Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
Philippines
Posted:
April 21, 2015

Contact this candidate

Resume:

renando m. sy

** **** ****** ******** *********** Concepcion Uno, Marikina City,

Philippines (1807)

Cell no.: +639*********

Landline: 9484907

E-mail: acpaqi@r.postjobfree.com

o CAREER OBJECTIVE

To work with the company that would give me a good training and best

experience that would be valuable in the years to come and to work on

any position that suits my qualification.

QUALIFICATION SUMMARY

Essential Skills:

As a Foreman Linesman (United Kingdom - Balfour Beatty)

. Trained and competent on all works of refurbish 275kV overhead

lines.

. Can work as a team to achieve timely completion, safety

regulations and quality standards and project specification.

. Trained as a Chargehand on all works on a towers, platforms, and

deck

. Experienced on different type of conductors (Sorbus and Gap

Conductors.)

. Awarded a Level 2 Diploma in Electrical Power Engineering -

Overhead Lines 600/1673/5 (The City and Guild of London

Institute)

. Ability to interpret drawings, develop / interpret work,

instructions, and plan projects for self and others;

. Ability to climb poles and towers, work at heights, and work in

extreme weather conditions for extended periods of time.

. Trained and experienced on different kinds of overhead line

works

. Earthing, Blocking out and clipping in

. Catching Off and back hanging

. Fitting and joining conductor stockings, Jointing,

pressing and Jumpering

. Spacering (spacer trolley)

. Can work with minimum supervision.

As a Design and Transmission Line Engineer (Philippines - Meralco)

. High experience in design, construction, operation and

maintenance of 115 and 69kV sub- transmission line facilities.

. Ability on timely completion, implementation and processing of

115 and 69kV sub-transmission line projects and maintenance

activities.

. Has knowledge in cost estimation and billing of materials.

. Good background in electrical engineering

. Good working knowledge of a CAD system with significant fulltime

experience on using AUTOCAD.

. Ability to provide ideas and creative solutions to design

problems.

. Excellent working knowledge of engineering drawings and working

to specifications for controls and electrical designs.

. Demonstrate self-motivation.

. Demonstrate ability and initiative to get to the heart of a

problem and take it efficiently through to completion.

. Demonstrate good oral and written communication skills with

peers, subordinates, customers and suppliers.

. Experience of working in a team, discussing work with other team

members and presenting ideas and solutions to engineers or

customers.

. Background in the use of computers and data handling including

Microsoft office systems, Word, Excel, Power point, Visio and

Project.

o WORK EXPERIENCE AT UNITED KINGDOM

Company : BALFOUR BEATTY UTILITY SOLUTIONS (BBUSL)

Division : Overhead Line

Position : Foreman Linesman 2 - also function as

Chargehand

Period Covered : July 29, 2012 - December 18, 2014

Job Summary

. Construction and refurbishment of overhead line 275

transmission line projects of the company.

Job Description

1. Ensure timely completion of overhead transmission line

projects that comply to design specifications and

construction standards.

2. Correctly use and maintain the general and special tools of

the trade including power tools, test equipment and measuring

instruments.

3. Run out, tension, sag, bind in, joint, bond and terminate all

commonly used conductors and service cables.

4. Supervising Groundmen and Apprentices.

5. Install insulators, fastening components and accessories.

6. Operating specialized plant ( Winches, Capstan Tractors and

John Deere 5090)

7. Conduct joint pole staking with design engineer.

WORK EXPERIENCE AT PHILIPPINES

Company : MANILA ELECTRIC COMPANY (MERALCO)

Division : Sub-transmission Line - Line Construction

Position : Transmission Line Engineer

Period Covered : April 27, 2013 - May 1, 2008

September 30, 2003 - December 31, 2005

Job Summary

. Construction of overhead and underground 115 and 69kV sub-

transmission line projects of the company.

Job Description

1. Ensure timely completion of transmission and sub-transmission

line projects that comply to design specifications and

construction standards.

2. Interpret engineering plan and conducts field survey to

identify.

a. Obstructions and accessibility to worksite(s).

b. Required tools and equipment.

c. Affected sub-transmission and distribution line

circuits.

8. Conduct field survey to assess feasibility of the engineering

plan.

9. Conduct joint pole staking with design engineer.

1. Ensure timely completion of transmission and sub-transmission

line projects that comply to design specifications and

construction standards.

2. Interpret engineering plan and conducts field survey to

identify.

a. Obstructions and accessibility to worksite(s).

b. Required tools and equipment.

c. Affected sub-transmission and distribution line

circuits.

10. Conduct field survey to assess feasibility of the engineering

plan.

11. Conduct joint pole staking with design engineer.

12. Assign electrical capital projects or work orders to

contractor (LSCP or Bid project).

13. Monitoring compliance of transmission and sub-transmission

line construction crews to design specifications,

construction and safety procedure and guidelines.

a. Pole locations

b. Constructive units

c. Electrical clearances

14. Perform substation or line switching during pre-arranged

interruptions

15. Identify affected sub-transmission and distribution line

circuits for:

a. Caution tagging

b. Pre-arranged interruption

c. Isolation

16. Assist in materials handling (requisition and return).

a. Manual

b. WOMS(Work Order Management System)

17. Conduct regular field inspections to monitor work progress

and schedule.

18. Prepare work plan for daily line construction activities.

19. Recommend modification of constructive units to address

changes in field condition or non-availability of line

materials.

20. Determine and implement solution to complex construction and

maintenance problems

21. Check Stores Requisition for surplus and salvage materials to

be returned.

22. Conduct inspection of completed projects prior to

energization.

a. Grounding

b. Armoring

c. Connections

d. Electrical clearances

23. Recommend sub-transmission and distribution line

sectionalizing schemes to:

a. Provide safe working area

b. Minimize affected customers

c. Minimize duration of repair works

24. Prepare monthly reports.

a. Project Status

b. Budget Utilization

c. Other reports

25. Prepare as-built engineering plan for the completed

Electrical Capital Project.

Company : MANILA ELECTRIC COMPANY (MERALCO)

Division : Sub-transmission Line - Central Operation and

Maintenance

Position : Transmission Line Engineer

Period Covered : January 1, 2007 - April 31, 200

Company : MANILA ELECTRIC COMPANY (MERALCO).

Division : Sub-transmission Line - North Operation and

Maintenance

Position : Transmission Line Engineer

Period Covered : January 1, 2006 - December 31, 2006

Job Summary

. Operation, inspection and maintenance of 115 and 69kV sub-

transmission line facilities.

Job Description

1. Receive trouble call from System Control regarding system

line trouble.

a. Respond to trouble call from System Control.

a. Locate trouble site

. Gather qualitative data necessary to evaluate source

of line trouble, e.g. pole and line condition,

location, environment, weather condition, etc.

b. Dispatch line personnel to patrol or locate trouble

site.

c. Determine required resources in responding to line

troubles.

d. Document response time and other vital information for

record purposes.

e. Interpret, report and reset relay targets at affected

substations

f. Perform actual substation switching operations to

isolate line trouble

g. Develop plan of action to address system line trouble.

h. Develop new maintenance activities to prevent recurrence

of line troubles.

2. Plan, develop, schedule and implement annual maintenance

plans.

a. Conduct resource analysis and leveling

b. Cost benefit analysis

c. Prioritize maintenance activities by level of urgency

3. Schedule planned corrective maintenance works and create

maintenance work activities in Maintenance Work Monitoring

System (MWMS)

4. Prepare work plan for daily line maintenance activities.

5. Conduct field inspections:

a. To spot defective and hazardous components

b. To monitor work progress and schedule.

c. To identify existing constructive units that does not

conform to current design and construction standards.

6. Initiate immediate corrective maintenance works without pre-

arranged power interruption

7. Coordinate with:

a. Logistics Office to reserve available equipment for

scheduled maintenance works.

b. Sectors regarding affected distribution line facilities.

c. Telecommunication office regarding foreign attachments.

8. Create planned maintenance work activities in Maintenance

Work Management System (MWMS)

9. Update completed maintenance activities in MWMS

10. Performs ultrasonic detection tests on sub-transmission line

circuits for overheating line components.

11. Prepare maintenance work report.

Company : MANILA ELECTRIC COMPANY (AIMSTAFF seconded)

Division : Transmission Design

Position : Design Engineer

Period Covered : January 28, 2003 - September 30, 2003

Job Summary

. Designs and prepares plans involving extensions, revamp and

maintenance of transmission, distribution and street lighting

facilities of the company.

.

Job Description

1. Determining the technical requirements of the project.

2. Conducts field survey to establish existing facilities and

plan the design of the proposed extension or improvement.

3. Conducts field surveys to ascertain details of construction

and determine other data, such as obstruction and clearances

not indicated on maps, measures distance by pacing, using

rolatape or through other means, and notes down other

observations necessary for finalizing designing scheme.

4. Responsible for the preparation of the detailed design of the

transmission and distribution facilities.

5. Encoding the design specification in WOMS.

6. Conduct pole staking after due consultation with the lot

owners and governments agencies (e.g. MMDA, DPWH, LGU'S and

Barangays).

7. Coordinate various phases of design and related activities

with other design and working units to ensure smooth

workflow, adjust engineering schedules when necessary delays,

performs related duties such as meeting with the contractors,

and/or applicant to verify details and other technical data

affecting projects.

8. Conducts occasional field inspection during construction of

projects to ensure that design specification are followed and

renders on-the-spot decisions to effect field revisions when

necessary to avoid delays in completion of the projects

9. Prepares line / route diagram that will serve as a basis of

the transmission line design AutoCAD released 2008, 2010 and

2012

10. Prepares monthly status report and customer related report

using Microsoft Excel.

11. Prepares bill of materials based on engineering plan.

12. Assists and teaches new Design Engineers basic knowledge in

MSOffice and AutoCAD to be used for the preparation of the

design.

PERSONAL DATA

Provincial Address: San Jose, San Miguel, Bulacan

Date of Birth: September 10, 1980

Place of Birth: Manila

Age: 34 years old

Civil Status Married

Nationality: Filipino

Religion Roman Catholic

Height 182 cm

Weight 75 kg

o EDUCATION:

College: UNIVERSITY OF SANTO TOMAS

Espa a, Manila

1997 - 2002

Degree: Bachelor of Science in Electrical

Engineering

Secondary: Our Lady of Perpetual Succor College

Concepcion, Marikina City

1993 - 1997

Elementary: Our Lady of Perpetual Succor College

Concepcion, Marikina City

1991-1993

Angelicum College

Sto. Domingo Church, Quezon Ave, Quezon City

1987-1991

o LICENSURE EXAMINATION:

Registered Electrical Engineer Registered Master Electrician

Board Rating: 87.75 Board Rating: 76.00

o SEMINARS ATTENDED:

Balfour Beatty Years:

BBUS Philippines Training Center

OHLT/PH12-89 (May 14, 2012 - June 8, 2012)

Attended the following:

. Climbing and use of PPE

. Health and Safety

. Demarcating work areas and danger zones

. Using and Transporting Working Platforms

. Spacer trolley

. Method statements, risk assessments and work instructions

. Using of fall prevention system

. Using of fall arrest system

. Lifting and lowering operation with signaling

. Blocking out - all conductors and bundle types

. Catching off and backhanging

. Fitting and joining conductor stockings

. Phase and earthwire conductor running

. Jointing

. Jumpering

. Installing spacers

. Behavioral training

. Tower assembly and erection

. Basic earthing

. SHEA electric

. Tower Rescue

. Manual Handling

. Slinger Signaller

Tower Rescue (Milan Kit)

PL2091

(May 25, 2012)

BBUS Philippines Training Center

Vehicle Marshalling

PL2051

(July 31, 2012)

Newton Training Center (United Kingdom)

Plant Foundation Training

PL2071

(May 25, 2012)

Newton Training Center (United Kingdom

Meralco Years:

My Career In Meralco

July 7 - 8, 2009

Meralco, Training and Development

MMLDC, Antipolo City

Elementary ABC Work \shop

June 25 - 26, 2008

Meralco, Training and Development

Meralco Ortigas

Power Cable Termination II

November 27 - 30, 2007

The Association of Overseas Technical Scholarship (AOTS)

3M Building, South Expressway

Enhancing Communication At Work II

June 20 - 23, 2007

Meralco, Training and Development

Meralco Ortigas

Awakening The Leader In You

WOMS Enhancement Training for

Sub-Transmission

July 27 - 28, 2006

Meralco, Training and Development

Meralco Ortigas

Maintenance Work Management System User's For Sub-Transmission (Team

Leaders)

June 28, 2006

Meralco, Training and Development

Meralco San Joaquin, Pasig City

ISO 9000:2000

Orientation and Documntation Seminar

May 24 - 25, 2006

Meralco, Training and Development

Meralco Ortigas

Enhancing Communication At Work I

May 17 - 19, 2006

Meralco, Training and Development

Meralco Ortigas

Trainor's Training

April 25 - 26, 2006

Meralco, Training and Development

Meralco Ortigas

Defensive Driving Seminar

February 2 - 4, 2005

Meralco, Training and Development

Meralco Ortigas

College Years:

Wiring System Design

August 20 - 22, 2002

Powerline Review Center

Espa a, Manila

Electrical Estimate

August 27 - 29, 2002

Powerline Review Center

Espa a, Manila

Electrical Layout and Design

University of Santo Tomas

Espa a, Manila

Basic Estimate on Electrical Control

University of Santo Tomas

Espa a, Manila

Electrical Estimate

University of Santo Tomas

Espa a, Manila

.

o REFERENCES

Engr. Mon De Ramos

Head, BBUSL Philippine Branch

Cellphone No. +639*********

Kelly Bevins

BBUSL General Foreman (UK)

Cellphone No. +447*********

Engr. Armin M. Del Rosario

Head, STL - Line Construction

Manila Electric Company

Tel.# 16220 local: 4534 - 771

Antonio U. Talattad

Head, Flux Power Contractor

Flux Power Contractor

Cellphone No. +639*********

Engr. Renato O. Maala

Head, STL - North O&M

Manila Electric Company

Tel.# 16220 local: 8208

Engr. Lewis R. Reyes

Superintendent, STL - Line Construction

Manila Electric Company

Tel.# 16220 local: 4534 - 718

[pic]



Contact this candidate