Post Job Free

Resume

Sign in

Maintenance Planner Scheduler

Location:
Houston, TX
Posted:
April 24, 2015

Contact this candidate

Resume:

Temo Perez

**** ******** ****** *****

Katy, Texas 77449

(C) 408-***-****

acpc22@r.postjobfree.com

EXPERIENCE

**/** - **/** ***

Fremont, CA

Maintenance Planner / Scheduler

. Was responsible for accurately identifying the

necessary time, tools, and parts required to properly

performing the department's maintenance tasks

. Was responsible for coordinating and communicating

the appropriate manufacturing manager the required

scheduled maintenance for the assigned dependent or

independent requirements for GMP and Non-GMP

. Utilized the CMMS within established work flows to

accomplish planning and scheduling activities to

include, but not limited to assigning work, reserving

parts, reserving tools, creating/revising PMs,

creating a weekly schedule, and reviewing completed

work orders

. Performed a key role in assisting with coordinating

and scheduling maintenance and calibration activities

during building shutdowns to optimize all activities

in an effort to reduce equipment downtime and thereby

increase equipment uptime

. Worked with central inventory in coordinating kitting

and bundling activities for planned work

. Meet with production planners and production

management to communicate and schedule required

equipment access to accomplish maintenance and

calibration activities

. Managed calibration tools and standards to ensure

timely standard calibration, and documentation

accuracy, ensuring that standards are always

available to allow completion of weekly maintenance

and calibration schedule

03/11 - 11/12 Boehringer Ingelheim

Fremont, CA

Maintenance Planner / Scheduler

. Provided effective and timely completion of

maintenance work by planning, scheduling,

occasionally supervising the manpower, materials,

equipment of maintenance, and by scheduling and

coordinating contract maintenance

. Worked closely with production and other supervisors

throughout the facility in making estimates,

determining priorities, and scheduling the crafts

. Was responsible for planning jobs, requisitioning

parts, maintaining work specifications, and

scheduling work, as needed

. Was responsible for the planning functions around a

planned maintenance shutdown, including planning

meetings, and scheduling of outside contractors

. Worked closely with operations, other maintenance

personnel, engineering, purchasing, and outside

contractors on a daily basis

04/07 - 03/11 Amgen, Inc

Fremont, CA

Maintenance Planner Scheduler / Senior Associate Vendor

Management of Site Services

. Once work request is submitted I prioritized,

planned, scheduled and followed-up on accuracy of the

job plan for all planned (PM, CM, GM) work

. Focused on day-to-day activities to be proactive and

optimize workforce productivity and minimize plant

downtime by managing work 2 weeks to 1 month in

advance

. The principle contact and liaison between the

maintenance department and operation planning

. Received all planned work request from assigned area

and determine validity and accuracy of information

and engaged the appropriate resources to set a

preliminary priority

. Identified and secured all parts and material

required to complete the work by providing central

inventory a Bill of Material for the work order and

any special kitting instructions

. Verified all material, information, tools, and labor

are available prior to scheduling

. Worked with maintenance leads, supervisors, and

planners to determine resource availability

. Was responsible for company programs and implemented

company policy to ensure total compliance with

contract duties between company and customer, by

performing the following duties personally or through

subordinate managers and/or supervisors

02/88 - 03/07 Pacific Maintenance Company Santa

Clara, CA

Regional Account Manager

. Managed the company's relationships with clients,

e.g. Pharmaceutical, Biotech, Production, and

Manufacturing companies

. Managed account compliance to ensure company

contracts are maximized to full potential and

resolved issues and ensure highest level of quality

service by coordinating with center staff and

management

EDUCATION

1995 West Valley College

Saratoga, CA

Completed course work towards Business Management

SKILLS

. CMMS, SAP, Oracle, Maximo 7.5 certified, Maximo 5.2,

Bilingual Spanish and English, Great Verbal and

Communications Skills, Strong Knowledge of MS

Project, Excel, Word, and PowerPoint



Contact this candidate