV contractors, IT contractors, Electrical
contractors, Rigging contractors and Security Screening Equipment
installers.
. I Plan, Schedule and track all project deliverables and milestones.
. I handle all reporting requirements to Boeing, TSA and Local Airport
Authorities on a daily and monthly basis.
. Effectively communicate and coordinate with local TSA Management and
Regional TSA Management when issues or concerns arise.
. I am responsible for all as-built documentation, red lines and final
walk through with local stakeholders.
. I chair lessons learned meetings to help improve and document any
issues that happened during the deployment.
Director of Estimating (Jan 2010 - Jan
2012)
Five Start Airport Alliance, Tavares, Florida
. Manage and generate quotes in house by utilizing a team of three
estimators and coordinating Engineering disciplines to accomplish
quality and detailed proposals for the baggage handling conveyor
industry. Proposed projects ranged from $50,000 - $40,000,000 in size.
My team quoted over (200) competitive bid projects with a successful
hit rate of more than 35% of the proposals being sold.
. Review proposal specifications and drawings to determine items that
must be included in the pricing and proposal. Create RFI'S
documentation to get clarification of discrepancies found in the
proposal documentation.
. Travel to Pre-Bid walk-through to determine if there are any special
factors that need to be accounted for in the pricing and proposal
document.
. Generate detailed equipment list to distribute to the other
disciplines on the bidding team, controls, software, and installation.
. Create a component take-off to generate the preliminary pricing.
. Obtain any quotes needed from outside vendors to complete pricing.
. Determine technical risk factors and quantify them in the risk
assessment tool.
. Work with Project Management to mitigate risk impacts to a potential
proposal costs.
. Create a summary of costs for Management review.
. Create comparisons against similarly completed projects and use as
baseline for pricing levels.
. Chair pricing meeting with Upper Management to finalize mark-ups
percentages and pricing.
. Prepare proposal documents that are required by our customers,
schedule of values, price per conveyor etc...
. Archive each proposal as submitted to the customer for use as needed.
. Generate proposal inputs as submitted to the project team and
participate in the Project kickoff.
. Perform change order work on existing project as the need arises.
Sr. Proposal Specialist (May 2007 - Jan
2010)
Siemens, DFW Airport, Texas
. Manage and generate proposals in house by utilizing a team of eight
(8) plus estimators and coordinating with Engineering disciplines to
accomplish quality and detailed proposals for FedEx Ground and UPS
material handling projects. Proposed projects ranged in value from
$1,000,000 - $70,000,000 USD.
. Review proposal specifications and drawings to determine items that
must be included in the pricing and proposal. Create RFI'S
documentation to get clarification of discrepancies found in the
proposal documentation.
. Travel to Pre-Bid walk-through to determine if there are any special
factors that need to be accounted for in the pricing and proposal
document.
. Generate equipment list to distribute to the other disciplines on the
bidding team, controls, software, and installation.
. Create a component take-off to generate the preliminary pricing.
. Obtain any quotes needed from outside vendors to complete pricing.
. Determine technical risk factors and quantify them in the risk tool.
. Work with Project Management to mitigate risk impact to a potential
proposal costs.
. Create a summary of costs for Management review.
. Create comparisons against similarly completed projects and use as
baseline for pricing levels.
. Chair pricing meeting with Upper Management to finalize mark-ups
percentages and pricing.
. Prepare proposal documents that are required by our customers,
schedule of values, price per conveyor etc...
. Archive each proposal as submitted to the customer for use as needed.
. Generate proposal inputs as submitted to the project team and
participate in the Project kickoff.
. Perform change order work on existing project as the need arises.
Lead Project Engineer (Aug 2004 - May
2007)
Glidepath LLC, Grand Prairie, Texas
. Responsible for designing complete baggage handling systems in 3-D
including but not limited to; Conveyor equipment, supports, catwalk,
platforms, integration of baggage scanning devices. Projects range in
size from $50,000 - $5.000,000.
. Travel to project sites and perform the initial site walk through to
determine obstructions and coordinate with other airport disciplines
to remove any found.
. Manage small group of designers to generate project drawings and
documentation required for submittals.
. Review project specifications and review proposal drawings to
determine if more information is needed. Create RFI'S to get
clarifications and document any out of scope items.
. Generate point load analysis and place into conveyor drawings for
submittal to customer, to ensure the existing facilities will not be
over stressed.
. Audit project budgets on a continuous basis to ensure that all
equipment costs are within the budgets specified.
. Create a monthly project report to submit to upper management at the
monthly project reviews.
. Performed dual role as Project Manager and Project Engineer on
projects < $3,000,000 USD.
Project Engineer (Jan 2000 - Aug 2004)
Siemens, DFW Airport, Texas
. Responsible for designing complete baggage handling systems in 3-D
including but not limited to; Conveyor equipment, supports, catwalk,
platforms, integration of baggage scanning devices.
. Travel to project sites and perform the initial site walk through to
determine obstructions and coordinate with other airport disciplines
to remove any found.
. Review project specifications and review proposal drawings to
determine if more information is needed. Create RFI'S to get
clarifications and document any out of scope items.
. Generate point load analysis and place into conveyor drawings for
submittal to customer, to ensure the existing facilities will not be
over stressed.
Cad Designer (Sept 1995 -Jan
2000)
Equipto, Addison, Texas
. Generated installation plans to properly install customer products
. Create proposal drawings of Mezzanines, shelving, and carts, so sales
can better implement their ideas to potential customers.
. Designed piece parts to upgrade existing products.
. Handled all technical support for sales force and their customers.
. Designed Fixture and store layouts for Mikasa
Education and Training[pic]
ITT TECHNICAL INSTITUTE,
Associate of Applied Science: Computer-Aided Drafting Technology
SAFETY TRAINING,
OSHA 30 Certification
Equipment and Software
Hardware: Lap Top and desktop computers, LaserJet printers,
Plotters, Software: AutoCAD ver. 12 through 2015, Autodesk
Inventor, Office XP products, Microsoft Outlook, Project, Excel,
Word, Power Point, Beam2D Beam analysis software, AS400,
Configura bid software